PRE INSTALLATION INSTRUCTIONS AND DELIVERY CONSIDERATIONS<br />

<strong>Steam</strong> <strong>Room</strong> Assembly...<br />

The Regal <strong>Steam</strong> <strong>Room</strong> is a Freest<strong>and</strong>ing Unit <strong>and</strong> should not be built into the room. This ensures<br />

quick <strong>and</strong> easy access to the unit for servicing <strong>and</strong> installation. One Great feature of this<br />

steam room is the ability to install it somewhere else in you home after initial installation<br />

Weight / Quantity of Delivery Boxes...<br />

This steam room is extremely well packaged <strong>and</strong> will be delivered in multiple wooden crates.<br />

The packaging of this particular steam room is as follows...<br />

BOX 1<br />

Box Dimensions: 105cm x 105cm x 44cm<br />

BOX 2<br />

Box Dimensions: 200cm x 141cm x 56cm<br />

TOTAL WEIGHT: (inc. packaging)<br />

213kg<br />

2 or more people will be required to<br />

lift each box to place of installation<br />

Electrical Connnections...<br />

- A 16 AMP electrical supply is required for for this steam room to work<br />

- This unit is supplied with an RCD (Residual Current Device) reset switch on the unit flex<br />

- This steam room can be wired via an I.P. 56 Socket wired directly to the consumer box<br />

- WE RECOMMEND USING A QUALIFIED ELECTRICIAN<br />

DUCHY THE MARK OF QUALITY


Duchy<br />

THE MARK OF QUALITY<br />

REGAL<br />

PRE INSTALLATION INSTRUCTIONS AND DELIVERY CONSIDERATIONS<br />

F1<br />

<strong>Plumb</strong>ing Considerations...<br />

Both Hot & Cold water supplies must be of high pressure.<br />

(minimum of 9 litres per minute per water feed - combined<br />

LPM of18). The unit requires a supply pressure of 2.5-3.0<br />

bar, typically provided by a:<br />

1: Combi Boiler<br />

2: Pressurised Pump,or<br />

3: Pressurised Cylinder<br />

- Pipework must be recessed to allow the finished unit to<br />

sit flush against the wall.<br />

- Use full bore water lever ball valves for<br />

hot <strong>and</strong> cold supply to enable quick <strong>and</strong><br />

easy shutoff of the supply. (see F3)<br />

F3<br />

F4<br />

The unit comes pre-connected with a flexible waste hose<br />

fitting. This flexible hose can be connected to the rooms<br />

built in waste pipe <strong>and</strong> exit as shown in F2.<br />

F2<br />

WALL<br />

20 - 30mm 20 - 30mm<br />

WALL<br />

ENSURE THAT ALL WALL AND FLOORS ARE LEVEL<br />

Tiling Considerations...<br />

Prior to installation it is recommended to tile both behind<br />

<strong>and</strong> below the unit, including a clearance around the unit<br />

to avoid “building in” <strong>and</strong> the unecessary moving of the<br />

installed steam shower. See F4<br />