PRE INSTALLATION INSTRUCTIONS AND DELIVERY CONSIDERATIONS<br />
<strong>Steam</strong> <strong>Room</strong> Assembly...<br />
The Regal <strong>Steam</strong> <strong>Room</strong> is a Freest<strong>and</strong>ing Unit <strong>and</strong> should not be built into the room. This ensures<br />
quick <strong>and</strong> easy access to the unit for servicing <strong>and</strong> installation. One Great feature of this<br />
steam room is the ability to install it somewhere else in you home after initial installation<br />
Weight / Quantity of Delivery Boxes...<br />
This steam room is extremely well packaged <strong>and</strong> will be delivered in multiple wooden crates.<br />
The packaging of this particular steam room is as follows...<br />
BOX 1<br />
Box Dimensions: 105cm x 105cm x 44cm<br />
BOX 2<br />
Box Dimensions: 200cm x 141cm x 56cm<br />
TOTAL WEIGHT: (inc. packaging)<br />
213kg<br />
2 or more people will be required to<br />
lift each box to place of installation<br />
Electrical Connnections...<br />
- A 16 AMP electrical supply is required for for this steam room to work<br />
- This unit is supplied with an RCD (Residual Current Device) reset switch on the unit flex<br />
- This steam room can be wired via an I.P. 56 Socket wired directly to the consumer box<br />
- WE RECOMMEND USING A QUALIFIED ELECTRICIAN<br />
DUCHY THE MARK OF QUALITY
Duchy<br />
THE MARK OF QUALITY<br />
REGAL<br />
PRE INSTALLATION INSTRUCTIONS AND DELIVERY CONSIDERATIONS<br />
F1<br />
<strong>Plumb</strong>ing Considerations...<br />
Both Hot & Cold water supplies must be of high pressure.<br />
(minimum of 9 litres per minute per water feed - combined<br />
LPM of18). The unit requires a supply pressure of 2.5-3.0<br />
bar, typically provided by a:<br />
1: Combi Boiler<br />
2: Pressurised Pump,or<br />
3: Pressurised Cylinder<br />
- Pipework must be recessed to allow the finished unit to<br />
sit flush against the wall.<br />
- Use full bore water lever ball valves for<br />
hot <strong>and</strong> cold supply to enable quick <strong>and</strong><br />
easy shutoff of the supply. (see F3)<br />
F3<br />
F4<br />
The unit comes pre-connected with a flexible waste hose<br />
fitting. This flexible hose can be connected to the rooms<br />
built in waste pipe <strong>and</strong> exit as shown in F2.<br />
F2<br />
WALL<br />
20 - 30mm 20 - 30mm<br />
WALL<br />
ENSURE THAT ALL WALL AND FLOORS ARE LEVEL<br />
Tiling Considerations...<br />
Prior to installation it is recommended to tile both behind<br />
<strong>and</strong> below the unit, including a clearance around the unit<br />
to avoid “building in” <strong>and</strong> the unecessary moving of the<br />
installed steam shower. See F4<br />
9001<br />
14000<br />
DUCHY THE MARK OF QUALITY<br />
9002