21.01.2014 Views

Sets and Parameters - iea-etsap

Sets and Parameters - iea-etsap

Sets and Parameters - iea-etsap

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Set ID 17<br />

Indexes 18<br />

rps_s1<br />

(r,p,s)<br />

rps_s2<br />

(r,p,s)<br />

rreg<br />

(all_reg,all_r)<br />

rs_below<br />

(all_r,ts,s)<br />

rs_below1<br />

(all_r,ts,s)<br />

rs_tree<br />

(all_r,ts,s)<br />

rtc_cumnet<br />

(r,t,c)<br />

rtc_cumprd<br />

(r,t,c)<br />

rtcs_sing<br />

(r,t,c,s,io)<br />

rtcs_varc<br />

(r,t,c,s)<br />

rtp = rvp<br />

(r,v,p)<br />

rtp_cptyr<br />

(r,v,t,p)<br />

rtp_off<br />

(r,t,p)<br />

rtp_qact<br />

(r,t,p)<br />

rtp_vara<br />

(r,t,p)<br />

rtp_varp<br />

(r,t,p)<br />

rtp_vintyr<br />

(r,v,t,p)<br />

rtpc<br />

(r,v,p,c)<br />

Description<br />

All (permitted) timeslices (s) belonging to the finest timeslice level of<br />

the process (p, prc_tsl) <strong>and</strong> the commodity timeslice level (com_tsl)<br />

of the shadow primary commodity group.<br />

All (permitted) timeslices (s) at or above the finest timeslice level of<br />

the process (p) timeslice level prc_tsl) <strong>and</strong> the commodity timeslice<br />

level (com_tsl) of the shadow primary commodity group.<br />

Indicator that trade exists from region all_reg to region all_r.<br />

All timeslices (s) strictly below the higher timeslice (ts) in the<br />

timeslice tree.<br />

All timeslices (s) immediately (one level) below the higher timeslice<br />

(ts) in the timeslice tree.<br />

For a timeslice (ts) all timeslices (s) that are on the same paths within<br />

the timeslice tree, e.g. if ts=SP WD in Fig. 6, valid timeslices s are:<br />

ANNUAL, SP, SP_WD, SP_WD_D, SP_WD_N<br />

Indicator that the commodity net variable (VAR_COMNET) for<br />

commodity c in region r for period t has a cumulative bound applied.<br />

Indicator that the commodity production variable (VAR_COMPRD)<br />

for commodity c in region r for period t has a cumulative bound<br />

applied.<br />

Indicator that a commodity c is not available in a specific period t <strong>and</strong><br />

timeslice s, since the only processes producing (io = ‘OUT’) or<br />

consuming the process (io = ‘IN’) are turned-off.. In the case of io =<br />

‘OUT’, the commodity is not available meaning that processes, which<br />

have only this commodity as input, cannot operate. Similar reasoning<br />

applies to the case io = ‘IN’.<br />

For commodity (c) in region (r) indicator for the timeslices (s) <strong>and</strong> the<br />

periods (t) the commodity is available.<br />

Indication of the periods <strong>and</strong> pastyears for which process (p) in region<br />

(r ) is available; all other RTP_* control sets are based on this set.<br />

For each vintage period (v) an indication of the periods (t) for which<br />

newly installed capacity of process (p) in a region (r)is available,<br />

taking into account construction lead-time (NCAP_ILED) <strong>and</strong><br />

technical lifetime (NCAP_TLIFE).<br />

Indication of the periods (t) in which no new investment is permitted<br />

for a process (p) in a region (r).<br />

Indicator that a bound on process activity (ACT_BND) of a process p<br />

in a region r can be applied directly to the activity variable<br />

(VAR_ACT); used in reduction algorithm.<br />

Indication of the periods (t) for which a process (p) in a region (r) is<br />

available.<br />

Indicator that the capacity variable (VAR_CAP) will be generated for<br />

process (p) in a region (r) in period (t).<br />

An indication of for which periods (t) a process (p) in a region (r) is<br />

available since it was first installed (v); for vintaged processes<br />

(prc_vint) identical to rtp_cptyr, for non-vintaged processes the v<br />

index in the rtp_cptyr entries is ignored by setting it to t (v = t).<br />

For a process (p) in a region (r) the combination of the periods it is<br />

available (rtp) <strong>and</strong> commodities associated with it (rpc).<br />

36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!