21.05.2014 Views

2010 FERC Form 1 - Pacific Gas and Electric Company

2010 FERC Form 1 - Pacific Gas and Electric Company

2010 FERC Form 1 - Pacific Gas and Electric Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Name of Respondent<br />

This Report Is:<br />

Date of Report<br />

(1) X An Original<br />

(Mo, Da, Yr)<br />

PACIFIC GAS AND ELECTRIC COMPANY<br />

(2) A Resubmission<br />

04/08/2011<br />

CONSTRUCTION WORK IN PROGRESS - - ELECTRIC (Account 107)<br />

Year/Period of Report<br />

End of <strong>2010</strong>/Q4<br />

1. Report below descriptions <strong>and</strong> balances at end of year of projects in process of construction (107)<br />

2. Show items relating to "research, development, <strong>and</strong> demonstration" projects last, under a caption Research, Development, <strong>and</strong> Demonstrating (see<br />

Account 107 of the Uniform System of Accounts)<br />

3. Minor projects (5% of the Balance End of the Year for Account 107 or $1,000,000, whichever is less) may be grouped.<br />

Line<br />

No.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

32<br />

33<br />

34<br />

35<br />

36<br />

37<br />

38<br />

39<br />

40<br />

41<br />

42<br />

Description of Project Construction work in progress -<br />

<strong>Electric</strong> (Account 107)<br />

(a)<br />

(b)<br />

5721839 Woodside Sub: Replace Bank 1<br />

3,169,391<br />

5729177 Sierra Lincoln: Replace Bank #2<br />

3,120,406<br />

5732653 Marysville - Plumas Re-conductor<br />

3,114,881<br />

5737999 NRC Force on Force Items<br />

3,070,841<br />

5717295 Work at the Request of Others Rule 20A - Yosemite<br />

3,038,744<br />

5736438 SmartMeter - Peak Time Rebate (PTR)<br />

3,021,972<br />

5733680 COM:FWST 0-1 Internal Refurbishing & Pipe Repladement<br />

3,000,253<br />

5733750 Replace Auxiliary Board Phase 4A<br />

2,956,133<br />

5734859 Condition Based Maintenance implementation, Transmission Substation<br />

2,941,967<br />

5738905 Chowchilla-Le Gr<strong>and</strong> 115 kV Reconductor<br />

2,844,779<br />

5705779 Relicense Transmission Lines<br />

2,840,176<br />

5507682 Replace Deteriorated Boardwalks<br />

2,834,776<br />

5729887 Cassidy: Replace Bank #1<br />

2,789,344<br />

5721938 Holdover Permit Project<br />

2,777,821<br />

5731721 South Coast - Burns Sub Reliability<br />

2,770,181<br />

5732690 Sobrante MPAC<br />

2,676,015<br />

5717280 Work at the Request of Others Rule 20A - Diablo<br />

2,673,162<br />

5728078 Helms - Replace Relays<br />

2,534,756<br />

5737463 Smart Meter - Restoration Validation (Release G)<br />

2,518,854<br />

5732697 Sanger 115 kV MPAC<br />

2,515,856<br />

5738458 Los Banos 230 kV MPAC<br />

2,501,132<br />

5737919 Midway Sub: Bank 1 Replacement Upgrades<br />

2,497,921<br />

5734604 Valley Springs 230/60 kV MPAC<br />

2,477,577<br />

5733785 Ignacio - 230kV MPAC<br />

2,471,463<br />

5740698 Bellota 230 kV MPAC<br />

2,432,125<br />

5506659 Permit Project<br />

2,397,024<br />

5731264 Midway - Replace Circuit Switchers W/ 500kV Circuit Breakers<br />

2,327,319<br />

5733058 Tri-Valley Voltage Control<br />

2,309,979<br />

5732778 Purch 1ph 40MVA230-115x70x60 Mobile<br />

2,266,664<br />

5735119 South Valley - Henrietta 70 kV Bus<br />

2,180,416<br />

5732721 East Bay - Elk Creek 60kV Tap<br />

2,174,684<br />

5740338 San Le<strong>and</strong>ro U: Emergency Replace Bank<br />

2,139,126<br />

5726301 U2:Replace SPDS System<br />

2,083,100<br />

5721854 Napa Sub: Install Bnk # 3 <strong>and</strong> Feeder<br />

2,082,571<br />

5734022 Replace Vaca-Dixon Bank #6<br />

2,077,621<br />

5728905 Sacramento - Hartley Sub: Install 6<br />

2,053,435<br />

5717289 Work at the Request of Others Rule 20A - Peninsula<br />

1,994,680<br />

5733412 U1:Replace SPDS System<br />

1,987,442<br />

5737141 Transbay Transit Center <strong>Electric</strong> Relocation<br />

1,965,350<br />

5506639 Distribution Mobile Replacement Program<br />

1,956,772<br />

5738573 Replace failed Mobile T-45.0-8, purch 45MVA<br />

1,949,446<br />

5733408 DCPP Unit 1:Upgrade Polar Crane Control Systems<br />

1,932,521<br />

43 TOTAL 1,016,902,985<br />

<strong>FERC</strong> FORM NO. 1 (ED. 12-87) Page 216.2