<strong>Nottingham</strong> Express Transit Phase Two<br />

Six-Weekly Works Schedule<br />

Week commencing 25/03/13 (information correct as at 22/03/13)<br />

Please find below information about works which are needed to extend <strong>Nottingham</strong>’s tram system to Clifton and Chilwell. These are works which are currently<br />

underway or are planned to start in <strong>the</strong> next six weeks, and indicate <strong>the</strong> likely timescales involved.<br />

Please be aware that as with any major construction scheme of this scale and nature, <strong>the</strong> dates may be subject to change.<br />

Items shown in Red Bold indicate new or updated works.<br />

Items shown in Black Bold indicate works which are due to start within two weeks of <strong>the</strong> production of this document.<br />

Works which have a line struck through <strong>the</strong>m have ei<strong>the</strong>r been recently completed or need to be rescheduled to start at a later date.<br />

If you view this document in an electronic format, you can click on <strong>the</strong> text in <strong>the</strong> site/location section and go through to a Google Street View image which<br />

shows <strong>the</strong> location of <strong>the</strong> works. You can also download a copy of any leaflets which have been produced for each set of works, by clicking on <strong>the</strong> links.<br />

If you need any fur<strong>the</strong>r information about any of <strong>the</strong> works detailed below please call <strong>the</strong> NET Phase Two hotline on: (0115) 924 24 54 or email:<br />

tram@nottinghamcity.gov.uk<br />

Site/<br />

Location<br />

Planned<br />

work<br />

dates/times<br />

Date-linked activity<br />

breakdown<br />

Traffic Management<br />

arrangements


Site/<br />

Location<br />

Planned<br />

work<br />

dates/times<br />

Date-linked activity<br />

breakdown<br />

Beeston<br />

Traffic Management<br />

arrangements<br />

Queens Road<br />

East Island,<br />

between Lower<br />

Road and<br />

Queens Road<br />

East<br />

Exact dates<br />

TBC<br />

subject to<br />

survey works<br />

Lower Road 12/11/2012-<br />

On going<br />

Electricity diversion<br />

works (Phase One)<br />

Communication and<br />

Electricity diversion<br />

works (Phase Two)<br />

West pavement around island<br />

closed. Temporary walkway<br />

to be provided around <strong>the</strong><br />

works<br />

Temporary walkway around<br />

<strong>the</strong> works (east side). Parking<br />

restricted (east side only)<br />

around <strong>the</strong> works area<br />

For more information click<br />

here.<br />

Lower Road<br />

<strong>from</strong> <strong>the</strong><br />

junction of<br />

Albert Road to<br />

Queens Road<br />

island<br />

Neville Sadler<br />

Court<br />

25/03/2013-<br />

30/08/2013<br />

12/11/2012-<br />

12/11/2013<br />

04/03/2013-<br />

15/03/2013<br />

Piling works within<br />

<strong>the</strong> road<br />

From <strong>the</strong> 15 th April<br />

Fletcher Road will be<br />

made one way,<br />

direction of travel is<br />

<strong>from</strong> Humber Road<br />

towards Neville<br />

Sadler Court. Trial<br />

route through Neville<br />

Sadler Court, Lower<br />

Road and Albert Road<br />

Compound installation<br />

Partial disconnection of<br />

services to Neville<br />

Sadler Court, followed<br />

by demolition.<br />

Ball and chain<br />

Road closure of Lower<br />

Road to <strong>the</strong> junction of<br />

Albert Road. Parking<br />

restrictions within <strong>the</strong> road<br />

closure<br />

For more information click<br />

here.<br />

Signing only within Lower<br />

Road and Fletcher Road and<br />

if needed pedestrian<br />

management<br />

For more information click<br />

here.


Site/<br />

Location<br />

Planned<br />

work<br />

dates/times<br />

Fletcher Road 21/01/2013-<br />

On going<br />

Middle Street,<br />

between junction<br />

of Humber Road<br />

and Regent<br />

Street<br />

28/05/2012 –<br />

Suspended<br />

<strong>from</strong><br />

21/12/12<br />

Restart<br />

02/01/13 -<br />

Date-linked activity<br />

breakdown<br />

Gas diversion works<br />

And water diversion<br />

works<br />

Gas and electricity<br />

Sewer and<br />

communications<br />

diversion works<br />

(Phase One)<br />

Traffic Management<br />

arrangements<br />

Traffic controlled by a give<br />

and take system. Some<br />

pedestrian management may<br />

be required.<br />

For more information click<br />

here.<br />

One lane closed westbound<br />

along Middle Street to The<br />

City and pedestrian<br />

management through <strong>the</strong><br />

work area.<br />

For more information click<br />

here.<br />

Bus stop NTSAWJDP<br />

suspended but passengers<br />

can use bus stop NTSAWJAT<br />

instead.


