Views
3 years ago

Study on Renewable Energy Resources, Oman - authority for ...

Study on Renewable Energy Resources, Oman - authority for ...

Renewable Energy Resources in Oman Budget The following budget represents the market cost for the technology and does not include design, project management, monitoring, evaluation, reporting and campaigning etc. which should be a part of a pilot project. Break down of construction costs: Component Initial Capital USD PV Array including mounting 136,000 Converter and connections 14,000 Totals 150,000 Action plan Realisation of the pilot project will have the following steps: • Prepare a total budget including project expenses for the following steps. • Ensure financing. • Project planning • Identification of host for project • Design of installations • Procurement, installation, commissioning and testing • Monitoring of results • Evaluation, reporting and presentation of results and conclusions. For the pilot project the monitoring could incorporate hourly data collection which could be utilized by researchers and for demonstration. A display with indication of production could also be included. 9.2.2 10 kW stand alone system Location The capacity corresponds to the capacity need of a small off grid settlement with few houses, perhaps with small service function, restaurant, shop or gasoline station. This type of energy supply is typically made by diesel engines. This will be compared with alternative supply with hybrid systems including solar energy, diesel and battery storage. At a first phase it is suggested to make a pilot project including two different concepts. Concept 1 - One system with 10 kW solar PV, 10 kW diesel and battery storage. Concept 2 - One system with 5 kW solar PV, 10 kW diesel and without battery. The second one can not give a 100 percent cover of the demand as defined above. There will be periods with low level in batteries where people will have to make priorities, for example reduce the air conditioning in order to have power for lighting and cooking. Page 128 of 134 .

Renewable Energy Resources in Oman Break down of construction costs: Concept 1 Component Initial Capital USD PV Array including mounting 68,000 Generator 7,800 Battery 8,000 Converter and connections 7,000 Totals 90,800 Concept 2 Component Initial Capital USD PV Array including mounting 34,000 Generator 7,800 Converter and connections 3,500 Totals 45,300 Page 129 of 134 .

2011 Annual Report - authority for electricity regulation, oman
NON-RENEWABLE AND RENEWABLE ENERGY RESOURCES
A RATIONAL LOOK AT RENEWABLE ENERGY - Wind Watch
Renewable Energy
5905 gp [eu rev]csfr4.qxd - European Renewable Energy Council
Distributed Renewable Energy Operating Impacts and Valuation Study
Renewable Energy Resource Assessment
Renewable Energy Resources - ISNAP
Renewable Energy 101 - Environmental and Energy Study Institute
Energy efficiency and renewables - Euromedina
Case Studies - Renewable Energy Integration: Power to the ... - EERE
primer on the technologies of renewable energy - Pollution Probe
Renewal Energy Resources IV
2011 Renewable Energy Data Book
recent study by Commonwealth North - Renewable Energy Alaska ...
Read More - American Council On Renewable Energy
Renewable Energy Compendium Report - United States Energy ...
Legal Frameworks for Renewable Energy - The Infrastructure ...
Introduction to Wirsol Solar AG - Texas Renewable Energy ...
chile - Observatory for Renewable Energy in Latin America and
UNSD Energy Statistics Questionnaire: Electricity and Renewables