09.11.2014 Views

Double Stacked Drums on Pallets with Ty-Gard

Double Stacked Drums on Pallets with Ty-Gard

Double Stacked Drums on Pallets with Ty-Gard

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This load plan is intended for general informati<strong>on</strong> purposes <strong>on</strong>ly and is not recommended for any specific cargo. Other Carriers are not required to accept this load plan or any plan suggested by Uni<strong>on</strong> Pacific Railroad.<br />

This informati<strong>on</strong> is offered to shippers to assist in understanding the rail envir<strong>on</strong>ment, the shipper is ultimately resp<strong>on</strong>sible for choosing how best to package, block and brace its cargo to avoid damage to the cargo and<br />

rail equipment.<br />

<str<strong>on</strong>g>Double</str<strong>on</strong>g> <str<strong>on</strong>g>Stacked</str<strong>on</strong>g> <str<strong>on</strong>g>Drums</str<strong>on</strong>g> <strong>on</strong> <strong>Pallets</strong> <strong>with</strong> <strong>Ty</strong>-<strong>Gard</strong><br />

20ft C<strong>on</strong>tainers Page<br />

Nose<br />

Side Wall Cutaway View<br />

Rear<br />

Nose<br />

<strong>Ty</strong>-gard used a l<strong>on</strong>gitudinal<br />

restraint. Each strip of <strong>Ty</strong>-gard<br />

will restrain approx. 8,800lbs<br />

232” (interior length)<br />

Overhead View<br />

<strong>Ty</strong>-<strong>Gard</strong><br />

<strong>Ty</strong>-<strong>Gard</strong><br />

<strong>Ty</strong>-<strong>Gard</strong><br />

<strong>Ty</strong>-<strong>Gard</strong><br />

1/2” plywood vertical<br />

sheet between drums and <strong>Ty</strong>-<br />

<strong>Gard</strong> strips – tape barrier to<br />

plywood to prevent dropping<br />

Rear<br />

92 in.<br />

<str<strong>on</strong>g>Drums</str<strong>on</strong>g> must be unitized to the pallet<br />

(See diagram below)<br />

Uni<strong>on</strong> Pacific Damage Preventi<strong>on</strong><br />

File: <str<strong>on</strong>g>Drums</str<strong>on</strong>g>20 Pallet TYGARD<br />

Date: 11/04/2003 By: PJS


This load plan is intended for general informati<strong>on</strong> purposes <strong>on</strong>ly and is not recommended for any specific cargo. Other Carriers are not required to accept this load plan or any plan suggested by Uni<strong>on</strong> Pacific Railroad.<br />

This informati<strong>on</strong> is offered to shippers to assist in understanding the rail envir<strong>on</strong>ment, the shipper is ultimately resp<strong>on</strong>sible for choosing how best to package, block and brace its cargo to avoid damage to the cargo and<br />

rail equipment.<br />

<str<strong>on</strong>g>Double</str<strong>on</strong>g> <str<strong>on</strong>g>Stacked</str<strong>on</strong>g> <str<strong>on</strong>g>Drums</str<strong>on</strong>g> Floor Loaded <strong>with</strong> <strong>Ty</strong>-gard<br />

20ft C<strong>on</strong>tainers Page<br />

Nose<br />

Side Wall Cutaway View<br />

Rear<br />

AAR approved separator<br />

sheet or ½ inch plywood<br />

Nose<br />

<strong>Ty</strong>-gard used a l<strong>on</strong>gitudinal<br />

restraint. Each strip of <strong>Ty</strong>-gard<br />

will restrain approx. 8,800lbs<br />

232” (interior length)<br />

Overhead View<br />

<strong>Ty</strong>-<strong>Gard</strong><br />

<strong>Ty</strong>-<strong>Gard</strong><br />

<strong>Ty</strong>-<strong>Gard</strong><br />

<strong>Ty</strong>-<strong>Gard</strong><br />

1/2” plywood vertical<br />

sheet between drums and <strong>Ty</strong>-<br />

<strong>Gard</strong> strips – tape barrier to<br />

plywood to prevent dropping<br />

Rear<br />

92 in.<br />

A plywood barrier must be inserted between the drums<br />

and <strong>Ty</strong>-<strong>Gard</strong> when the last row ends <strong>with</strong> four drums.<br />

This is d<strong>on</strong>e to prevent any bulging of the last row<br />

Uni<strong>on</strong> Pacific Damage Preventi<strong>on</strong><br />

File: <str<strong>on</strong>g>Drums</str<strong>on</strong>g>20 Pallet TYGARD<br />

Date: 11/04/2003 By: PJS


<str<strong>on</strong>g>Double</str<strong>on</strong>g> <str<strong>on</strong>g>Stacked</str<strong>on</strong>g> <str<strong>on</strong>g>Drums</str<strong>on</strong>g> Floor Loaded <strong>with</strong> <strong>Ty</strong>-gard<br />

