05.09.2014 Views

The upgradeable Blair VIP (uBVIP) - SuSanA

The upgradeable Blair VIP (uBVIP) - SuSanA

The upgradeable Blair VIP (uBVIP) - SuSanA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>The</strong> construction of this “start off<br />

unit” uses a single bag of<br />

Portland cement, about 500 farm<br />

bricks, sand and some 3mm<br />

wire.<br />

This economical use of cement is<br />

possible because:<br />

1. A well tested mortar mix of<br />

20:1 pit sand and cement works<br />

well as a brick mortar.<br />

2. . <strong>The</strong> corbelling technique<br />

makes possible the use of a<br />

smaller, lighter and more<br />

economic slab.<br />

3. <strong>The</strong> pit is shallower but wider<br />

making it easier to build and<br />

further away from ground water.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!