13.10.2014 Views

pavement design

pavement design

pavement design

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART 2<br />

F<br />

E<br />

E<br />

D<br />

B<br />

A<br />

C<br />

K<br />

INVENTORY<br />

INVENTORY<br />

FLEXIBLE PAVEMENT DESIGN<br />

INPUT<br />

INPUT<br />

INFORMATION<br />

INFORMATION<br />

PERFORMANCE<br />

PERFORMANCE<br />

CRITERIA<br />

CRITERIA<br />

PAVEMENT<br />

PAVEMENT<br />

MODELS<br />

MODELS<br />

PAVEMENT<br />

PAVEMENT<br />

SERVICEABILITY<br />

SERVICEABILITY<br />

PAVEMENT<br />

PAVEMENT<br />

MATERIALS<br />

MATERIALS<br />

PAVEMENT<br />

PAVEMENT<br />

DESIGN<br />

DESIGN<br />

NEW,<br />

NEW,<br />

OVERLAY,<br />

OVERLAY,<br />

REHABILITATION<br />

REHABILITATION<br />

CONSTRUCT<br />

CONSTRUCT<br />

PAVEMENT<br />

PAVEMENT<br />

OR<br />

OR<br />

OVERLAY<br />

OVERLAY<br />

PAVEMENT<br />

PAVEMENT<br />

OR<br />

OR<br />

REHABILITATE<br />

REHABILITATE<br />

PAVEMENT<br />

PAVEMENT<br />

SYSTEMATIC<br />

SYSTEMATIC<br />

PAVEMENT<br />

PAVEMENT<br />

MAINTENANCE<br />

MAINTENANCE<br />

MAINTENANCE<br />

MAINTENANCE<br />

MANAGEMENT<br />

MANAGEMENT<br />

SYSTEM<br />

SYSTEM<br />

PAVEMENT<br />

PAVEMENT<br />

MANAGEMENT<br />

MANAGEMENT<br />

SYSTEM<br />

SYSTEM<br />

PERFORMANCE<br />

PERFORMANCE<br />

MONITORING<br />

MONITORING<br />

SAFE,<br />

SAFE,<br />

SMOOTH,<br />

SMOOTH,<br />

SURFACES<br />

SURFACES<br />

HAPPY<br />

HAPPY<br />

CUSTOMERS<br />

CUSTOMERS<br />

LIFE-CYCLE COST ANALYSIS AND VALUE ENGINEERING<br />

• TRAFFIC (ESALs)<br />

•SUBGRADE<br />

• DRAINAGE CONDITIONS<br />

• ENVIRONMENTAL CONDITIONS<br />

• BUDGET<br />

• RUTTING<br />

•FATIGUE<br />

• THERMAL<br />

•INITIAL<br />

•TERMINAL<br />

• PCI - PSR<br />

•IRI<br />

• SUBBASE<br />

• BASE<br />

• ASPHALT CONCRETE<br />

SUPERPAVE<br />

PGAC, VOLUMETRIC, PERFORMANCE<br />

•GBE<br />

• AASHTO 93<br />

• COMING SOON - AASHTO 2002<br />

• LCCA AND VE<br />

•QC<br />

•QA<br />

• CRACK SEALING<br />

• SUMMER MAINTENANCE<br />

• WINTER MAINTENANCE<br />

• PAVEMENT PRESERVATION<br />

• INVENTORY (DATA BANK)<br />

• MONITOR PERFORMANCE<br />

• NETWORK LEVEL<br />

• PROJECT LEVEL<br />

• BUDGET<br />

• WINTER SURFACE CONDITION<br />

• MOVING TO PMS/MMS/AMS<br />

•PERPETUAL FLEXIBLE PAVEMENTS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!