Site/<br />

Location<br />

Middle Street,<br />

between<br />

Station Road<br />

with <strong>the</strong><br />

junction of<br />

Humber Road<br />

leading to<br />

Regent Street<br />

Planned<br />

work<br />

dates/times<br />

25/03/2013-<br />

14/03/2014<br />

Date-linked activity<br />

breakdown<br />

All service diversion<br />

works and permanent<br />

works<br />

Traffic Management<br />

arrangements<br />

Middle Street, between<br />

Station Road and Regent<br />

Street, will become one-way<br />

for traffic heading<br />

eastbound away <strong>from</strong><br />

Beeston towards<br />

<strong>Nottingham</strong>.<br />

For more information click<br />

here.<br />

Middle Street<br />

with <strong>the</strong><br />

junction<br />

Station Road<br />

and junction to<br />

Regent Street<br />

25/03/2013-<br />

14/03/2014<br />

All service diversion<br />

works and permanent<br />

works<br />

Middle Street, between<br />

Station Road and Dovecote<br />

Lane, will become one-way<br />

for traffic heading<br />

westbound away <strong>from</strong><br />

Beeston to Chilwell<br />

For more information click<br />

here.<br />

Middle Street<br />

with <strong>the</strong><br />

junction of<br />

Station Road to<br />

Dovecote Lane<br />

Middle Street<br />

with <strong>the</strong> junction<br />

to The City<br />

25/03/2013<br />

14/03/2014<br />

21/01/2013-<br />

15/02/2013<br />

All service diversion<br />

works and permanent<br />

works<br />

Sewer and Electricity<br />

Diversion works<br />

(Phase Two)<br />

Dovecote Lane, between<br />

Middle Street and Leslie<br />

Avenue, will become oneway<br />

for traffic heading<br />

southbound <strong>from</strong> Beeston<br />

Town Centre<br />

For more information click<br />

here.<br />

Temporary two-way traffic<br />

lights westbound along<br />

Middle Street to The City,<br />

which will be closed<br />

For more information click<br />

here.


Site/<br />

Location<br />

Middle Street<br />

with <strong>the</strong> junction<br />

of City Road<br />

Middle Street<br />

Between City<br />

Road and<br />

Willoughby<br />

Street<br />

Planned<br />

work<br />

dates/times<br />

On-going<br />

Road works<br />

On-going<br />

To follow ID<br />

213<br />

10/01/2013 –<br />

28/01/2013<br />

Date-linked activity<br />

breakdown<br />

Sewer and Electricity<br />

Diversion works<br />

(Phase Three)<br />

Sewer and Electricity<br />

Diversion works<br />

(Phase Four)<br />

Traffic Management<br />

arrangements<br />

Temporary two-way traffic<br />

lights westbound along<br />

Middle Street to The City<br />

Road which will be closed<br />

For more information click<br />

here.<br />

Temporary two-way traffic<br />

lights westbound along<br />

Middle Street<br />

For more information click<br />

here.<br />

Middle<br />

Street/Union<br />

Street junction<br />

Willoughby<br />

Street to Union<br />

Street<br />

06/01/2013-<br />

On going<br />

28/01/2013 –<br />

on-going<br />

Styring Street 25/03/2013<br />

08/04/2013-<br />

Changes to signalling<br />

at Tesco junction.<br />

Sewer and Electricity<br />

Diversion works<br />

(Phase Four B)<br />

Partial bus station<br />

configuration<br />

New bus station<br />

configuration<br />

Replacement of <strong>the</strong><br />

permanent signals to facilitate<br />

fur<strong>the</strong>r utility diversion<br />

For more information click<br />

here.<br />

Signal layout adjusted to<br />

accommodate works<br />

Styring Street TBC Sewer and Electricity<br />

Diversion works<br />

(Phase six)<br />

New lining detail to<br />

accommodate <strong>the</strong> sewer<br />

works due to <strong>the</strong> proximity to<br />

<strong>the</strong> junction


Site/<br />

Location<br />

Beeston<br />

shopping<br />

Square<br />

Planned<br />

work<br />

dates/times<br />

11/04/2013-<br />

10/06/2013<br />

TBC<br />

Date-linked activity<br />

breakdown<br />

Soft strip of <strong>the</strong> local<br />

shops<br />

Ball and Chain<br />

Traffic Management<br />

arrangements<br />

Work area segregated with<br />

pedestrian management<br />

Chilwell Road<br />

between junction<br />

of Devonshire<br />

Avenue and<br />

Foster Avenue<br />

19/02/2013-<br />

23/03/2013<br />

Water diversion works<br />

Footway closure pedestrians<br />

diverted to opposite side<br />

Temporary traffic lights.<br />

For more information click<br />

here.<br />

Commercial<br />

Avenue<br />

11/03/2013-<br />

29/03/2012<br />

Demolition of Hunts for<br />

a Bargain<br />

Highway works to be<br />

confirmed<br />

Works within <strong>the</strong> boundary<br />

For more information click<br />

here.<br />

Chilwell High<br />

Road – Police<br />

Station to Ellis<br />

Grove (Phase<br />

1)<br />

25/03/2013 Phase 1 – service<br />

diversion works and<br />

permanent works<br />

within scheme.<br />

Chilwell Road/ High Road,<br />

between Middle Street and<br />

Cator Lane/ Meadow Lane,<br />

will be unavailable for<br />

through-traffic, although<br />

some local access will be<br />

available. Through-traffic<br />

will instead be diverted<br />

along Queen’s Road, where<br />

traffic capacity, as its<br />

junctions with Meadow<br />

Lane and Station Road, has<br />

recently been increased.


