20.07.2014 Views

Wellbore Quality Characterization for Drilling and Casing Running in ...

Wellbore Quality Characterization for Drilling and Casing Running in ...

Wellbore Quality Characterization for Drilling and Casing Running in ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Wellbore</strong> <strong>Quality</strong> Scorecard – Guidel<strong>in</strong>es<br />

<strong>Drill<strong>in</strong>g</strong> Response (5 po<strong>in</strong>ts)<br />

Severe drill<strong>in</strong>g problems<br />

- stuck pipe<br />

- near stuck pipe <strong>in</strong>cident<br />

Score<br />

Transient drill<strong>in</strong>g problems<br />

- poor hole clean<strong>in</strong>g with high cutt<strong>in</strong>gs bed<br />

2<br />

- severe pack-off<br />

2<br />

- severe loss circulation<br />

2<br />

- erratic torque <strong>and</strong> drag response<br />

3<br />

Torque <strong>and</strong> drag response<br />

- all parameters follow smooth trend<br />

- lower than expected torque <strong>and</strong> drag<br />

F<strong>in</strong>al Trip-out Response (7 po<strong>in</strong>ts)<br />

0<br />

1<br />

4<br />

5<br />

Score<br />

Stuck pipe 0<br />

Residual cutt<strong>in</strong>gs bed / differential stick<strong>in</strong>g<br />

- section length with overpulls > 100 klbs<br />

- section length with overpulls > 50 klbs<br />

Ledges<br />

- isolated overpulls > 100 klbs<br />

- isolated overpulls > 50 klbs<br />

1<br />

2<br />

3<br />

4<br />

<strong>Cas<strong>in</strong>g</strong> <strong>Runn<strong>in</strong>g</strong> Response (8 po<strong>in</strong>ts)<br />

Severe cas<strong>in</strong>g runn<strong>in</strong>g problems<br />

- stuck cas<strong>in</strong>g<br />

- cas<strong>in</strong>g pulled due to downhole problems<br />

Score<br />

Differential stick<strong>in</strong>g environment<br />

- static friction > 100 klbs on connections 1<br />

- static friction > 50 klbs on connections 2<br />

Intervention needed dur<strong>in</strong>g cas<strong>in</strong>g run<br />

- unplanned rotation needed<br />

3<br />

- unplanned circulation needed<br />

4<br />

- jo<strong>in</strong>ts wiped to reduce drag 5<br />

<strong>Cas<strong>in</strong>g</strong> run without significant problems<br />

- elevated but smooth drag levels<br />

6<br />

- achieved expected drag levels<br />

7<br />

- better than expected drag levels 8<br />

Transient tripp<strong>in</strong>g-out problems<br />

- loss circulation<br />

5<br />

- unplanned circulation<br />

5<br />

- unplanned ream<strong>in</strong>g <strong>and</strong> back-ream<strong>in</strong>g 5<br />

Drag response<br />

- smooth drag levels measured throughout<br />

- better than expected drag levels recorded<br />

0<br />

0<br />

6<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!