Industrial Space Day for GMES Sentinel-1 Mission - Emits - ESA
Industrial Space Day for GMES Sentinel-1 Mission - Emits - ESA
Industrial Space Day for GMES Sentinel-1 Mission - Emits - ESA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Industry <strong>Day</strong> <strong>for</strong> <strong>GMES</strong> <strong>Sentinel</strong>-1 <strong>Mission</strong><br />
12 th April 2007<br />
NH Leeuwenhorst, Noordwijkerhout<br />
With the present announcement, the Agency would like to in<strong>for</strong>m EMITS Users<br />
(European Companies and Institutes) of a presentation of the <strong>GMES</strong> <strong>Sentinel</strong>-1<br />
Programme and its procurement opportunities to take place on 12 th April 2007 in<br />
NH Leeuwenhorst, Langelaan 3, 2211 NT Noordwijkerhout<br />
Tel. +31-252-378888, Fax. +31-252-378890<br />
http://www.nh-hotels.com <strong>for</strong> directions and map<br />
1. <strong>GMES</strong> <strong>Sentinel</strong>-1 <strong>Mission</strong><br />
The overall objective of the Global Monitoring <strong>for</strong> Environment and Security<br />
(<strong>GMES</strong>) initiative is to support Europe’s goals regarding sustainable development and<br />
global governance of the environment by providing timely and quality data,<br />
in<strong>for</strong>mation, services and knowledge.<br />
<strong>GMES</strong> serves two main policy requirements <strong>for</strong> Europe, including those of the<br />
European Union (EU) and <strong>ESA</strong> Member States, regarding the need <strong>for</strong> geo-spatial<br />
in<strong>for</strong>mation services. Firstly, <strong>GMES</strong> provides independent access to in<strong>for</strong>mation <strong>for</strong><br />
policy and decision makers in order to advance European and national agendas related<br />
to environment and security policies. Secondly, <strong>GMES</strong> federates European<br />
contributions to the international Global Earth Observation System of Systems,<br />
GEOSS, which is established based on the 10-year implementation plan adopted at<br />
the Third Earth Observation Summit held in Brussels in February 2005.<br />
The objective of the <strong>GMES</strong> <strong>Space</strong> Component programme is to fulfill the space-based<br />
observation requirements in response to European policy priorities with a particular<br />
emphasis on the pilot services identified <strong>for</strong> early implementation. It aims at full<br />
operational provision of satellite data <strong>for</strong> <strong>GMES</strong> services.<br />
The <strong>GMES</strong> <strong>Space</strong> Component program includes the following instruments or sensing<br />
capabilities, which are grouped into “<strong>Sentinel</strong>s”:<br />
<strong>Sentinel</strong>-1 a C-band interferometric radar mission;<br />
<strong>Sentinel</strong>-2 a multi-spectral optical imaging mission;<br />
<strong>Sentinel</strong>-3 a mission with wide-swath low-medium resolution optical and<br />
infrared radiometers and a radar altimeter package.<br />
FIRE: A radiometer <strong>for</strong> tactical monitoring of hot spot terrestrial events<br />
<strong>Sentinel</strong>-1 is an imaging radar mission, aimed at providing continuity of crucial data<br />
<strong>for</strong> user services, and in particular <strong>for</strong> mapping urban areas and environmental impact,<br />
assessing land surface motion, surveillance of the marine environment, monitoring of<br />
the Arctic, <strong>for</strong>est monitoring and water and flood management soil protection, global<br />
services <strong>for</strong> food security and humanitarian aid in crisis situations.<br />
Due to the limited lifetime of ERS-2 and Envisat there is a high risk of interrupting<br />
access to critical data sets <strong>for</strong> ongoing services after 2009/2010.<br />
Page 1
<strong>Sentinel</strong>-1 is envisaged as a two-satellite system, each carrying a C-band Synthetic<br />
Aperture Radar (SAR), operated as a constellation <strong>for</strong> maximized coverage and<br />
revisit, namely:<br />
- Daily coverage of European coastal waters and main transport zones;<br />
- Daily coverage of Arctic environment and sea-ice zones <strong>for</strong> marine operations,<br />
and regional weather <strong>for</strong>ecasting;<br />
- Bi-weekly interferometric observations over the entire European land mass;<br />
- Routine acquisition of imagery both interferometric and non-interferometric<br />
anywhere in the world.<br />
2. Procurement Plan Presentation<br />
Following a competitive procurement process, the Agency has selected Alcatel Alenia<br />
<strong>Space</strong> (I) as the Prime Contractor <strong>for</strong> the Implementation Phase Contract <strong>for</strong> the<br />
<strong>Sentinel</strong>-1 <strong>Mission</strong>.<br />
Very soon, the Agency expects to authorize Alcatel Alenia <strong>Space</strong> to proceed with the<br />
competitive procurement process in order to build up the remainder of the <strong>Sentinel</strong>-1<br />
industrial team in compliance with <strong>ESA</strong> Code of Best Practices.<br />
While at a later stage each procurement <strong>for</strong>eseen in competition would be announced<br />
on EMITS EE ahead of the actual release of the related ITT on EMITS EE, it has been<br />
considered opportune by Alcatel Alenia <strong>Space</strong> and <strong>ESA</strong> to in<strong>for</strong>m as soon as possible<br />
candidate subcontractors of the various subsystem and equipment procurement<br />
opportunities as well as the procurement planning and procedure.<br />
To this effect, an Industry <strong>Day</strong> will take place at NH Leeuwenhorst on 12 th April<br />
2007.<br />
Should you be interested to participate please notify your interest not later than 27 th<br />
March 2007 to:<br />
- <strong>ESA</strong> : Ms Nadja Koppelmann-Lokas<br />
e-mail: Nadja.Koppelmann@esa.int<br />
Please note that <strong>for</strong> logistic reasons a maximum of 2 participants per Company can be<br />
allowed.<br />
Page 2
The provisional agenda of the <strong>Sentinel</strong>-1 Industry <strong>Day</strong> is:<br />
1. Introduction<br />
2. <strong>Mission</strong> Objectives<br />
3. S1 S/C technical description<br />
4. S1 <strong>Industrial</strong> roles (core team) & Development Schedule<br />
5. Procurement rules (Best Practices, <strong>ESA</strong> and Industry roles).<br />
o Contractual Phased Approach<br />
o Geo-return Requirements<br />
6. Overview of items to be procured via Best Practices<br />
7. Procurement Calendar (typical + detailed)<br />
8. Splinter sessions <strong>for</strong> group of Procurements<br />
8.a.<br />
8.b.<br />
8.c.<br />
8.d.<br />
8.e.<br />
Mechanical & Thermal, MGSE<br />
List of items to be procured. For each item:<br />
- Summary description (main reqmts)<br />
- Procurement Calendar<br />
Power, Electrical, Harness, EGSE<br />
List of items to be procured. For each item:<br />
- Summary description (main reqmts)<br />
- Procurement Calendar<br />
Avionics and Propulsion<br />
List of items to be procured. For each item:<br />
- Summary description (main reqmts)<br />
- Procurement Calendar<br />
Digital Electronics, RF Units, Antennas<br />
List of items to be procured. For each item:<br />
- Summary description (main reqmts)<br />
- Procurement Calendar<br />
Software items<br />
List of items to be procured. For each item:<br />
- Summary description (main reqmts)<br />
- Procurement Calendar<br />
The event will start at 09:00 hrs and will end no later than 16:45 hrs.<br />
Page 3