Views
3 years ago

NPCA Stormwater Manual – Appendices - Niagara Peninsula ...

NPCA Stormwater Manual – Appendices - Niagara Peninsula ...

DRAFT

DRAFT NPCA SWM POLICIES FLOW CHART Typical Communication Structure within Municipality (Not including outside agency review) Application submitted Parks and Recreation /Leisure Approval is required for any works on park lands, tree preservation plan approvals, landscaping Planning Check conformity to OP, aesthetics, urban design, etc. Public Works Department - Responsible for construction inspection - Subdivision Construction Monitoring - sediment and erosion control (mud matts, dust control, etc.) - Should receive reports from developer on a bi-weekly basis - Monthly basis after construction activities have been completed and as the site stabilizes Building Department Ensures that a lot grading, drainage, servicing site plan is provided for review Application will have the necessary triggers to forward to outside review agencies Comment on Ontario Building Code Engineering - Approval of subdivision engineering drawings - Subdivisions agreement preparation - Site plan review and approval - Approvals of SWM reports & design - Approval of grading and drainage for all building permits - Approval of site alteration permits - Comment on draft plan of subdivision and/or condominium - Monitoring sediment and erosion control - Clear agreement conditions and review lot grading - Process the SWM assumption request & final SWM facility inspection - Review as-built SWM Approve Building permit when all engineering issues have been addressed Forward agreements to Clerk’s Department for council to approve Legal Service Draft agreements 5

APPENDIX M Sample Sediment and Erosion Control Plan

8132 - NPCA SNF Watershed Report.indd - Niagara Peninsula ...
Best Management Practices Brochure - Niagara Peninsula ...
Wetland Characteristics - Niagara Peninsula Conservation Authority
Naturalization Brochure - Niagara Peninsula Conservation Authority
Title Page, Partners, Abstract - Niagara Peninsula Conservation ...
2006 AnnuAl REPORT - Niagara Peninsula Conservation Authority
Buffer Brochure - Niagara Peninsula Conservation Authority
15-16-18 Mile Creek - Niagara Peninsula Conservation Authority
Stormwater Management Standards Manual - Toledo Metropolitan ...
Land Use Planning & Review Policy - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
Agenda - Niagara Peninsula Conservation Authority
Binbrook Waterfowl Hunt Lottery Form - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
Lake Erie North Shore Watershed Plan - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
Agenda - Niagara Peninsula Conservation Authority
Appendix B - Stormwater Management Report - Niagara Falls
Agenda - Niagara Peninsula Conservation Authority
Fort Erie Creeks Watershed Plan - Niagara Peninsula Conservation ...
Hydrologic Function – Groundwater – Quality - Niagara Peninsula ...
Minutes - Niagara Peninsula Conservation Authority
Minutes - Niagara Peninsula Conservation Authority
Minutes - Niagara Peninsula Conservation Authority
Lower Welland River Characterization Report - Niagara Peninsula ...
Agenda - Niagara Peninsula Conservation Authority
Minutes - Niagara Peninsula Conservation Authority
Monitoring & Assessing Marsh Habitat Health - Niagara Peninsula ...
2.0 Watershed Geologic Characterization.pdf - Niagara Peninsula ...
Native Plant Suppliers - Niagara Peninsula Conservation Authority