Energy, Jobs and Skills - Repoa
Energy, Jobs and Skills - Repoa
Energy, Jobs and Skills - Repoa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Plan, <strong>and</strong> was fast-tracked from its original 2023, to go on line in 2012 after Government<br />
approval was received in July 2008 20 .<br />
Figure 5: Proposed TanGen connection to National Grid<br />
U G A N D A<br />
R W A N D A<br />
Mwanza<br />
Nairobi<br />
K E N YA<br />
B U R U N D I<br />
Arusha<br />
Kahama<br />
Mombasa<br />
Tabora<br />
Democratic<br />
Republic<br />
of Congo<br />
Dodoma<br />
T A N Z A N I A<br />
Kidatu<br />
Mbeya<br />
Makambako<br />
Dar es Salaam<br />
Njombe<br />
Lindi<br />
Zambia<br />
Proposed connection<br />
Malawi<br />
Songea<br />
Masasi<br />
Mtwara<br />
The Artumas Group has sub-contracted Manitoba Hydro International to manage the<br />
transmission <strong>and</strong> distribution of electricity within the Mtwara <strong>Energy</strong> Project, while it focuses<br />
on its core competence – exploration, appraisal <strong>and</strong> development of oil <strong>and</strong> gas resources.<br />
The continued exploration <strong>and</strong> assessment of Mnazi Bay reveal that oil <strong>and</strong> other<br />
hydrocarbons may be present, <strong>and</strong> the company plans to follow these leads with further<br />
exploratory studies <strong>and</strong> drilling.<br />
20<br />
Artumas 2009<br />
17