“So What?” •

“So What?” • “It’s just a 1/100 of a gallon per minute per foot” • 0.010 gpm/ft x 500’ = 5 gpm minute x 3 min/day x 2 zones = 30 gal per day off of being balanced or 10% off (300-gpd) • Defeats goal of even distribution

“So What?” • “We only see level LPD fields” • Friction losses over multiple lines can add up (even if level) • High flow systems more susceptible • Unintended distribution patern

Wastewater Feasibility Investigation - Texas Onsite Wastewater ...
Pumps & Panels - Tom Fritts - Texas Onsite Wastewater Association
Advanced Pretreatment/Treatment of Onsite Wastewater ATU and ...
flow equalization for controling flow through an ossf - Texas Onsite ...
Program_2007:Layout 1.qxd - Texas Onsite Wastewater Association
Council - Texas Onsite Wastewater Association
TOWA Insider - Texas Onsite Wastewater Association
on-site - Texas Onsite Wastewater Association
TCEQ Normal Template - Texas Onsite Wastewater Association
Corporte 2008 - Texas Onsite Wastewater Association
TOWA Insider - Texas Onsite Wastewater Association
Inspection of Onsite Wastewater Management Systems
August 9-10-11 in Austin - Texas Onsite Wastewater Association
Florida Onsite Wastewater Association, Inc.
T#:'ffi Hfl Tff i1;:*:il:'#;;,HtHT:f - Texas Onsite Wastewater Association
12-1-10 meeting minutes final.pdf - Texas Onsite Wastewater ...
Onsite Wastewater Treatment Technology and the Preservation of
Volume 13, Issue 1 - Ontario Onsite Wastewater Association
saskatchewan onsite wastewater disposal guide - Regina Qu ...
Onsite Wastewater Treatment Systems Technology Fact ... - Norweco
evaluation of gravelless pipe systems for onsite wastewater
Buying or Selling a Home with an Onsite Wastewater System
Chapter 2: Management of Onsite Wastewater Treatment ... - Norweco
OSTP Pump Selection Design Worksheet - Onsite Sewage ...