Bills of Quantity to Construct Thrid floor /<strong>Erbil</strong> Business Information Center<br />
Item Description Unit Qty. Unit Cost Total Cost<br />
2.6<br />
Supply materials and plaster interior ceiling and walls with smooth<br />
cement plastering(1:3) / gypsum , then painting with primer,and two<br />
coats of high aquality plastic paint for lift area., prepare and apply<br />
resin base water proofing acrylic textured decorative coating (the<br />
binder shall be pure acrylic) pigments and binders are resistant to<br />
NO 280.0<br />
weather pollution…etc to be applied in accordance with<br />
manufacturers instructions. According to drawings and engineer's<br />
instructions<br />
2.7<br />
Supply materail , plastering and rendering the external walls with<br />
cement mortar (1:3 )According to drawings and engineer's<br />
instructions<br />
M2 130.0<br />
2.8<br />
Supply material, aluminum and glass to make the new building<br />
façade suitable with the existing building façade.<br />
Total cost for architectural works<br />
3 Plumbing & Mechanical Works<br />
Supply material and install a rainwater roof drainage system using<br />
heavy duty UPVC pipes. Diameter 4", including all necessary fitting ,<br />
3.1<br />
connections, all adhesive as shown on drawings and according to<br />
engineers instructions.<br />
Supply & install aluminum doors (1 x 2.1)m with Italian or Turkish<br />
3.2 doors switch lock and 6mm glass according drawings according to<br />
the engineer instructions.<br />
Supply & install aluminum doors (2 x 2.1)m with Italian or Turkish<br />
3.3 doors switch lock and 6mm glass according drawings according to<br />
the engineer instructions.<br />
Supply and install aluminum or upvc window with frame,hardware,<br />
3.4 6mm glasses and bug screens. Windows shall be able to open and<br />
close.<br />
Supply and install walls with doors, latches and all associated<br />
hardware.to build w/c room Price including all necessary ,fiting<br />
3.5<br />
,supports, connections and all accessories required to make it<br />
functional (that are not shown in drawing).<br />
M2 70.0<br />
M 3.0<br />
No 7.0<br />
No 3.0<br />
M2 23.0<br />
No 4.0<br />
3.6<br />
3.7<br />
Supply and connect third floor to extenal sewage collection network.<br />
Work shall include all UPVC piping , valves, manholes, connections<br />
and sewer service lines as necessary per the approved drawings to<br />
service this floor with building then a sewer drainage requirement.<br />
Price includes fittings, supports, connections and all accessories<br />
required to make the pipes functional.<br />
Supply, install and test appropriately sized interior PVC sewage pipes<br />
in accordance with all technical requirements. Price includes fittings,<br />
clean out , floor drain ,supports, connections and all accessories<br />
required to make the pipes functional.<br />
LS 1.0<br />
LS 1.0<br />
3.8 Supply install and test all exterior pipes, pumps, valves, fittings,<br />
manhole with all accessories required to make the pipes functional.<br />
Supply, install and test appropriately sized potable water pipes (cold<br />
and hot) in accordance with all technical requirements. Price<br />
3.9<br />
includes fittings, supports, connections and all accessories required to<br />
make pipes functional.<br />
LS 1.0<br />
LS 1.0<br />
3.10<br />
Supply and install eastern style commodes (WC) with fixing brackets<br />
and concealed screws with 9 liter cistern in vitreous china or<br />
enameled cast iron complete with connection to sewer pipe, cistern<br />
supports painted. Per technical requirements, connections and all<br />
accessories required to make it functional. The price also includes<br />
supplying and fixing 150mm x 150mm toilet paper roll holder.<br />
No 4.0<br />
2 - 3