Site/<br />

Location<br />

Chilwell Road<br />

/Holly Lane<br />

between Holly<br />

Lane and Police<br />

Station<br />

Planned<br />

work<br />

dates/times<br />

Date-linked activity<br />

breakdown<br />

Traffic Management<br />

arrangements<br />

TBC Sewer lining works Temporary traffic lights and<br />

verge works<br />

High Road to <strong>the</strong><br />

junction of<br />

Bridge Avenue<br />

On hold<br />

Gas diversion works<br />

Water diversion works<br />

trial holes<br />

Temporary three-way traffic<br />

lights


Site/<br />

Location<br />

Queens Road/<br />

Station Road<br />

Junction<br />

Planned<br />

work<br />

dates/times<br />

14/01/2013-<br />

Date-linked activity<br />

breakdown<br />

Installation of new kerb<br />

line westbound(phase<br />

one)<br />

Traffic Management<br />

arrangements<br />

Lane restriction westbound<br />

For more information click<br />

here.<br />

04/03/2013<br />

12/03/2013<br />

Electricity crossing of<br />

Queens Road(phase<br />

two)<br />

Lane restrictions eastbound<br />

and westbound Temporary 4<br />

way traffic lights 10/03/2013,<br />

Existing lights reconfigured<br />

<strong>from</strong> 04/03/13<br />

11/03/2013-<br />

15/03/2013<br />

WPD cabling jointing<br />

and Communication<br />

box relocation<br />

Lane restrictions eastbound<br />

15/03/2013-<br />

21/03/2013<br />

Installation of new kerb<br />

line eastbound (phase<br />

four) including drainage<br />

Lane restrictions eastbound<br />

21/03/2013 –<br />

24/03/2013<br />

Surfacing of<br />

carriageway (wea<strong>the</strong>r<br />

dependent)<br />

Temporary traffic lights<br />

Lane restrictions within <strong>the</strong><br />

junctions while <strong>the</strong> surfacing<br />

is in progress, traffic will<br />

switch throughout day<br />

For more information click<br />

here.<br />

Chilwell


Site/<br />

Location<br />

Central College<br />

With <strong>the</strong> junction<br />

of High Road<br />

Planned<br />

work<br />

dates/times<br />

11/03/2013-<br />

12/04/2013<br />

Links to I.D.<br />

38<br />

TBC<br />

Date-linked activity<br />

breakdown<br />

Electricity diversion<br />

works and<br />

communication<br />

diversion works<br />

Demolition of house on<br />

Gwenbrook Avenue<br />

Traffic Management<br />

arrangements<br />

Pedestrian management<br />

outside Central College and<br />

traffic lights when needed<br />

Works within <strong>the</strong> boundary<br />

For more information click<br />

here.<br />

Grove Avenue<br />

with <strong>the</strong><br />

junction of<br />

High Road<br />

25/03/2013-<br />

26/04/2013<br />

communication<br />

diversion works<br />

Road closure of Grove<br />

Avenue with localised<br />

diversion<br />

Cator Lane On hold Sewer diversion works Works will be offline within <strong>the</strong><br />

open space minimal traffic<br />

management required<br />

For more information click<br />

here.<br />

Bramcote Lane<br />

at junction with<br />

Sandby Court<br />

On hold<br />

08/04/2013-<br />

10/06/2013<br />

Inham Road 07/01/2013-<br />

On going<br />

04/03/2013-<br />

09/07/2013<br />

Culvert installation<br />

works<br />

Culvert installation<br />

works<br />

Installation of <strong>the</strong> tram<br />

stop<br />

Construction of tram<br />

crossing<br />

Clifton and Silverdale<br />

Works will be offline within <strong>the</strong><br />

open space minimal traffic<br />

management required<br />

For more information click<br />

here.<br />

Road closure of Bramcote<br />

Lane <strong>from</strong> <strong>the</strong> junction of<br />

Sandby Court and Hall Drive<br />

Offline works which is behind<br />

<strong>the</strong> new chain link fence <strong>from</strong><br />

Inham Road within <strong>the</strong> open<br />

space<br />

Temporary two-way traffic<br />

lights


Site/<br />

Location<br />

Planned<br />

work<br />

dates/times<br />

Fairham Brook 20/08/2012-<br />

TBC due to<br />

wea<strong>the</strong>r<br />

Date-linked activity<br />

breakdown<br />

Earthworks<br />

Traffic Management<br />

arrangements<br />

Works within <strong>the</strong> boundary<br />

For more information click<br />

here.<br />

Silverdale Walk<br />

Footway closed<br />

11/03/2013-<br />

05/04/2013<br />

08/10/2012-<br />

06/10/2013<br />

Piling works for new<br />

bridge<br />

Earthworks and<br />

communication works<br />

Works within <strong>the</strong> boundary<br />

Footway diversion will be in<br />

place<br />

Farnborough<br />

Road/<br />

Southchurch<br />

Drive junction<br />

Leading to<br />

Rivergreen<br />

junction<br />

Southchurch<br />

Drive<br />

Swansdowne<br />

Drive up to<br />

Green Lane<br />

island<br />

Southchurch<br />

Green lane<br />

island along<br />

Southchurch<br />

Drive to Holy<br />

Trinity island<br />

Southchurch<br />

Drive<br />

Farnborough<br />

Road Holy<br />

Trinity Island<br />

11/03/2013-<br />

24/09/2013<br />

11/03/2013-<br />

24/09/2013<br />

TBC<br />

22/10/2012-<br />

On hold<br />

Service diversion and<br />

full construction works<br />

Service diversion and<br />

full construction works<br />

Service diversion and<br />

full construction works<br />

advance highway works<br />

Road closure <strong>from</strong> St. Francis<br />

Church to Rivergreen junction<br />

with access only for residents<br />

For more information click<br />

here.<br />

Road closure <strong>from</strong> Donington<br />

Road to Green Lane island<br />

with traffic lights <strong>from</strong> <strong>the</strong><br />

access of <strong>the</strong> leisure centre<br />

up to Simone Gardens<br />

Traffic controlled by<br />

temporary traffic lights<br />

For more information click<br />

here.<br />

Traffic restrictions around <strong>the</strong><br />

island including narrow lanes.<br />

For more information click<br />

here.


