BANGLADESH POWER DEVELOPMENT BOARD<br />

REQUEST FOR PROPOSALS<br />

FOR<br />

THE SELECTION OF PROJECT SPONSOR<br />

TO DEVELOP A 50±10% MW HFO-FIRED POWER PROJECT<br />

AT CHITTAGONG, BANGLADESH<br />

ON<br />

A BUILD, OWN AND OPERATE BASIS<br />

Part-2: Request for Proposal<br />

1. The successful Bidder (the Project Sponsor) will be issued a Letter of Intent by <strong>BPDB</strong> (the Letter<br />

of Intent) and will be required to (a) form a project company (the Company) to implement the<br />

Project; (b) arrange the necessary financing for the Project and to execute the Implementation<br />

Agreement (IA) and the Power Purchase Agreement (PPA) (together, the Project Agreements)<br />

and other contracts required for the construction, operation and maintenance of the Facility; (c)<br />

implement the Project, and (d) upon commissioning, operate the Facility for an initial period of<br />

15 years so as to provide the electricity to Bangladesh Power Development Board (<strong>BPDB</strong>) at<br />

specified tariffs (the Tariff Charges).<br />

2. The Company shall be a company incorporated under the laws of the Peoples Republic of<br />

Bangladesh and shall be required, among other things, to undertake the following:<br />

a. execute the Project Agreements with the respective agencies of the GOB including<br />

MPEMR, <strong>BPDB</strong> within thirty (30) Days of the issue of the Letter of Intent;<br />

b. finalize the Engineering, Procurement and Construction (EPC) Contract, Operations and<br />

Maintenance (O&M) Contract (if necessary), and all other agreements including the loan<br />

agreements (together the Third Party Agreements), required to construct, finance,<br />

operate, and maintain the Project on or before the Financial Closing;<br />

c. on or before the Required Financial Closing Date, provide the necessary equity and<br />

arrange the necessary debt financing for the complete execution of the Project;<br />

d. ensure that the Project Sponsor (or the Lead Member and the Operating Member, as<br />

designated by the Project Sponsor in its Proposal) shall hold certain minimum equity stake<br />

in the Company during the lock-in periods set forth in the draft IA and in this RFP;<br />

e. engineer, design, procure, construct, install, test, start-up, and Commission the Project<br />

and undertake other activities to achieve the Commercial Operation Date (COD) no later<br />

than the Required Commercial Operations Date (RCOD);<br />

f. obtain and maintain all permits and licenses necessary to construct and operate the<br />

Project, including but not limited to environmental permits, permits for importation of<br />

materials and equipment for the Facility, permits for construction of the Facility, and any<br />

permits or licenses required for operations of the Company according to applicable laws;<br />

and<br />

g. operate and maintain the Project for fifteen (15) years from the COD (the Term), in<br />

accordance with the terms of the Project Agreements, where such Term can be extended<br />

or earlier terminated in accordance with the Project Agreements.<br />