Project Delivery Issues and Challenges â Geotechnical ... - ictpa-scc
Project Delivery Issues and Challenges â Geotechnical ... - ictpa-scc
Project Delivery Issues and Challenges â Geotechnical ... - ictpa-scc
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Primary GEOTECHNICAL SERVICES WORK<br />
PRODUCTS IN THE WORKPLAN STANDARDS<br />
GUIDE<br />
<strong>Project</strong> Phase WBS for Structures Design Products WBS for District Design Products<br />
Planning – “K”<br />
150.15.30 - Structures Advance<br />
Planning Study (APS)<br />
Prepare Structures Preliminary <strong>Geotechnical</strong> Report (SPGR)<br />
150.15.20 - District Preliminary <strong>Geotechnical</strong><br />
Report (DPGR)<br />
Prepare District Preliminary <strong>Geotechnical</strong> Report (DPGR)<br />
<strong>Project</strong> Initiation – “0”<br />
Design – “1”<br />
160.10.85 - Structures Advance<br />
Planning Study (APS)<br />
Prepare or update Structures Preliminary <strong>Geotechnical</strong><br />
Report (SPGR)<br />
240.65 - Preliminary Foundation<br />
Reports<br />
Prepare Preliminary Foundation Report (PFR)<br />
240.80 - Foundation Reports<br />
Prepare Foundation Report (FR)<br />
160.10.80 - Updated <strong>Geotechnical</strong> Information<br />
Prepare or update District Preliminary <strong>Geotechnical</strong> Report (DPGR)<br />
185.20.15 - Preliminary <strong>Geotechnical</strong> Design<br />
Report (PGDR)<br />
Prepare Preliminary <strong>Geotechnical</strong> Design Report (PGDR)<br />
230.05.70.15 - <strong>Geotechnical</strong> Design<br />
Report (GDR)<br />
Prepare <strong>Geotechnical</strong> Design Report (GDR)