Site/<br />

Location<br />

Southchurch<br />

Drive<br />

Farnborough<br />

Road Holy<br />

Trinity Island<br />

Planned<br />

work<br />

dates/times<br />

10/09/2012-<br />

On-going<br />

Date-linked activity<br />

breakdown<br />

Electricity<br />

Communication<br />

diversion works and<br />

Water diversion works<br />

Traffic Management<br />

arrangements<br />

Temporary two-way traffic<br />

lights <strong>from</strong> holy trinity moving<br />

up Farnborough Road<br />

northbound and Southchurch<br />

Drive minimal stop and go if<br />

needed<br />

For more information click<br />

here.<br />

Holy Trinity<br />

shops<br />

22/10/2012-<br />

On going<br />

Communications<br />

diversion works and<br />

advance highway works<br />

Links with ID 173<br />

Pedestrian management<br />

within <strong>the</strong> shopping area<br />

04/03/2013-<br />

On hold<br />

Water diversion works<br />

Pedestrian management<br />

within <strong>the</strong> shopping area


Site/<br />

Location<br />

Gardendale<br />

Avenue<br />

Bransdale Road<br />

Widecombe<br />

Lane Chepstow<br />

Road<br />

Planned<br />

work<br />

dates/times<br />

15/10/2012-<br />

On going<br />

Date-linked activity<br />

breakdown<br />

Water diversion works<br />

Traffic Management<br />

arrangements<br />

Traffic controlled by a priority<br />

system on Gardendale<br />

avenue in 20 metre sections<br />

which will lead into Bransdale<br />

Road<br />

For more information click<br />

here.<br />

02/02/2013 –<br />

On going<br />

Water diversion works<br />

Traffic controlled by a priority<br />

system <strong>from</strong> Pinewood<br />

Gardens to Chepstow Road<br />

02/04/2013-<br />

26/04/2013<br />

Water diversion works<br />

Road closure of Chepstow<br />

Road with localised diversion<br />

along Widecombe Lane <strong>the</strong>n<br />

Bransdale onto Farnborough<br />

Road and vice versa<br />

Clifton Park and<br />

Ride site<br />

29/04/2013-<br />

10/05/2013<br />

16/07/2012 –<br />

On going<br />

TBC<br />

Water diversion works<br />

Construction of <strong>the</strong><br />

Park and Ride<br />

Stats diversion works<br />

Lenton and Dunkirk<br />

Road closure of Bransdale<br />

Road with localised diversion<br />

along Farnborough Road<br />

Chepstow Road and<br />

Widecombe Lane<br />

No traffic management<br />

required due to location<br />

which is in a field (off<br />

highway)<br />

Temporary three way traffic<br />

lights


Site/<br />

Location<br />

Lenton Lane<br />

Clayton Bridge<br />

Planned<br />

work<br />

dates/times<br />

11/03/2012-<br />

06/05/2013<br />

Date-linked activity<br />

breakdown<br />

Structural bridge<br />

works and Utilities<br />

Traffic Management<br />

arrangements<br />

Clayton Bridge closed <strong>from</strong><br />

Poplars Court and Trevithick<br />

Boatyard localised diversion<br />

will be in place and traffic<br />

lights Clayton Bridge will be<br />

open for pedestrians<br />

For more information click<br />

here.<br />

Clayton<br />

towpath<br />

Lenton Lane<br />

Willow Road<br />

junction and<br />

wood yard<br />

18/03/2013<br />

06/05/2013<br />

04/03/2013-<br />

19/04/2013<br />

Structural bridge<br />

works<br />

Communications<br />

diversions and gas<br />

and water<br />

Towpath closed next to<br />

Canal with diversion<br />

Works within <strong>the</strong> wood yard<br />

first <strong>the</strong>n<br />

Temporary traffic lights and<br />

footway restrictions<br />

Friar Street Old<br />

Church Street<br />

Priory Street<br />

12/11/2012-<br />

Recommence<br />

Electricity diversion<br />

works<br />

No impact on traffic.<br />

Pavement restricted but open<br />

for use<br />

11/02/2013-<br />

On-going<br />

Electricity diversion<br />

works<br />

Traffic controlled by give and<br />

take in 10 metre sections<br />

For more information click<br />

here.


Site/<br />

Location<br />

Abbey Bridge /<br />

Abbey Street /<br />

Gregory Street<br />

junction<br />

Planned<br />

work<br />

dates/times<br />

09/07/2012 –<br />

autumn 2013<br />

Date-linked activity<br />

breakdown<br />

Various utility<br />

diversion works and<br />

tram track laying<br />

Traffic Management<br />

arrangements<br />

Various temporary traffic<br />

arrangements needed to<br />

carry out works. These are:<br />

Lane restrictions on Abbey<br />

Street / Abbey Bridge<br />

approach / exit <strong>from</strong> Gregory<br />

Street junction.<br />

For more information click<br />

here.<br />

Access to Gregory Street<br />

north will be maintained in<br />

both directions and no access<br />

to Gregory Street South <strong>from</strong><br />

<strong>the</strong> junction.<br />

Lenton Lane / Gregory Street<br />

Delays are expected on <strong>the</strong>se<br />

routes during <strong>the</strong> works<br />

Gregory Street<br />

South White<br />

Hart junction<br />

Science Road,<br />

in <strong>the</strong> grounds of<br />

<strong>the</strong> <strong>University</strong><br />

22/04/2013-<br />

20/03/2014<br />

01/10/2012<br />

On going<br />

TBC<br />

Various utility<br />

diversion works and<br />

tram track laying<br />

Demolition of<br />

Merrivale Nursery<br />

Tree clearance within<br />

property boundaries<br />

Closure of Gregory Street<br />

South <strong>from</strong> <strong>the</strong> junction of<br />

Leen Gate local diversion on<br />

Derby Road<br />

Hoarding to be installed<br />

Works within <strong>the</strong> footway<br />

minimal pedestrian<br />

management<br />

22/04/2013-<br />

30/06/2013<br />

Full construction<br />

works and drainage<br />

Science Road closed <strong>from</strong> <strong>the</strong><br />

junction of A52 access road<br />

diversion via Coates Road.<br />

Bus Local Link 12 affected.