20ft C<strong>on</strong>tainers Page<br />

Nose<br />

Side Wall Cutaway View<br />

Rear<br />

AAR approved separator<br />

sheet or ½ inch plywood<br />

<strong>Ty</strong>-<strong>Gard</strong><br />

<strong>Ty</strong>-<strong>Gard</strong><br />

<strong>Ty</strong>-<strong>Gard</strong><br />

<strong>Ty</strong>-<strong>Gard</strong><br />

<strong>Ty</strong>-gard used a l<strong>on</strong>gitudinal<br />

restraint. Each strip of <strong>Ty</strong>-gard<br />

will restrain approx. 8,800lbs<br />

Nose<br />

232” (interior length)<br />

Overhead View<br />

Rear<br />

92 in.<br />

This load plan is intended for general informati<strong>on</strong> purposes <strong>on</strong>ly and is not recommended for any specific cargo. Other Carriers are not required to<br />

accept this load plan or any plan suggested by Uni<strong>on</strong> Pacific Railroad. This informati<strong>on</strong> is offered to shippers to assist in understanding the rail<br />

envir<strong>on</strong>ment, the shipper is ultimately resp<strong>on</strong>sible for choosing how best to package, block and brace its cargo to avoid damage to the cargo and<br />

rail equipment.<br />

Uni<strong>on</strong> Pacific Damage Preventi<strong>on</strong><br />

File: <str<strong>on</strong>g>Drums</str<strong>on</strong>g>20 Pallet TYGARD<br />

Date: 11/04/2003 By: PJS


Unitized <str<strong>on</strong>g>Drums</str<strong>on</strong>g> <strong>on</strong> <strong>Pallets</strong><br />

Unitized <str<strong>on</strong>g>Drums</str<strong>on</strong>g><br />

Page<br />

DRUMS ON PALLETS<br />

DRUMS MUST BE UNITIZED TOGETHER.<br />

EACH ROW MUST BE BANDED TO THE<br />

PALLET LONGITUDINALLY AND<br />

LATERALLY WITH MINIMUM 1.25” STEEL<br />

BANDING<br />

This load plan is intended for general informati<strong>on</strong> purposes <strong>on</strong>ly and is not recommended for any specific cargo. Other Carriers are not required to<br />

accept this load plan or any plan suggested by Uni<strong>on</strong> Pacific Railroad. This informati<strong>on</strong> is offered to shippers to assist in understanding the rail<br />

envir<strong>on</strong>ment, the shipper is ultimately resp<strong>on</strong>sible for choosing how best to package, block and brace its cargo to avoid damage to the cargo and<br />

rail equipment.<br />

Uni<strong>on</strong> Pacific Damage Preventi<strong>on</strong><br />

File: Unitized <str<strong>on</strong>g>Drums</str<strong>on</strong>g> <strong>on</strong> <strong>Pallets</strong><br />

Date:06/20/06 By:EOW


TY- <strong>Gard</strong> Installati<strong>on</strong><br />

<strong>Ty</strong>-<strong>Gard</strong><br />

Page<br />

INSPECTOR VIEW<br />

SLOTS (Center or side)<br />

TY-<strong>Gard</strong><br />

TY-<strong>Gard</strong><br />

A123564<br />

Note: VIEW SLOTS<br />

SHOULD BE LARGE<br />

ENOUGH TO VIEW,<br />

PACKAGING, METHOD OF<br />

LOADING,. BUT NOT<br />

LARGE ENOUGH TO<br />

ALLOW PACKAGE TO<br />

FALL THROUGH VIEWING<br />

VOID.<br />

TY-<strong>Gard</strong><br />

TY-<strong>Gard</strong><br />

A123564<br />

Inspector view slot<br />

1/2” plywood sheet<br />

TY-<strong>Gard</strong><br />

TY-<strong>Gard</strong><br />

<strong>Ty</strong>-<strong>Gard</strong> can be used as a l<strong>on</strong>gitudinal restraint.<br />

Rule of Thumb: 1 strip for every 8,800 lb of cargo.<br />

Must glue to side wall , minimum of 5 ft<br />

This load plan is intended for general informati<strong>on</strong> purposes <strong>on</strong>ly and is not<br />

recommended for any specific cargo. Other Carriers are not required to accept this<br />

load plan or any plan suggested by Uni<strong>on</strong> Pacific Railroad. This informati<strong>on</strong> is offered<br />

to shippers to assist in understanding the rail envir<strong>on</strong>ment, the shipper is ultimately<br />

resp<strong>on</strong>sible for choosing how best to package, block and brace its cargo to avoid<br />

damage to the cargo and rail equipment.<br />

Uni<strong>on</strong> Pacific Damage Preventi<strong>on</strong><br />

File: <strong>Ty</strong>-gard Installati<strong>on</strong><br />

Date: 8/6/03 By:WLR

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!