Views
3 years ago

NPCA Stormwater Manual – Appendices - Niagara Peninsula ...

NPCA Stormwater Manual – Appendices - Niagara Peninsula ...

GRCA PRELIMINARY SWM

GRCA PRELIMINARY SWM SUBMISSION CHECKLIST This checklist is intended for use by the Consultant to ensure that all components of a Preliminary SWM submission are included in an effort towards minimizing the time requirements of the review and approval process. Along with the Preconsultation Checklist, this checklist will also serve as a quick reference to GRCA staff that all supporting infomation has been provided, prior to proceeding with a circulation and/or review. It is recognized that the PSWM submission is typically submitted as a component in the Draft Plan Approval process. The user should note that this checklist covers only the SWM aspects of an overall submission and that items such as the Draft Plan itself and any other supporting environmental documentation may also be required. This checklist should be included with the Preliminary SWM submission. The checklist was created in conjunction with the Homebuilders Association/GRCA Liaison Committee and will be updated periodically, with the current version available for download from the GRCA website (www.grandriver.ca). Project Name ID # Main Report Summary Listing of Background Report(s) Yes No N/A SWM Objectives / Criteria Summary Yes No N/A Description of Existing Conditions incl. Topography, Surface Drainage (with Externals), Soils, GW Characteristics Yes No N/A Infiltration - Requirements, Proposed Strategy, Preliminary Results Yes No N/A Water Quality - Requirements, Proposed Strategy, Preliminary Results Yes No N/A Erosion Protection for Receivers - Requirements, Proposed Strategy, Prelimnary Results Yes No N/A Water Quantity - Requirements, Proposed Strategy, Preliminary Results Yes No N/A Summary of Monitoring Programs completed, on-going, or anticipated Yes No N/A Erosion Potential Evaluation and Preliminary Control Strategy Yes No N/A Reports / Plans signed and sealed Yes No N/A Figures / Plans Location Plan Yes No N/A Pre-Development Storm Drainage Boundaries - include existing topographic information Yes No N/A Post-Development Storm Drainage Boundaries - include preliminary drainage / grading information Yes No N/A Schematic Representations of Pre- and Post-Development Hydrologic Models Yes No N/A Preliminary Plans of SWMF's and Outlet Configurations (Plan and Profile) Yes No N/A Preliminary Grading Plan(s) - should include delineation of Constraint Areas and associated Buffers Yes No N/A GW Elevations Plan - relative to preliminary grades (required primarily in areas where GW table may be an issue) Yes No N/A Appendices Pre-Consultation Checklist Yes No N/A Hydrologic Modeling Input Parameters with Supporting Justification (calcs and/or references) Yes No N/A Stage-Storage-Discharge Table for SWMF (include sample equations and outlet characteristics) Yes No N/A Sediment Forebay Sizing Calculations (incl. % of perm. pool area, settling/dispersion lengths, velocity, cleanout frequency requirements) Yes No N/A Pre-Development Hydrologic Analysis Yes No N/A Post-Development Hydrologic Analysis Yes No N/A Pre-Development Hydraulic Analysis Yes No N/A Post-Development Hydraulic Analysis Yes No N/A Water Balance Analysis (Sizing of Infiltration Trenches / Galleries) Yes No N/A Geotechnical / Hydrogeological Report & Plan(s) - include GW contour mapping where GW table may be an issue Yes No N/A Additional Items and/or Clarification Notes (attach additional information as required) Consultant Team Contact Info: Landowner Contact Info: Checklist Prepared by:: GRCA Contact Info: Date: Checklist Issued: June 24, 2003 Version 1.2

APPENDIX L Stormwater Management Planning Flow Chart/Decision Tree

8132 - NPCA SNF Watershed Report.indd - Niagara Peninsula ...
Best Management Practices Brochure - Niagara Peninsula ...
Title Page, Partners, Abstract - Niagara Peninsula Conservation ...
2006 AnnuAl REPORT - Niagara Peninsula Conservation Authority
Buffer Brochure - Niagara Peninsula Conservation Authority
Naturalization Brochure - Niagara Peninsula Conservation Authority
Wetland Characteristics - Niagara Peninsula Conservation Authority
15-16-18 Mile Creek - Niagara Peninsula Conservation Authority
9103 NPCA Conservation Area Booklet 2009.indd - Niagara ...
Stormwater Management Standards Manual - Toledo Metropolitan ...
Land Use Planning & Review Policy - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
Agenda - Niagara Peninsula Conservation Authority
Agenda - Niagara Peninsula Conservation Authority
Lake Erie North Shore Watershed Plan - Niagara Peninsula ...
Binbrook Waterfowl Hunt Lottery Form - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
Agenda - Niagara Peninsula Conservation Authority
Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...
Appendix B - Stormwater Management Report - Niagara Falls
Hydrologic Function – Groundwater – Quality - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
Minutes - Niagara Peninsula Conservation Authority
Minutes - Niagara Peninsula Conservation Authority
Minutes - Niagara Peninsula Conservation Authority
Minutes - Niagara Peninsula Conservation Authority
Lower Welland River Characterization Report - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
2.0 Watershed Geologic Characterization.pdf - Niagara Peninsula ...
Monitoring & Assessing Marsh Habitat Health - Niagara Peninsula ...