Views
4 years ago

Technical Requirements - Southco

Technical Requirements - Southco

Technical Requirements -

CORPORATE OFFICE,SOUTHCO,BERHAMPUR TECHNICAL SPECIFICATION FOR 33KV OUTDOOR VACUUM CIRCUIT BREAKERS 1. 1.1 SCOPE This specification covers design, engineering, manufacture, testing, inspection before dispatch packing, forwarding, transportation, insurance during transit, delivery to site/ stores of 33KV Outdoor Vacuum Circuit Breakers for use the 33/11KV primary substations under the distribution networks of NESCO/WECO/SOUTHCO. 1.2 Al vacuum circuit breakers must be manufactured by ISO 9000 certified Organization and shal have been type tested at CPRI or any Govt. approval laboratory within five years as on the date of bid opening and in satisfactory operation for a period not less than three years. The Bidder shal demonstrate compliance with this requirement by supplying with the bid, copies of the type test certificates together with performance certificates from purchasers/ users. 1.3 1.4 1.5 2. The scope of supply includes the provision of type tests wherever required. Rates for type tests shal be given in the appropriate price schedule of the bid document and will be considered for evaluation. The purchaser reserves the right to waive type tests. The scope also includes the circuit breaker and current and potential transformers, supporting structures, operating mechanism, local/ remote control cabinet, relay control panel, foundation bolts, all the accessories and auxiliary equipment mandatory spares and special tools for satisfactory installation and operation. The circuit breakers shal conform in all respects to the highest standards of engineering, design, workmanship, this specification and the latest revisions of relevant standards at the time of offer and the purchaser shal have the power to reject any work or materials, which, in his judgement, is not in full accordance therewith. STANDARDS Expect where modified by this specification, the circuit breakers and the accessories shal be designed, manufactured and tested in accordance with latest editions of the following standards. Southco Tender Notice No :------ / 2012-13

Technical requirements for connections to Orion's electricity ...
Process and Technical Requirements for Connecting ... - Veridian
EMERGING TECHNICAL REQUIREMENTS FOR A UK SPACEPORT
DOSM User & Technical Requirement - Kementerian Sumber Manusia
Medium Voltage technical guide - Schneider Electric
F4E CODAC I&C Integrator Summary on Technical requirements ...
1336 Technical Reference - Cincinnati State
4 Series Power Range Technical Data, 892-718
RFT - Part A - Statement of Requirement - Australian Transport ...
4 Series Circuit Protection Technical Specifications ... - Clipsal
Technical Requirements Summary
Security Requirements Engineering for Socio-Technical ... - STS-Tool
Advertising Technical/Mechanical Requirements - Structure Magazine
Untitled - Lively Technical Center
Weathershield Technical Data - 11182 - Clipsal
NGMN Radio Access Terminal Requirements
LOC Requirements 2013 - ITU WTS Grand Final - International ...
Technical Competencies Required by Position (PDF, 1 MB)
Download Technical Specification - MDL Technologies Ltd
Kent Design - Technical Appendix - Kent County Council
Technical Manual - Tunstall GmbH
Glossary of technical terms - ABB
Xtreme Range Water and Dust Protected Technical Data ... - Clipsal
Technical Data Sheet - Octopart
Electric bolts Technical information - Assa Abloy
Semiconductor Characterization System Technical Data - Helmar
Technical Safety Engineering - Mustang Engineering Inc.
Technical Data and Dimensions
Technical specifications TOE 7621 - EMPOS