Site/<br />

Location<br />

Science Road in<br />

<strong>the</strong> grounds of<br />

<strong>the</strong> <strong>University</strong><br />

East Drive with<br />

<strong>the</strong> junction of<br />

<strong>University</strong><br />

Boulevard<br />

Planned<br />

work<br />

dates/times<br />

22/10/2012-<br />

On going<br />

TBC Early<br />

2013<br />

Date-linked activity<br />

breakdown<br />

Gas Diversion Works<br />

Communication works<br />

Gas diversion works<br />

crossing<br />

communication<br />

diversion works<br />

Traffic Management<br />

arrangements<br />

Two-way temporary traffic<br />

lights through Science Road<br />

near A52 access road<br />

Closure of East Drive leading<br />

to <strong>the</strong> <strong>University</strong> Boulevard<br />

A6005 Beeston<br />

Road <strong>from</strong> Lace<br />

Street to Jesse<br />

Boot Avenue<br />

TBC<br />

Splitter island removal<br />

and traffic light<br />

configuration<br />

Communication<br />

diversion crossing<br />

works<br />

Lane restrictions north and<br />

southbound on Beeston Road<br />

For more information click<br />

here.<br />

<strong>University</strong><br />

Boulevard,<br />

between<br />

junction of East<br />

Drive and<br />

Queens Road<br />

East roundabout<br />

11/03/2013<br />

8am<br />

to 15.30<br />

Water diversion works<br />

Crossing<br />

Lane one closed <strong>from</strong> <strong>the</strong><br />

junction of Jesse Boot<br />

Avenue west bound / towards<br />

Beeston and right turn<br />

eastbound restricted leading<br />

into Jesse Boot Avenue<br />

For more information click<br />

here.<br />

<strong>University</strong><br />

Boulevard,<br />

between<br />

junction of East<br />

Drive and<br />

Queens Road<br />

East roundabout<br />

17/09/2012-<br />

On going<br />

Communication<br />

Diversion works<br />

Electricity diversion<br />

works<br />

Gas Diversion works<br />

Water diversion works<br />

Pedestrian and cycle<br />

measures only. The work is<br />

not in <strong>the</strong> carriageway.<br />

Pedestrian access will be<br />

maintained, cyclists may need<br />

to dismount <strong>from</strong> time to time.


