13.07.2014 Views

Nanosurf easyScan 2 AFM Operating Instructions

Nanosurf easyScan 2 AFM Operating Instructions

Nanosurf easyScan 2 AFM Operating Instructions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHAPTER 3: PREPARING FOR MEASUREMENT<br />

For stand-alone measurements, put the Scan head directly on top of the sample. Protection<br />

feet to be placed under the three alignment screws are provided to protect delicate<br />

samples from being scratched (Figure 1-2: Contents of the Tool set (page 15), item 2).<br />

3.4.4: The Sample Stage<br />

The Sample Stage (Figure 1-1: Components (page 13), item 8) offers vibration isolation and<br />

reproducible scan head placement (see Figure 3-9: The <strong>easyScan</strong> 2 <strong>AFM</strong> Scan Head on its<br />

Sample Stage), and can be used to comfortably position a sample. An optional Micrometer<br />

Translation Stage for XY-positioning can be mounted on the Sample Stage. The sample can<br />

either be put directly on the sample stage, or mounted onto the Sample Holder (Figure 1-2:<br />

Contents of the Tool set (page 15), item 7) before measurement (see Section 3.4.5: Mounting<br />

a sample).<br />

Figure 3-9: The <strong>easyScan</strong> 2 <strong>AFM</strong> Scan Head on its Sample Stage<br />

3.4.5: Mounting a sample<br />

Samples may either be placed directly onto the sample stage, or first mounted onto the<br />

Sample Holder before being placed there.<br />

To mount a sample onto the Sample Holder:<br />

1 Put a double-sided adhesive tape on the frontside of a Post-it ® note, so that it is on the<br />

opposite side of the sticky part.<br />

2 Cut off all parts of the note that do not have adhesive tape on it.<br />

3 Fix the tape-side of the prepared note to the Sample Holder.<br />

38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!