Views
3 years ago

NPCA Stormwater Manual – Appendices - Niagara Peninsula ...

NPCA Stormwater Manual – Appendices - Niagara Peninsula ...

Toronto Development

Toronto Development Guide May 2004 ______________________________________________________________________ Comments The level of detail for the Stormwater Management Report depends on the type of application, the size of the development and the types of stormwater management schemes proposed. For example, a report for a Plan of Subdivision will typically be more complex than a report in support of a Site Plan Control application. Appendix 3 - 32

GRCA FINAL SWM SUBMISSION CHECKLIST This checklist is intended for use by the Consultant to ensure that all components of a Final SWM submission are included in an effort towards minimizing the time requirements of the review and approval process. Along with the Preconsultation Checklist and Preliminary SWM Checklist, it will serve as a quick reference to review staff that all required supporting infomation has been provided. This checklist should be included with the Final SWM submission. The checklist was created in conjunction with the Homebuilders Association/GRCA Liaison Committee and will be updated periodically, with the current version available for download from the GRCA website (www.grandriver.ca). Project Name ID # Main Report Background Report(s) Summary Yes No N/A SWM Objectives / Criteria Summary Yes No N/A Description of Existing Conditions incl. Topography, Surface Drainage (with Externals), Soils, GW Characteristics Yes No N/A Infiltration - Requirements, Proposed Strategy, Results Yes No N/A Water Quality - Requirements, Proposed Strategy, Results Yes No N/A Erosion Protection for Receivers - Requirements, Proposed Strategy, Results Yes No N/A Water Quantity - Requirements, Proposed Strategy, Results Yes No N/A Summary of Monitoring Programs completed, on-going, or anticipated Yes No N/A Erosion Potential Evaluation and Anticipated Control Strategy Yes No N/A Reports / Plans signed and sealed Yes No N/A Figures / Plans Location Plan Yes No N/A Pre-Development Storm Drainage Boundaries - include existing topographic information Yes No N/A Post-Development Storm Drainage Boundaries - include proposed grading information Yes No N/A Schematic Representations of Pre- and Post-Development Hydrologic Models Yes No N/A Plans and Profiles for SWMF's and Outlet Configurations Yes No N/A Grading Plan(s) - should include delineation of Constraint Areas and associated Buffers Yes No N/A Cut/Fill Plan(s) - required primarily in floodplain areas or where GW table may be an issue Yes No N/A GW Elevations Plan - relative to proposed grades (required primarily in areas where GW table may be an issue) Yes No N/A SWMF Landscape Plan(s) Yes No N/A Erosion and Sediment Control Plan(s) Yes No N/A Appendices Pre-Consultation Checklist Yes No N/A Hydrologic Modeling Input Parameters with Supporting Justification (calcs and/or references) Yes No N/A Stage-Storage-Discharge Table for SWMF (include sample equations and outlet characteristics) Yes No N/A Sediment Forebay Sizing Calculations (including Settling / Dispersion Lengths and Cleanout Frequency requirements) Yes No N/A Sizing analysis for all other components of the SWM system - conveyance, stability, etc. Pre-Development Hydrologic Analysis Yes No N/A Post-Development Hydrologic Analysis Yes No N/A Pre-Development Hydraulic Analysis Yes No N/A Post-Development Hydraulic Analysis Yes No N/A Water Balance Analysis Yes No N/A Geotech./Hydrogeo. Report & Plan(s) (may be same as at Preliinary design) - incl. GW contour mapping where GW table may be an issYes No N/A Additional Items and/or Clarification Notes (attach additional information as required) Consultant Team Contact Info: Landowner Contact Info: Checklist Prepared by:: GRCA Contact Info: Date: Checklist Issued: June 24, 2003 Version 1.2

8132 - NPCA SNF Watershed Report.indd - Niagara Peninsula ...
Best Management Practices Brochure - Niagara Peninsula ...
Title Page, Partners, Abstract - Niagara Peninsula Conservation ...
Wetland Characteristics - Niagara Peninsula Conservation Authority
Buffer Brochure - Niagara Peninsula Conservation Authority
2006 AnnuAl REPORT - Niagara Peninsula Conservation Authority
Naturalization Brochure - Niagara Peninsula Conservation Authority
9103 NPCA Conservation Area Booklet 2009.indd - Niagara ...
15-16-18 Mile Creek - Niagara Peninsula Conservation Authority
Stormwater Management Standards Manual - Toledo Metropolitan ...
Land Use Planning & Review Policy - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
Agenda - Niagara Peninsula Conservation Authority
Agenda - Niagara Peninsula Conservation Authority
Binbrook Waterfowl Hunt Lottery Form - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
Lake Erie North Shore Watershed Plan - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
Appendix B - Stormwater Management Report - Niagara Falls
Hydrologic Function – Groundwater – Quality - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
Minutes - Niagara Peninsula Conservation Authority
Minutes - Niagara Peninsula Conservation Authority
Minutes - Niagara Peninsula Conservation Authority
Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...
Minutes - Niagara Peninsula Conservation Authority
Lower Welland River Characterization Report - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
2.0 Watershed Geologic Characterization.pdf - Niagara Peninsula ...
Monitoring & Assessing Marsh Habitat Health - Niagara Peninsula ...