11.07.2014 Views

Appendix I: Cover Letter (ON LETTER HEAD OF THE ... - IDCO

Appendix I: Cover Letter (ON LETTER HEAD OF THE ... - IDCO

Appendix I: Cover Letter (ON LETTER HEAD OF THE ... - IDCO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Appendix</strong> I: <strong>Cover</strong> <strong>Letter</strong><br />

(<strong>ON</strong> <strong>LETTER</strong> <strong>HEAD</strong> <strong>OF</strong> <strong>THE</strong> INTERESTED PARTY –SINGLE BIDDER/ LEAD MEMBER<br />

IN CASE <strong>OF</strong> A C<strong>ON</strong>SORTIUM)<br />

Date:<br />

To,<br />

Director, Angul Aluminium Company Pvt. Ltd<br />

PMU, <strong>IDCO</strong><br />

<strong>IDCO</strong> Towers, Janpath<br />

Bhubaneswar -751022<br />

Sub: Submission of EOI for participating in the proposed Aluminium Park at Angul,<br />

Orissa (the ‘Project’)<br />

Dear Sir,<br />

1 We are submitting the EOI on our own.<br />

OR<br />

We are submitting this EOI as the Lead Member of a Consortium, consisting of the<br />

following members, for and on behalf of the Consortium.<br />

S. Names of Consortium Members<br />

No.<br />

1. ………………………………….….<br />

(Lead Member)<br />

2. ……………………………………..<br />

(Member)<br />

Address of Registered Office<br />

2 With reference to your Invitation for EOI document dated……… (IEOI), I/We, having<br />

examined the IEOI Document thoroughly and understood its contents and I/We the<br />

undersigned am/are hereby expressing our interest to setup a __________________unit at<br />

Angul Aluminium Park , and we certify that all information provided therein is true and<br />

correct; nothing has been omitted which renders such information misleading; and all<br />

documents accompanying the EOI are true copies of their respective originals.<br />

3 I/We understand that the purpose of this EOI is to create initial awareness about the


proposed Project for prospective investors/entrepreneurs associated with the Aluminium<br />

sector, induction of prospective unit holders/anchor tenants in the Project at the initial<br />

stage to attain the ‘critical mass’ to carry forward the project and receive inputs/concepts<br />

in developing the project contours with regards to nature of products, plot sizes required,<br />

infrastructure requirements, common facilities , O&M facilities and other relevant<br />

details.<br />

3. I/ We shall make available to AAPPL any additional information it may find necessary or<br />

require to supplement or authenticate the EOI.<br />

4. I/ We acknowledge and understand that AAPPL may, in its absolute discretion but<br />

without being under any obligation to do so, update, amend or supplement the<br />

information, assessment or assumptions contained in this IEOI. I/ We further<br />

acknowledge that the issue of this IEOI does not imply that AAPPL is bound to<br />

undertake the project and/or select Interested Parties for setting up their units in the<br />

proposed Aluminium Park and/or allot land to the Interested Parties within the Site for<br />

proposed Project or even otherwise and AAPPL reserves the right to reject all or any of<br />

the submissions hereunder without assigning any reasons whatsoever and , without<br />

incurring any liability to the Interested Parties and any third person claiming under/through it.<br />

5. I/We unconditionally acknolwledge & confirm that this EOI would not be construed to<br />

result in any commitment, on part of AAPPL/NALCO/<strong>IDCO</strong>/Government of Orissa<br />

(GoO), to the allotment of land within the Aluminium Park or even otherwise and, we<br />

hereby waive, to the fullest extent permitted by applicable law, our right to challenge or<br />

dispute the same on any account whatsoever.<br />

6. I/We understand that we satisfy the Minimum Requirements to participate in this EOI<br />

process as outlined in “Part II – Instructions for Submission” –Clause 3 of the EOI<br />

document and have prepared our EOI for the captioned Project as specified in “Part II –<br />

Instructions for Submission” –Clause 4 of the EOI document. In addition to submission<br />

of the above, we may be required to make a presentation to AAPPL covering all the<br />

aspects as submitted in our expression of interest to participate in the Project in the form<br />

& manner intimated by AAPPL.<br />

7. I/We also understand that in case our EOI is accepted, i/we shall be required to adhere to<br />

and confirm to the Project specific requirements in terms of the single window clearance<br />

system for industrial projects in the State and other statutory requirements.


