Underfloor Ducting systems for wiring management of Power ... - Eae

deltagci.com

Underfloor Ducting systems for wiring management of Power ... - Eae

QUALITY AND ENVIRONMENTAL MANAGEMENT SYSTEMS

IEC 60439-2

T

s

E

ME 04

ISO

9001

14001

EAE has full right to make any revisions or chances on this catalogue without any prior notice.

www.eae.com.tr

Cakmakli Mahallesi, 2. Cadde,

119. Sokak, No:12 34522

Kirac-Hadimkoy-Istanbul-TURKEY

Tel: +90 (212) 886 23 90

Fax: +90 (212) 886 24 20

ULAŞ TANITIM / E.E./ A.A./ 612 40 66

Underfloor Ducting systems

for wiring management of Power,

Data, Audio-Visual, Alarm,

Telephone facilities for Business Centres,

Bank, Offices, Conference Halls, Hotels, etc.

Catalogue 09 / 00 - Ing. 2.000 Pcs 13/05/2008


w w w . e a e . c o m . t r


CONTENTS

General Description

D Junction Box System Installation Layout

D Product Selection Table

B Junction Box System Installation Layout

B Product Selection Table

Accessories

A Junction Box System Installation Layout

A Product Selection Table

Underfloor Ducting System Installation

Coat Wire Application

2-3

4-5

6-7

8-9

10-11

12-13

14

15

16

16


ELINEDK

ELINEDK

Underfloor Ducting Systems

Underfloor Ducting Systems

E-Line Underfloor Ducting system is a modular and modern cable management

system that brings solutions for any changes in connection with wiring at the time of

installation or in future, and thus proves to be a good support to meet any requirement

that may arise during operation.

E L E K T R İ K

Output Junction Box

Cover that can be fitted in both directions

“E-line Underfloor Ducting Systems” ensures aesthetic, safe and reliable cable

management by eliminating the wiring-related confusion caused in the working environments.

Lockable Cable protection covers

Capacity of 16 different outputs

Easy to use

Applicable Fields

Decorative appearance

Accessories making it easy for

Banks

Shopping Centres

socket and cable installation

Robust and sound construction

Junction Box Cover Set M

35 906

Modern offices

Hotels

Hospitals

Conference Halls

Course Buildings

Cinema and Theatre Halls

Touristic facilities

Elevated floor

Similar spaces.

Output Junction Box N

96 976

Junction Box

Connection Junction Box K

96 977

Significant Advantages

Easy Planning

Possibility of multiple outlet

Easy and quick cable ducting

Robust and sound construction

Elasticity cable ducting

Decorative appearance

Easy and functional use

E-Line ; adapts itself easily to any

modifications or capacity increase

in the working environment of the office.

Access to the system is very easy. Possible needs in future are

met easily thanks to wide ducts and flexible outlet boxes.

System’s capacity is increased without any negative

Easy conformance to projects

Ability of 4-directional outlets

Adjustment possibility

before and after alum

Smooth adjustment capability

up to 7-10 cm heights

Fitting output box feature

Robust and functional construction

Fast and easy installation

Output Junction Box N

Safe cable ducting

effect on decoration.

2 3

96 482


ELINED

Junction Box System

Installation Layout

E L E K T R İ K

Connection Junction Box K (450x450)

96 977

Output Junction Box M (450x450)

35 821

Output Junction Box

96 976

N (450x450) Output Junction Box

96 978

N (360x360)

Output Junction Box M (360x360)

35 820

Connection Junction Box K (360x360)

96 979

4 5


ELINEB

Junction Box System

Installation Layout

E L E K T R İ K

Output Junction Box N-2 (360x720)

35 818

Output Junction Box N (360x360)

96 482

Output Junction Box M (360x360)

35 819

8 9


ELINEDK

Installation Instructions / Coat Wire Application

COAT WIRE APPLICATION;

Attachment of the Ducts

Underloor Ducting systems, in case the screed thickness is small,

before pouring the screed " Rabitz wire" (thin grid wire) should be

applied. In this application a thin cement mortar layer has to be

poured upon the duct and then Rabitz grid shold be laid, then

another cement mortar layer should be poured on the Rabitz grid,

finally the regular screed should be poured, after that the

application is complete.

1

Pull a rope suitable to the system

Attach the supplementary components to the

tab of the duct

2

Cut the resin according to the channel width

Install the other duct to the supplementary

component

Yield the resin for the duct insertion

Perform level adjustment of the junction box

at the gauge

14

Install the duct into the inlet of the junction box

Perform level adjustment of the attachment at

the gauge

3

Completing the connection

Apply smoothing alum

16

1- Pull the rope according to duct layout and alum heights described in the project.

2- Begin installation first from the junction boxes.

3- If construction conditions are suitable, smoothing alum should be applied

onto the mat concrete

4- After that, perform installation of Sub Channels and Junction Boxes with water gauge.

5- If smoothing alum is not applied, ensure that the upper point of the

junction box, channels and outlet windows are at the same level.

6- Initially fix the system to the ground from specific points.

7- Install the transparent plastic protective covers of the junction boxes.

8- While applying alum, ensure that the system installer electricity technician is present.

9- Install the output boxes after the ground covering has been completed.

4

More magazines by this user
Similar magazines