Site/<br />

Location<br />

<strong>University</strong><br />

Boulevard<br />

eastbound<br />

opposite <strong>the</strong><br />

Hockey Club to<br />

East drive and<br />

Beeston road<br />

Planned<br />

work<br />

dates/times<br />

14/01/2013-<br />

On-going<br />

Off peak<br />

09.30 to 15.30<br />

Date-linked activity<br />

breakdown<br />

Communication<br />

Diversion works<br />

Traffic Management<br />

arrangements<br />

Lane restriction along<br />

<strong>University</strong> Boulevard<br />

eastbound<br />

For more information click<br />

here.<br />

<strong>University</strong><br />

Boulevard<br />

Westbound<br />

outside <strong>the</strong><br />

Hockey Club<br />

02/01/2013 –<br />

On going<br />

Construction of<br />

temporary footpath to<br />

facilitate surcharge<br />

works<br />

Bus Stop UN08 suspended<br />

<strong>from</strong> use until fur<strong>the</strong>r notice<br />

For more information click<br />

here.<br />

Queens Road<br />

East Island,<br />

between Lower<br />

Road and<br />

Queens Road<br />

East<br />

14/01/2013-<br />

Off peak 09.30<br />

to 15.30<br />

Noel Street 29/03/2013-<br />

11/04/2013<br />

Advance highway<br />

works and tree<br />

removal<br />

Line One<br />

Renewal of track<br />

Lane restrictions around <strong>the</strong><br />

island and on <strong>University</strong><br />

Boulevard westbound<br />

Queens Road east and<br />

A6464<br />

For more information click<br />

here.<br />

Road closure of Noel Street<br />

Bulwell TBC Renewal of track Works are on Line 1<br />

Wilkinson St<br />

Depot to<br />

Radford Road<br />

02/04/2013-<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

Wilkinson St.<br />

Depot to<br />

Shipstone<br />

04/03/2013-<br />

05/03/2013<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas


Site/<br />

Location<br />

Hyson Green to<br />

Forest SST<br />

Planned<br />

work<br />

dates/times<br />

08/04/2013-<br />

09/04/2013<br />

20.00 to<br />

05.00<br />

Date-linked activity<br />

breakdown<br />

Cabling works<br />

Traffic Management<br />

arrangements<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

Forest to High<br />

school<br />

11/04/2013-<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

High school to<br />

Trent <strong>University</strong><br />

12/04/2013-<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

Trent <strong>University</strong><br />

to Old Market<br />

Square<br />

15/04/2013-<br />

16/04/2013<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

Old Market<br />

Square to<br />

Middle Hill SST<br />

17/04/2013-<br />

18/04/2013<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

Middle Hill SST<br />

to Station Street<br />

19/04/2013-<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

Station Street to<br />

Lace Market<br />

23/04/2013-<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

Lace Market to<br />

Royal Centre<br />

24/04/2013-<br />

26/04/2013<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas


Site/<br />

Location<br />

Royal Centre to<br />

High School<br />

Planned<br />

work<br />

dates/times<br />

29/04/2013-<br />

30/04/2013<br />

20.00 to<br />

05.00<br />

Date-linked activity<br />

breakdown<br />

Cabling works<br />

Traffic Management<br />

arrangements<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

High School to<br />

Noel Street<br />

01/05/2013-<br />

03/05/2013<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

Noel Street to<br />

Beaconsfield<br />

26/04/2013-<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

Beaconsfield to<br />

Shipstone street<br />

03/05/2013-<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

Shipstone Street<br />

New Depot SST<br />

03/05/2013-<br />

20.00 to<br />

05.00<br />

Cabling works<br />

Pedestrian management<br />

within <strong>the</strong> works areas<br />

<strong>Nottingham</strong> City<br />

Station Streetbetween<br />

junction of Trent<br />

Street and<br />

Carrington<br />

Street<br />

10/04/2012 -<br />

Restart<br />

25/03/2013-<br />

24/05/2013<br />

North pier Station<br />

Street Bridge works<br />

One-way temporary traffic<br />

system between Trent Street<br />

and Carrington Street.<br />

Restrictions for pedestrians<br />

around <strong>the</strong> works. Four taxi<br />

spaces to be closed during<br />

<strong>the</strong> works. Pavement closed<br />

between Trent Street and<br />

<strong>Nottingham</strong> Station side<br />

entrance. Pedestrians to use<br />

north side pavement instead.<br />

For more information click


Site/<br />

Location<br />

Planned<br />

work<br />

dates/times<br />

06/04/2013-<br />

For one<br />

night 8pm<br />

to 5am<br />

20/04/2013<br />

For one night<br />

8pm to 5am<br />

Date-linked activity<br />

breakdown<br />

Preparation works for<br />

foot bridge removal<br />

Removal of <strong>the</strong><br />

pedestrian footbridge<br />

spanning Station Street<br />

Traffic Management<br />

arrangements<br />

here.<br />

Station Street closed between<br />

<strong>the</strong> junction of Trent Street<br />

and Carrington Street to west<br />

bound traffic during night<br />

times only. A signed<br />

diversion route will be in place<br />

on <strong>the</strong>se dates and times.<br />

The closure is needed to<br />

make room for a crane to be<br />

used to install equipment to<br />

construct <strong>the</strong> north pier. N.B.<br />

This section of Station Street<br />

is already one-way east<br />

bound only.<br />

For more information click<br />

here.<br />

Traffic Street 17/09/2012-<br />

On going<br />

Communication<br />

diversion works<br />

Temporary footway to be<br />

provided adjacent to <strong>the</strong><br />

existing pavement for <strong>the</strong><br />

duration of <strong>the</strong> works.<br />

For more information click<br />

here.<br />

Wilford Street,<br />

with <strong>the</strong> junction<br />

of Castle<br />

Boulevard<br />

Carrington<br />

Street<br />

With <strong>the</strong> junction<br />

of Station Street<br />

04/02/2013-<br />

19/04/2013<br />

Off peak<br />

09.30 to<br />

15.30<br />

02/04/2013-<br />

12/04/2013<br />

Off peak<br />

09.30 to<br />

15.30<br />

Communication<br />

diversion works<br />

Communication<br />

diversion works<br />

Phase 1<br />

Northbound Lane restriction<br />

on Wilford Street to allow a<br />

temporary footway to be<br />

provided, adjacent to <strong>the</strong><br />

existing pavement, for <strong>the</strong><br />

duration of <strong>the</strong> works<br />

For more information click<br />

here.<br />

Pavement restricted but open<br />

for use<br />

For more information click<br />

here.


