23.11.2014 Views

Develop, implement and maintain an improvement / upgrade plan

Develop, implement and maintain an improvement / upgrade plan

Develop, implement and maintain an improvement / upgrade plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Module 5 Improvement/Upgrade Pl<strong>an</strong><br />

Session structure<br />

• Why do we need <strong>an</strong> <strong>improvement</strong>/<strong>upgrade</strong> pl<strong>an</strong>?<br />

• Overview<br />

• Actions<br />

• Challenges<br />

• Outputs<br />

• Exercises<br />

2


Module 5 Improvement/Upgrade Pl<strong>an</strong><br />

Why do we need <strong>an</strong> <strong>improvement</strong>/<strong>upgrade</strong> pl<strong>an</strong>?<br />

• Prioritise action for each uncontrolled or ineffectively<br />

controlled risk<br />

• Implement short, medium <strong><strong>an</strong>d</strong> long term activities<br />

• Maximize effectiveness of resources<br />

Do you know what to do?<br />

3


Module 5 Improvement/Upgrade Pl<strong>an</strong><br />

Overview<br />

• Improvement/<strong>upgrade</strong> Pl<strong>an</strong> involves<br />

• <strong>Develop</strong>ment<br />

• Implementation<br />

• Mainten<strong>an</strong>ce<br />

• Monitoring <strong><strong>an</strong>d</strong> review of <strong>upgrade</strong>s<br />

• Required due to absent or ineffective control measures<br />

• Should explicitly state who is responsible<br />

4


Module 5 Improvement/Upgrade Pl<strong>an</strong><br />

Introduction of new controls could introduce new risks<br />

Source: http://www.southerndatastream.com/thm/labelle.html<br />

5


Module 5 The pl<strong>an</strong> (Iterative process)<br />

New risks?<br />

Uncontrolled<br />

risks?<br />

Amend<br />

pl<strong>an</strong><br />

<strong>Develop</strong><br />

pl<strong>an</strong><br />

Short<br />

Medium<br />

Long term<br />

Recalculate<br />

the risks<br />

Evaluate<br />

pl<strong>an</strong><br />

Implement<br />

pl<strong>an</strong><br />

Update the<br />

WSP<br />

6


Module 5 The pl<strong>an</strong><br />

Example pl<strong>an</strong><br />

• Review example pl<strong>an</strong> in workbook<br />

• Invent a new ‘Action’<br />

• Complete rest of table:<br />

• Arising from<br />

• Improvement pl<strong>an</strong><br />

• Accountabilities<br />

• Due<br />

• Status<br />

• What other factors need to be considered when developing<br />

<strong>an</strong> <strong>upgrade</strong> pl<strong>an</strong> (see Appendix G)? E.g. Is there a need for<br />

research <strong><strong>an</strong>d</strong> development?<br />

7


Module 5 The pl<strong>an</strong><br />

Challenges<br />

• Ensuring WSP is up to date<br />

• Securing fin<strong>an</strong>ces<br />

• Lack of resources<br />

• Ensuring new risks are not introduced, or are mitigated<br />

8


Module 5 Improvement/Upgrade Pl<strong>an</strong><br />

Outputs<br />

• A prioritised <strong>improvement</strong>/<strong>upgrade</strong> pl<strong>an</strong> for addressing<br />

each uncontrolled risk<br />

• Implementation of short, medium <strong><strong>an</strong>d</strong> long term activities<br />

for <strong>upgrade</strong><br />

• A process for monitoring the pl<strong>an</strong><br />

9


Module 5 The pl<strong>an</strong><br />

Exercise<br />

• In small groups<br />

• <strong>Develop</strong> a suitable ‘health awareness campaign’ for your<br />

water supply area (10 minutes)<br />

• Identify key factors that need consideration for fin<strong>an</strong>cial<br />

investment of a system <strong>upgrade</strong> activity to be realised –<br />

outline a draft proposal (20 minutes)<br />

10


Module 5 Improvement/Upgrade Pl<strong>an</strong><br />

Summary of WSP stage 2 – system assessment<br />

Describe the water<br />

supply system<br />

(Module 2)<br />

Identify the<br />

hazardous<br />

events/hazards &<br />

assess the risks<br />

(Module 3)<br />

Determine & validate<br />

control measures,<br />

reassess & prioritise<br />

risks (Module 4)<br />

<strong>Develop</strong>, <strong>implement</strong><br />

& <strong>maintain</strong> <strong>an</strong><br />

<strong>improvement</strong>/<br />

<strong>upgrade</strong> pl<strong>an</strong><br />

(Module 5)<br />

Catchment<br />

Treatment<br />

Distribution<br />

User<br />

Any agent or event<br />

that c<strong>an</strong> cause harm.<br />

Likelihood <strong><strong>an</strong>d</strong><br />

consequence of<br />

occurrence<br />

What is preventing<br />

hazardous events/hazards<br />

from occurring? How c<strong>an</strong><br />

you be sure these controls<br />

are suitable?<br />

A pl<strong>an</strong> is needed<br />

if existing<br />

controls are<br />

ineffective or<br />

absent<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!