notebook - Southwest Florida Water Management District

swfwmd.state.fl.us

notebook - Southwest Florida Water Management District

INDIVIDUAL PERMITS ISSUED: ERPS – AUGUST 2012

26

PERMIT

NUMBER

PROJECT

NAME

COUNTY

43027030.054 Wiregrass – Parcel S1 Pasco

43023791.214

43035342.002

43024078.002

Village of Lake Deaton

Master Grading

Shoppes at Meres

Boulevard

Aqui Esta Residential

Development

Sumter

Pinellas

Charlotte

DESCRIPTION

Construction of surface water

management system (mass

grading) to serve a future

residential subdivision

Construction of surface water

management system to serve a

future residential subdivision

Construction of a retail site which

includes the filling of 0.99 acre of

wetland and the mitigation of the

impacts at the North Anclote River

Park

Construction of surface water

management system to serve a

future residential subdivision;

includes docks, boat basin & ramp

TOTAL

PROJECT

ACRES

WETLAND

ACRES

WETLAND

ACRES

IMPACTED

WETLAND

MITIGATION

ACRES

677.30 163.09 6.16 8.17

387.83 124.89 3.62 88.01

6.91 4.40 0.99 3.95

105.83 48.86 9.41 40.61

Wetland Mitigation Acres may be zero or less than Wetland Acres Impacted for a variety of reasons. Some of those reasons

are: impacted wetlands require no mitigation by rule (e.g., upland cut manmade ditches, etc.); quality of the impacted wetlands

is less than the quality of proposed mitigation; or mitigation is provided through a different permit or a mitigation bank.

More magazines by this user
Similar magazines