Site/<br />

Location<br />

Carrington<br />

Street with <strong>the</strong><br />

junction on<br />

Station Street<br />

Planned<br />

work<br />

dates/times<br />

24/03/2013<br />

07/03/2013<br />

Sunday<br />

working only<br />

Date-linked activity<br />

breakdown<br />

Communication<br />

diversion works<br />

Phase 2<br />

Traffic Management<br />

arrangements<br />

Two-way traffic lights<br />

Queen’s Road,<br />

between<br />

Summer Leys<br />

Lane and<br />

Arkwright Street<br />

17/03/2013<br />

24/03/2013<br />

Sunday<br />

working<br />

only<br />

09.00 to<br />

18.00<br />

11/06/2012 -<br />

Communication<br />

diversion works<br />

Phase3<br />

Preparatory works for<br />

station bridge<br />

installation<br />

Temporary traffic lights on<br />

<strong>the</strong> junction of Carrington<br />

Street and Queens Road<br />

One lane closed westbound<br />

on Queen’s Road between<br />

Summer Leys Lane and<br />

Arkwright Street. Vehicle<br />

access to apartments<br />

maintained. Temporary<br />

pedestrian walkway through<br />

<strong>the</strong> works<br />

For more information click<br />

here.<br />

13/01/2013-<br />

30/05/2013<br />

Preparatory works for<br />

station bridge<br />

installation<br />

One lane closed westbound<br />

on Queen’s Road between<br />

Summer Leys Lane and<br />

Arkwright Street. Vehicle<br />

access to apartments<br />

maintained. Temporary<br />

pedestrian walkway through<br />

<strong>the</strong> works<br />

Queen’s Road,<br />

between<br />

08/04/2013-<br />

10/04/2013<br />

13/05/2013-<br />

Launch nose<br />

preparation works<br />

Removal of trestles and<br />

Road closure and localised<br />

diversion<br />

Road closure and localised


Site/<br />

Location<br />

Summer Leys<br />

Lane and<br />

Arkwright Street<br />

Planned<br />

work<br />

dates/times<br />

24/05/2013<br />

10/06/2013-<br />

14/06/2013<br />

Date-linked activity<br />

breakdown<br />

concrete barriers<br />

Installation of bridge<br />

girders<br />

Traffic Management<br />

arrangements<br />

diversion<br />

Road closure and localised<br />

diversion<br />

01/07/2013-<br />

26/07/2013<br />

Permanent works on<br />

<strong>the</strong> bridge deck<br />

Road closure and localised<br />

diversion<br />

The Meadows<br />

Crocus Street,<br />

between<br />

Waterway Street<br />

and Crocus<br />

Street<br />

25/06/2012-<br />

06/07/2013<br />

Site compound and<br />

main works.<br />

Crocus Street closed between<br />

Waterway Street and Crocus<br />

Street with temporary<br />

pedestrian management for<br />

all service diversion works<br />

Temporary traffic<br />

management arrangements<br />

as above<br />

For more information click<br />

here.<br />

Arkwright Walk<br />

leading to Burge<br />

Close<br />

Meadows Way<br />

with <strong>the</strong><br />

junction of<br />

Mabel Street<br />

21/01/2013-<br />

On going<br />

02/04/2013-<br />

09/04/2013<br />

Communication<br />

diversion works<br />

Communication<br />

diversion works<br />

Footways restricted but open<br />

for use<br />

For more information click<br />

here.<br />

Traffic controlled by<br />

Temporary traffic lights


Site/<br />

Location<br />

Meadows Way,<br />

between<br />

junction of<br />

Kinglake Place<br />

and Castlefields<br />

Planned<br />

work<br />

dates/times<br />

10/09/2012-<br />

On going<br />

11/03/2013-<br />

12/04/2013<br />

On hold<br />

Recommence<br />

02/04/2013<br />

Date-linked activity<br />

breakdown<br />

Sewer diversion<br />

works (Phase Three)<br />

Sewer diversion<br />

Part two<br />

Traffic Management<br />

arrangements<br />

Temporary two-way traffic<br />

lights <strong>from</strong> Furse leading up<br />

to Kinglake Place<br />

For more information click<br />

here.<br />

Furse access road closed<br />

Lane one closed on<br />

Waterway Street West<br />

outbound<br />

Meadows Way,<br />

between<br />

junction of<br />

Castlefields and<br />

Gritley Mews<br />

25/03/2013-<br />

29/03/2013<br />

Communication<br />

diversion works<br />

Electricity diversion<br />

works<br />

Footway management and a<br />

temporary pedestrian<br />

walkway around <strong>the</strong> works<br />

Three-way temporary traffic<br />

lights on Meadows Way itself<br />

between Castlefields and<br />

Gritley Mews and at above<br />

side road entrances to<br />

Meadows Way.<br />

For more information click<br />

here.


Site/<br />

Location<br />

Waterway Street<br />

West opposite<br />

Queens Bridge<br />

Road<br />

Planned<br />

work<br />

dates/times<br />

16/09/2012-<br />

TBC<br />

Date-linked activity<br />

breakdown<br />

Water diversion works<br />

(Phase Three)<br />

And o<strong>the</strong>r Utilities<br />

Traffic Management<br />

arrangements<br />

Sheriffs Way north leading to<br />

<strong>the</strong> island will be in a<br />

contraflow leading to <strong>the</strong><br />

junction<br />

14/01/2013-<br />

TBC<br />

11/02/2013-<br />

TBC<br />

Demolition of<br />

underpass at<br />

Meadows Way<br />

Closure of underpass<br />

Full construction<br />

works<br />

Meadows Way will be closed<br />

between <strong>the</strong> junction of<br />

Arkwright Street and Sheriffs<br />

Way<br />

Meadows Way will also be<br />

closed between <strong>the</strong> junctions<br />

of Kinglake Place to Sheriffs<br />

Way. New temporary<br />

pedestrian crossing on<br />

Arkwright Street to facilitate<br />

<strong>the</strong> demolition<br />

For more information click<br />

here.<br />

Queens Drive<br />

<strong>from</strong> <strong>the</strong> portal<br />

to Castle Bridge<br />

Road<br />

Meadows Way /<br />

Saffron Gardens<br />

junction<br />

TBC<br />

On hold<br />

Communications<br />

diversions works<br />

Electricity diversion<br />

works<br />

Pavement restricted but open<br />

for use<br />

Verge working only. No<br />

impact on traffic. Pavement<br />

restricted but open for use<br />

For more information click<br />

here.


