KRECOMMENDATIONS<br />

<strong>SUNY</strong> <strong>Cobleskill</strong> Facilities Master Plan – Phase 5 Report<br />

November 2011<br />

2B PROVIDE NEW STUDENT & COMMUNITY CENTER<br />

Providing a new student activities building is the highest priority of the final<br />

FMP. The College currently lacks a student center of any kind and is in<br />

need of a space for students and faculty to congregate. The new Student<br />

& Community Center proposed by the FMP creates a natural center for the<br />

campus at the previous location of Beard Wellness Center and Brickyard<br />

Point, replacing the program of both demolished buildings and providing<br />

new space for other functions. While the Student & Community Center<br />

is proposed to be located on the east side of Route 7, it is positioned so<br />

as to be highly visible from both sides of the highway. A new pedestrian<br />

crossing at Route 7 is provided directly in line with the building, helping<br />

to unify the east and west sides of the campus.<br />

The Student & Community Center will require coordination with the<br />

College Crossing at Route 7 (4Ia and 4Ib), the reconfiguration of Albany<br />

Avenue (4X), as well as the Beard Wellness demolition. In particular<br />

the Beard Wellness Center cannot be vacated and demolished until the<br />

Wellness Center is relocated into its new home in the Student & Community<br />

Center.<br />

Rendering of<br />

College Crossing of Route 7 and<br />

Student & Community Center<br />