8. I/ We hereby irrevocably waive any right or remedy which we may have at any stage at<br />

law or howsoever otherwise arising to challenge or question any decision taken by<br />

AAPPL/NALCO/<strong>IDCO</strong>/GoO in connection with the selection of the Interested Party<br />

and/or Operators for setting up their units in the proposed Aluminium Park and/or<br />

allotment of land to the Interested Parties within the Site for proposed Project, or in<br />

connection with this EOI process itself, in respect of the above mentioned Project and the<br />

terms and implementation thereof.<br />

___________________________<br />

(Name of the authorized Signatory of the Interested Party)<br />

___________________________<br />

(In the capacity of)<br />

Company Seal<br />

___________________________<br />

(Name of the Entity)<br />

**To submit additionally MoU between two members in case of a Consortium


<strong>Appendix</strong> II: Details of Interested Party<br />

S. No Particulars Details<br />

1. Basic Information of Organisation<br />

a) Name of Firm<br />

b) Country of incorporation<br />

c) Address of the corporate headquarters and its branch<br />

office(s), if any, in India<br />

d) Date of incorporation and / or commencement of<br />

business<br />

e) Ownership of the Organisation 1.<br />

2.<br />

3.<br />

f) List of current directors<br />

2. Brief description of the Company including details<br />

of its main lines of business.<br />

3. Details of individual (s) who will serve as the point<br />

of contact/communication within the Company:<br />

(a) Name<br />

(b) Designation<br />

(c) Address<br />

(d) Telephone Number<br />

(e) E-Mail Address<br />

(f) Fax Number<br />

4. Particulars of the Authorized Signatory of the<br />

Applicant:<br />

(a) Name<br />

(b) Designation<br />

(c) Address<br />

(d) Telephone Number<br />

(e) E-Mail Address<br />

(f) Fax Number<br />

• Company Brochures may be attached<br />

• To be filled separately by individual members in case of a Consortium


<strong>Appendix</strong> III: Details of Existing Plants and Manufacturing Facilities<br />

Sl. No. Item Particulars of the Project<br />

1 Plant location and address<br />

2 Key contact person for plant with<br />

contact number<br />

3 Land Area in acres<br />

4 Brief description of activities<br />

5 Manufactured items with quantities<br />

produced annually<br />

6 Annual Turnover in INR<br />

7 Exports – (product, quantity and<br />

annual turnover) including countries<br />

of export<br />

8 Infrastructure Facilities present-water<br />

supply, power supply, effluent<br />

treatment plant, drainage, other<br />

facilities<br />

9 Equipment and other facilities present<br />

10 Requirement of water, power and<br />

other infrastructure facilities per day<br />

11 Total no. of employees present with<br />

break up (in pay rolls /temporary)<br />

12 Date of commencement of production<br />

13 Expansion Plans if any<br />

14 Other details


*The above format is to be filled up individually for each plant/manufacturing facility<br />

**To be filled separately by individual members wherever applicable in case of a<br />

Consortium


<strong>Appendix</strong> IV: Financial Capacity of Interested Party<br />

Interested<br />

Party Name<br />

In INR million<br />

Annual Turnover Net-worth<br />

2008-09 2009-10 2010-11 March 31, 2011<br />

Instructions:<br />

1. The Interested Party shall attach copies of Annual Reports for 3 (three) years preceding<br />

the EOI submission date duly certified as ‘true’.<br />

2. Net-worth shall mean [Subscribed and Paid Up Equity Share Capital + Reserves &<br />

Surplus – {Revaluation Reserves, Goodwill, Miscellaneous Expenses (to the extent not<br />

written off) and other Intangible Assets}].<br />

3. For any currency other than INR, appropriate conversion to INR may be made at the<br />

prevailing exchange rate as on the scheduled date of submission of the EOI.<br />

4. To be filled separately by individual members in case of a Consortium.


<strong>Appendix</strong> V: Details of Proposed Unit within Project<br />

Sl No. Item Particulars of the Project<br />

1 Product interested in<br />

2 Proposed capacity and phasing<br />

3 Basic Raw Materials required with<br />

quantity and<br />

specifications/quality/technology<br />

requirement on per annum basis<br />

including aluminium in molten form<br />

4 Total Investment Planned with phasing<br />

5 Exports planned if any – (product,<br />

quantity, projected turnover, countries of<br />

export)<br />

6 Plot size required in acres along with<br />

location based preference<br />

7 Employment (direct) generation projected<br />

in phases in coming five years<br />

8 Requirement of power –quantity, quality<br />

and phasing<br />

9 Requirement of water –quantity, quality<br />

and phasing<br />

10 Requirement of logistics support (truck<br />

parking, container depots, railway sidings<br />

etc.) –preferably to quantify requirements<br />

11 Requirement of common raw material<br />

bank if any<br />

12 Requirement of Testing and R&D<br />

Facilities if any<br />

13 Requirement of machine repair shops and<br />

die repair shops if any<br />

14 Requirement of material recycle units if<br />

any<br />

15 Handholding from AAPPL/<strong>IDCO</strong><br />

required<br />

16 Suggestions for logistics planning of<br />

molten aluminium from the NALCO plant<br />

17 Other requirements to specify

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!