KRECOMMENDATIONS<br />

<strong>SUNY</strong> <strong>Cobleskill</strong> Facilities Master Plan – Phase 5 Report<br />

November 2011<br />

GROUP 3 – SUPPORT INITIATIVES<br />

GROUP 4 – OPEN SPACE INITIATIVES<br />

3A REORIENT STUDENT SERVICES TO INCREASE VISIBILITY OF AND<br />

ACCESSIBILITY TO KNAPP HALL<br />

Knapp Hall contains the bulk of administration functions at <strong>SUNY</strong><br />

<strong>Cobleskill</strong>. Like many of the buildings on campus, Knapp was constructed<br />

in the late 1960s. However, unlike many of the other buildings on campus,<br />

Knapp recently received a major renovation and is in excellent condition<br />

(aside from the roof, which is replaced as part of this initiative).<br />

While the building is suitable for its function as an administration building, it<br />

has a distinct internal focus with no visual connection to campus circulation<br />

routes or its surrounding context. The final FMP proposes a medium-level<br />

renovation of the northwest wing of the building, replacing the existing<br />

enclosure with a new glazing system. This increased transparency will<br />

help to integrate Knapp Hall with adjacent open spaces and buildings<br />

and create a more welcoming appearance.<br />

3B UPGRADE SYSTEMS IN MACKEY SERVICE BUILDING<br />

Mackey Service Building contains a combination of facilities offices and<br />

various service workshops such as carpentry, painting, and plumbing.<br />

As mentioned in Section B of the Phase 3 report, the office portion of<br />

the building is poorly organized and is not suitable for its function. The<br />

workshops and garage also need to be upgraded and realigned with<br />

separate but adjoining spaces for each trade. The final FMP calls for a<br />

50% interior demolition of Mackey Service Building and an upgrade of<br />

existing mechanical systems.<br />

In summary:<br />

•<br />

•<br />

•<br />

The Mackey Service Building Complex provides service functions<br />

for the entire campus including shops, grounds maintenance<br />

and shipping and receiving.<br />

It is necessary to have adequate storage to service and protect<br />

campus maintenance and service equipment.<br />

It is necessary to provide adequate facilities for trades groups<br />

including grounds and shops, electrical, plumbing, HVAC,<br />

carpentry, and locksmith.<br />

3C PROVIDE BASIC UPGRADE OF WAREHOUSE<br />

This building is a component of what is known as the Mackey Service<br />

Complex. The final FMP proposes a medium-level renovation of the<br />

building systems to better support the campus’s storage and Facilities’<br />

needs.<br />

3D RENOVATE PHYSICAL MAINTENANCE (PM) SHOP<br />

This building is part of the Mackey Service Complex. The final FMP<br />

proposes a medium-level renovation of the building and a replacement<br />

of the roof.<br />

3E PROVIDE NEW BUILDING TO SUPPORT UNIVERSITY POLICE<br />

DEPARTMENT AND WELCOME CENTER<br />

This initiative provides a new building dedicated to the University Police<br />

Department (UPD) and Welcome Center southeast of the Child Care<br />

Complex, adjacent to the W-Lot. This is an ideal location for the UPD<br />

as it is in close proximity to the main campus but removed from the<br />

center of activity. The Welcome Center is an important component of this<br />

initiative, providing a “front door” to the campus and greeting visitors<br />

with a positive first impression.<br />

Table K12<br />

UPD/Welcome Center 2009 Per FMP<br />

30,722 nasf 32,720 nasf<br />

University Police Department n/a 3,200 nasf<br />

Welcome Center n/a 800 nasf<br />

Note: Refer to Section L - Demolition for additional information.<br />

4A DEMOLISH EXISTING RYDER HALL<br />

Ryder Hall contains offices for Liberal Arts & Sciences. The building is in<br />

poor condition and will be demolished after being used as surge space.<br />

4B DEMOLISH EXISTING BRICKYARD POINT<br />

As part of the final FMP, Brickyard Point, the Student Activities building,<br />

is demolished. Student Activities from Brickyard Point are expanded and<br />

relocated to the Student & Community Center (2C).<br />

4C DEMOLISH EXISTING BEARD WELLNESS CENTER<br />

As part of the final FMP, Beard Wellness Center is demolished and Wellness<br />

is relocated to the Student & Community Center (2C). In particular The<br />

Beard Wellness Center cannot be vacated and demolished until the<br />

Wellness Center can be relocated into its new home in the Student &<br />

Community Center.<br />

4D DEMOLISH EXISTING PORTER HALL<br />

Porter Hall is a student dormitory that was constructed in the early 1970s.<br />

The final FMP proposes to demolish this building.<br />

4E DEMOLISH EXISTING CHAMPLIN HALL<br />

Champlin Hall contains campus dining and a portion of Culinary Arts.<br />

The final FMP proposes to demolish Champlin Hall, consolidating dining<br />

and Culinary Arts in Prentice Hall and the new addition to Prentice (2E).<br />

4F DEMOLISH EXISTING KNISKERN HOUSE<br />

An addition and renovation of Kniskern House is currently planned to<br />

accommodate the University Police (relocated from Johnson Hall). This is<br />

intended to be a temporary solution; the final FMP relocates the University<br />

Police Department (with a Visitor Center) to a new building after 2018, at<br />

which time Kniskern House is proposed to be demolished.<br />

62