02.10.2014 Views

Regional Land Transport Programme 2009 - 2010 (2MB) - Auckland ...

Regional Land Transport Programme 2009 - 2010 (2MB) - Auckland ...

Regional Land Transport Programme 2009 - 2010 (2MB) - Auckland ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 10.1: Activity Class 1, <strong>Transport</strong> Planning<br />

Approved<br />

Organisation<br />

Project name Phase Work<br />

category<br />

Objectives<br />

Total cost<br />

($)<br />

<strong>2009</strong>/10 cost<br />

($)<br />

<strong>2010</strong>/11 cost<br />

($)<br />

2011/12 cost<br />

($)<br />

Seriousness<br />

& Urgency<br />

Effectiveness<br />

Efficiency<br />

ACC CBD PT Integration Study<br />

(Committed)<br />

Road studies Integration 485,000 285,000 – –<br />

ACC<br />

Ellerslie Panmure Highway<br />

Corridor Study<br />

Study<br />

(Committed)<br />

Road studies<br />

Access and<br />

mobility<br />

200,000 197,525 – –<br />

ACC<br />

Great North Road<br />

Corridor Study<br />

Study<br />

(Committed)<br />

Road studies<br />

Access and<br />

mobility<br />

150,000 65,504 – –<br />

ACC Onehunga Town Centre Study Study<br />

(Committed)<br />

Road studies<br />

Access and<br />

mobility<br />

100,000 39,000 – –<br />

ACC Selwyn Street Corridor Study Study<br />

(Committed)<br />

Road studies<br />

Access and<br />

mobility<br />

200,000 49,000 – –<br />

NSCC NSCC Freight Study 08-09 Study<br />

(Committed)<br />

Road studies<br />

Economic<br />

development<br />

100,000 70,000 – –<br />

NSCC New: Strategy Studies 2004/05 Study<br />

(Committed)<br />

System use<br />

studies<br />

Access and<br />

mobility<br />

47,488 47,488 – –<br />

NSCC Strategic Corridor Study 08-09 Study<br />

(Committed)<br />

System use<br />

studies<br />

Access and<br />

mobility<br />

265,000 145,000 – –<br />

RDC HBC Traffic Corridor Study Study<br />

(Committed)<br />

Road studies<br />

Access and<br />

mobility<br />

550,000 248,879 – –<br />

WCC<br />

Waitakere Central City<br />

Traffic Modelling<br />

Investigation<br />

(Committed)<br />

Road studies Integration 275,000 70,000 – –<br />

PDC Papakura <strong>Transport</strong> Strategy Study Studies and<br />

strategies<br />

ACC AMETI – PPP (ACC/MCC) Study Studies and<br />

strategies<br />

Integration 385,000 290,000 95,000 – H H NA<br />

Integration 100,000 – – 100,000 H H NA<br />

ACC<br />

AMETI – Bridge widening<br />

study (ACC/MCC)<br />

Study<br />

Studies and<br />

strategies<br />

Integration 300,000 200,000 100,000 – H H NA<br />

ACC<br />

<strong>2009</strong>-12 POA Rail<br />

Freight Study<br />

Study<br />

Studies and<br />

strategies<br />

Economic<br />

development<br />

65,000 65,000 – – H H NA<br />

ARTA RPTP – PT Strategy and Policy Study Studies and<br />

strategies<br />

Access and<br />

mobility<br />

1,370,255 504,277 452,989 412,989 H H NA<br />

MCC<br />

Study – Park and Ride Bus/<br />

Rail Interchange<br />

Implementation Plan<br />

Study<br />

Studies and<br />

strategies<br />

Integration 50,000 – 50,000 – H H NA<br />

MCC<br />

Study – Passenger <strong>Transport</strong><br />

Accessibility Study<br />

Study<br />

Studies and<br />

strategies<br />

Integration 50,000 – – 50,000 H H NA<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!