Building automation â impact on energy efficiency - Siemens ...
Building automation â impact on energy efficiency - Siemens ...
Building automation â impact on energy efficiency - Siemens ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
What is Performance<br />
C<strong>on</strong>tracting ?<br />
6.3.3 Performance C<strong>on</strong>tracting<br />
C<strong>on</strong>centrati<strong>on</strong> <strong>on</strong> what’s important<br />
Tap existing <strong>energy</strong> saving potential in your customer’s building technology with<br />
targeted renovati<strong>on</strong>s and optimizati<strong>on</strong>, resulting in lower operating costs and increased<br />
values. The required investments pay for themselves from savings in<br />
<strong>energy</strong> and operating costs throughout the c<strong>on</strong>tract period. A savings guarantee<br />
ensures your customer’s business success. Updating technical plants and<br />
guaranteeing functi<strong>on</strong>s during the term of the c<strong>on</strong>tract also increases operati<strong>on</strong>al<br />
security. And we make a valuable c<strong>on</strong>tributi<strong>on</strong> to the envir<strong>on</strong>ment together<br />
with our customers by saving <strong>energy</strong>.<br />
Measures<br />
Modernizati<strong>on</strong><br />
Optimizati<strong>on</strong><br />
Energy management<br />
Success<br />
guarantee<br />
affect<br />
Savings<br />
Energy<br />
Operati<strong>on</strong><br />
Media<br />
finance<br />
A win-win situati<strong>on</strong> for the building operator with performance c<strong>on</strong>tracting<br />
• Added value through modernizati<strong>on</strong><br />
• Savings pay for investments<br />
• Risk-free thanks to success guarantee<br />
• Functi<strong>on</strong> guarantee during the c<strong>on</strong>tract period<br />
• Sustainable quality assurance by <strong>energy</strong> management<br />
• Secured financing<br />
Financing model<br />
Energy,<br />
Operating costs<br />
Additi<strong>on</strong>al savings from <strong>energy</strong><br />
price increases<br />
Savings<br />
guarantee<br />
<strong>Siemens</strong> share<br />
(C<strong>on</strong>tracting rate)<br />
Win for the<br />
customer<br />
Current<br />
costs<br />
Reduced costs with performance<br />
c<strong>on</strong>tracting<br />
Time of easing <str<strong>on</strong>g>impact</str<strong>on</strong>g><br />
<strong>on</strong> env.<br />
Guarantee period<br />
Time for cost savings<br />
Time [years]<br />
From guarantee start to the end of the c<strong>on</strong>tract, guaranteed savings<br />
• Finance all necessary savings measures<br />
• Additi<strong>on</strong>al savings split am<strong>on</strong>g the parties<br />
• Ensure that we take the risk of not achieving savings<br />
• When the c<strong>on</strong>tract ends, you benefit 100% from the savings<br />
122