07.11.2014 Views

The NHS in Wales - Constructing Excellence

The NHS in Wales - Constructing Excellence

The NHS in Wales - Constructing Excellence

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong><br />

CYNLLUN Oes: ADEILADU AR GYFER Cymru<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Designed for Life: Build<strong>in</strong>g for<br />

<strong>Wales</strong><br />

Patrick Riordan, Deputy Director<br />

Welsh Health Estates<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


What is the <strong>NHS</strong> <strong>in</strong> <strong>Wales</strong> do<strong>in</strong>g?<br />

• Integrated supply cha<strong>in</strong>s<br />

• Collaborative work<strong>in</strong>g<br />

• With<strong>in</strong> a Framework environment<br />

• Partners selected on capability (and cost<br />

competitiveness)<br />

• Long-term relationships (to support cont<strong>in</strong>uous<br />

improvement)<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Designed for Life :<br />

Build<strong>in</strong>g for <strong>Wales</strong><br />

Collaborative work<strong>in</strong>g environment<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Designed for Life :<br />

Build<strong>in</strong>g for <strong>Wales</strong><br />

Framework Manager<br />

Collaborative work<strong>in</strong>g environment<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Designed for Life :<br />

Build<strong>in</strong>g for <strong>Wales</strong><br />

Framework Manager<br />

<strong>NHS</strong> Trusts<br />

(15 No.)<br />

Collaborative work<strong>in</strong>g environment<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Designed for Life :<br />

Build<strong>in</strong>g for <strong>Wales</strong><br />

Framework Manager<br />

Project manager<br />

framework<br />

(3 No.)<br />

Supervisor<br />

framework<br />

(3 No.)<br />

<strong>NHS</strong> Trusts<br />

(15 No.)<br />

Cost advisor<br />

framework<br />

(3 No.)<br />

Collaborative work<strong>in</strong>g environment<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Designed for Life :<br />

Build<strong>in</strong>g for <strong>Wales</strong><br />

Framework Manager<br />

Project manager<br />

framework<br />

(3 No.)<br />

Supervisor<br />

framework<br />

(3 No.)<br />

<strong>NHS</strong> Trusts<br />

15 No.<br />

Cost advisor<br />

framework<br />

(3 No.)<br />

National Cost Advisor<br />

(1 No.)<br />

Collaborative work<strong>in</strong>g environment<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Designed for Life :<br />

Build<strong>in</strong>g for <strong>Wales</strong><br />

Framework Manager<br />

Project manager<br />

framework<br />

(3 No.)<br />

Supervisor<br />

framework<br />

(3 No.)<br />

<strong>NHS</strong> Trusts<br />

(15 No.)<br />

Supply Cha<strong>in</strong> Partners<br />

(3 No.)<br />

Cost advisor<br />

framework<br />

(3 No.)<br />

National Cost Advisor<br />

(1 No.)<br />

Collaborative work<strong>in</strong>g environment<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Designed for Life :<br />

Build<strong>in</strong>g for <strong>Wales</strong><br />

A typical<br />

Supply Cha<strong>in</strong><br />

Partnership<br />

Constructor (1No)<br />

Health Planners (3 No.)<br />

Architects (3 No.)<br />

Civil and Structural Eng<strong>in</strong>eers (3 No.)<br />

Build<strong>in</strong>g Services Eng<strong>in</strong>eers (3 No.)<br />

Plann<strong>in</strong>g Supervisors (3 No.)<br />

Cost Managers (3 No.)<br />

Build<strong>in</strong>g Services Subcontractors (3 No.)<br />

FM advisors (3 No.)


Designed for Life : Build<strong>in</strong>g for <strong>Wales</strong><br />

• Mandatory<br />

• Threshold level over £5m<br />

Framework Ground Rules<br />

• Initial Framework 4 years with option to extend by 2<br />

years<br />

• Regional frameworks to cover projects below threshold<br />

to be set up after 2 – 3 years<br />

• Implement ma<strong>in</strong> framework by June 2006<br />

• Welsh Health Estates to manage Framework<br />

Agreement<br />

• Trusts to enter <strong>in</strong>to contract with their selected partner<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Supply Cha<strong>in</strong> Partner<br />

SCP<br />

SCM<br />

Collateral Warranties<br />

Framework Agreements<br />

PM<br />

NEC3: Option C<br />

Target Contract<br />

National<br />

Assembly for<br />

<strong>Wales</strong><br />

S<br />

<strong>NHS</strong> Trusts<br />

Term Contract<br />

TCA<br />

Professional Services Contract<br />

National Cost Advisor<br />

Support Frameworks<br />

Designed for Life: Build<strong>in</strong>g for <strong>Wales</strong><br />

Contractual Arrangements<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


How we are organis<strong>in</strong>g ourselves<br />

Strategic Framework Board<br />

Framework Directors Group<br />

Key Account Managers Group<br />

Design & Construction Group Commercial Group Process & Procedures Group<br />

Work<strong>in</strong>g Group(s) Work<strong>in</strong>g Group(s) Work<strong>in</strong>g Group(s)<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Purpose of mak<strong>in</strong>g the change<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Designed for Life<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Designed for Life :<br />

Build<strong>in</strong>g for <strong>Wales</strong><br />

Capital Expenditure Budget for <strong>Wales</strong><br />

2004/05 £107 million<br />

2005/06 £146 million<br />

2006/07 £220 million<br />

2007/08 £309 million<br />

2008/09 £309 million<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Look<strong>in</strong>g back why was it necessary<br />

to make these changes?<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


<strong>NHS</strong> experience of the construction<br />

<strong>in</strong>dustry<br />

• Limited collaboration across the supply cha<strong>in</strong><br />

• Contractors and suppliers make no, or very little,<br />

<strong>in</strong>put <strong>in</strong>to design<br />

• Selection on the basis of lowest capital cost<br />

(usually on an <strong>in</strong>complete design)<br />

• Short term relationships<br />

• Adversarial contract<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Result<strong>in</strong>g <strong>in</strong> hospital projects that…<br />

• Cost more than budgeted<br />

• Are usually delivered late<br />

• Have poor functionality<br />

• Have no time or cost certa<strong>in</strong>ty<br />

• Are of variable quality<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


And result <strong>in</strong><br />

• Low profits<br />

• An <strong>in</strong>dustry vilified by clients and unable to<br />

attract enough good people<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


Our aims<br />

• Value for money<br />

• Certa<strong>in</strong>ty of delivery <strong>in</strong> terms of time and<br />

cost<br />

• Consistent delivery of quality <strong>in</strong> both<br />

design and construction<br />

• Cont<strong>in</strong>uous improvement<br />

• Better management of risk<br />

• Optimis<strong>in</strong>g the delivery of susta<strong>in</strong>able<br />

development<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>


<strong>The</strong> proof of the pudd<strong>in</strong>g ……<br />

• Got off to a good start<br />

• First review <strong>in</strong> January<br />

• Key is to change culture<br />

DESIGNED FOR Life : BUILDING FOR <strong>Wales</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!