Site/<br />

Location<br />

Enterprise Way,<br />

opposite<br />

Speedo<br />

Planned<br />

work<br />

dates/times<br />

29/10/2012-<br />

On going<br />

Date-linked activity<br />

breakdown<br />

Gas diversion works<br />

And o<strong>the</strong>r utilities<br />

Traffic Management<br />

arrangements<br />

Works in <strong>the</strong> verge. No<br />

impact on traffic or<br />

pedestrians.<br />

08/01/2012-<br />

Gas diversion works<br />

And o<strong>the</strong>r utilities<br />

Two-way temporary traffic<br />

lights for road crossings<br />

26/11/2012-<br />

On going<br />

Advance highway<br />

works to remove<br />

island and splitter<br />

islands<br />

Site clearance within<br />

<strong>the</strong> boundary<br />

Traffic controlled by lane<br />

restrictions around <strong>the</strong> island<br />

Works in <strong>the</strong> verge. No<br />

impact on traffic or<br />

pedestrians<br />

08/04/2013-<br />

06/05/2013<br />

Queens Walk 16/04/2012 -<br />

On going<br />

Queens Walk 17/07/2012-<br />

Until works<br />

have been<br />

completed<br />

Advance highway<br />

works to remove<br />

island and splitter<br />

islands<br />

On Queens Drive<br />

Sewer diversion<br />

works<br />

Modification of<br />

pedestrian crossing<br />

Lane restrictions in both<br />

directions on Queens Drive<br />

and NG2<br />

Verge works with some<br />

pedestrian / cycling<br />

restrictions<br />

For more information click<br />

here.<br />

Pedestrian crossing on Robin<br />

Hood Way so we can close<br />

<strong>the</strong> underpass


Site/<br />

Location<br />

Wilford Toll<br />

Bridge Island<br />

Planned<br />

work<br />

dates/times<br />

15/10/2012 –<br />

Date-linked activity<br />

breakdown<br />

Sewer diversion<br />

(Phase 3)<br />

Traffic Management<br />

arrangements<br />

Minimal TM required to<br />

ensure uninterrupted access<br />

to Sweet Leys Road<br />

12/11/2012-<br />

On going<br />

Two-way traffic lights for <strong>the</strong><br />

tie into <strong>the</strong> manhole<br />

Wilford Toll<br />

Bridge Island<br />

26/11/2012-<br />

TBC<br />

Full construction of<br />

<strong>the</strong> track slab and bell<br />

mouth within riverside<br />

way and <strong>the</strong> island<br />

Riverside Way westbound<br />

and eastbound carriageway<br />

closed <strong>from</strong> island to<br />

industrial estate entrance.<br />

On-street parking suspended<br />

on west bound side near <strong>the</strong><br />

island. Localised diversion<br />

Victoria Embankment closed<br />

while works are on-going at<br />

<strong>the</strong> Riverside Way entrance<br />

For more information click<br />

here.<br />

Toton


Site/<br />

Location<br />

Toton Lane at<br />

Bardills Island<br />

Planned<br />

work<br />

dates/times<br />

28/05/2012 -<br />

23/11/2012<br />

Date-linked activity<br />

breakdown<br />

Electricity diversion<br />

works<br />

Traffic Management<br />

arrangements<br />

Works in east pavement at<br />

Bardills Island with temporary<br />

pedestrian management<br />

through <strong>the</strong> work area. No<br />

impact on traffic<br />

On hold<br />

Widening works for <strong>the</strong><br />

new entrance to park<br />

and ride<br />

(Phase one offline<br />

generally)<br />

No traffic management until if<br />

needed two way traffic lights<br />

on Toton lane dates TBC<br />

02/04/2013-<br />

26/04/2013<br />

Water diversion<br />

works<br />

Footway closure with<br />

pedestrian crossing<br />

opposite sub station<br />

02/04/2013-<br />

10/04/2013<br />

Rail deliveries<br />

Wilford and Compton Acres<br />

Assistance into Toton<br />

access


Site/<br />

Location<br />

Wilford Toll<br />

Bridge<br />

Planned<br />

work<br />

dates/times<br />

31/07/2012<br />

20/08/2012-<br />

On going<br />

Date-linked activity<br />

breakdown<br />

On-going<br />

streng<strong>the</strong>ning and<br />

widening of <strong>the</strong> bridge<br />

Traffic Management<br />

arrangements<br />

Temporary traffic<br />

management arrangements<br />

TBC<br />

For more information click<br />

here.<br />

Coronation<br />

Avenue<br />

By railway<br />

embankment<br />

30/07/2012-<br />

On going<br />

Electricity Diversion<br />

Works and vegetation<br />

clearance.<br />

BT/Virgin Media<br />

Pedestrian and cycle<br />

measures only. Pedestrian<br />

access will be maintained,<br />

cyclists may need to dismount<br />

<strong>from</strong> time to time.<br />

For more information click<br />

here.<br />

Main Road (<strong>from</strong><br />

junction of<br />

Coronation<br />

Avenue to<br />

Wilford Toll<br />

Bridge)<br />

13/08/2012 –<br />

Restarted but<br />

subject to<br />

interruption by<br />

inclement<br />

wea<strong>the</strong>r<br />

Earthworks removal<br />

of embankment<br />

Permanent closure of Main<br />

Road <strong>from</strong> its junction of<br />

Coronation Avenue to Wilford<br />

Toll Bridge.<br />

Iremonger Pond 16/08/2012-<br />

On going<br />

Earthworks and <strong>Tram</strong><br />

Partial closure of <strong>the</strong> walkway<br />

around <strong>the</strong> pond


Site/<br />

Location<br />

Wilford Lane, by<br />

former railway<br />

embankment<br />

Planned<br />

work<br />

dates/times<br />

03/09/2012-<br />

TBC<br />

Date-linked activity<br />

breakdown<br />

Electricity diversion<br />

works and<br />

communication<br />

diversion works<br />

Traffic Management<br />

arrangements<br />

Verge working within <strong>the</strong><br />

boundary<br />

For more information click<br />

here.<br />

04/02/2013-<br />

05/06/2013<br />

Earthworks and<br />

Drainage works<br />

Plant crossing in operation<br />

As and when needed<br />

Removal of <strong>the</strong><br />

former railway<br />

embankment<br />

Ruddington<br />

Lane near to<br />

South<br />

<strong>Nottingham</strong><br />

Industrial Park<br />

Ruddington<br />

Lane near to<br />

South<br />

<strong>Nottingham</strong><br />

Industrial Park<br />

07/03/2013-<br />

19/08/2013<br />

13/08/2012 –<br />

Recommence<br />

18/03/2013<br />

Drainage works<br />

Earthworks and<br />

vegetation clearance<br />

03/10/2012- Structures and o<strong>the</strong>r<br />

utilities diversions<br />

Footway diversion to<br />

accommodate <strong>the</strong> drainage<br />

works<br />

Works within <strong>the</strong> boundary.<br />

Permanent plant crossings to<br />

accommodate removal<br />

For more information click<br />

here.<br />

Road closed near to Field<br />

Way and South <strong>Nottingham</strong><br />

Industrial Park with localised<br />

diversion<br />

For more information click<br />

here.<br />

TBC Highways Installation of a new footway<br />

<strong>from</strong> Kynance Gardens to<br />

Ascot Gardens footway works<br />

are offline