20.11.2014 Views

Building automation – impact on energy efficiency - Siemens ...

Building automation – impact on energy efficiency - Siemens ...

Building automation – impact on energy efficiency - Siemens ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

What is Performance<br />

C<strong>on</strong>tracting ?<br />

6.3.3 Performance C<strong>on</strong>tracting<br />

C<strong>on</strong>centrati<strong>on</strong> <strong>on</strong> what’s important<br />

Tap existing <strong>energy</strong> saving potential in your customer’s building technology with<br />

targeted renovati<strong>on</strong>s and optimizati<strong>on</strong>, resulting in lower operating costs and increased<br />

values. The required investments pay for themselves from savings in<br />

<strong>energy</strong> and operating costs throughout the c<strong>on</strong>tract period. A savings guarantee<br />

ensures your customer’s business success. Updating technical plants and<br />

guaranteeing functi<strong>on</strong>s during the term of the c<strong>on</strong>tract also increases operati<strong>on</strong>al<br />

security. And we make a valuable c<strong>on</strong>tributi<strong>on</strong> to the envir<strong>on</strong>ment together<br />

with our customers by saving <strong>energy</strong>.<br />

Measures<br />

Modernizati<strong>on</strong><br />

Optimizati<strong>on</strong><br />

Energy management<br />

Success<br />

guarantee<br />

affect<br />

Savings<br />

Energy<br />

Operati<strong>on</strong><br />

Media<br />

finance<br />

A win-win situati<strong>on</strong> for the building operator with performance c<strong>on</strong>tracting<br />

• Added value through modernizati<strong>on</strong><br />

• Savings pay for investments<br />

• Risk-free thanks to success guarantee<br />

• Functi<strong>on</strong> guarantee during the c<strong>on</strong>tract period<br />

• Sustainable quality assurance by <strong>energy</strong> management<br />

• Secured financing<br />

Financing model<br />

Energy,<br />

Operating costs<br />

Additi<strong>on</strong>al savings from <strong>energy</strong><br />

price increases<br />

Savings<br />

guarantee<br />

<strong>Siemens</strong> share<br />

(C<strong>on</strong>tracting rate)<br />

Win for the<br />

customer<br />

Current<br />

costs<br />

Reduced costs with performance<br />

c<strong>on</strong>tracting<br />

Time of easing <str<strong>on</strong>g>impact</str<strong>on</strong>g><br />

<strong>on</strong> env.<br />

Guarantee period<br />

Time for cost savings<br />

Time [years]<br />

From guarantee start to the end of the c<strong>on</strong>tract, guaranteed savings<br />

• Finance all necessary savings measures<br />

• Additi<strong>on</strong>al savings split am<strong>on</strong>g the parties<br />

• Ensure that we take the risk of not achieving savings<br />

• When the c<strong>on</strong>tract ends, you benefit 100% from the savings<br />

122

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!