NPCA Stormwater Manual â Appendices - Niagara Peninsula ...
DRAFT NPCA SWM POLICIES FLOW CHART Typical Communication Structure within Municipality (Not including outside agency review) Application submitted Parks and Recreation /Leisure Approval is required for any works on park lands, tree preservation plan approvals, landscaping Planning Check conformity to OP, aesthetics, urban design, etc. Public Works Department - Responsible for construction inspection - Subdivision Construction Monitoring - sediment and erosion control (mud matts, dust control, etc.) - Should receive reports from developer on a bi-weekly basis - Monthly basis after construction activities have been completed and as the site stabilizes Building Department Ensures that a lot grading, drainage, servicing site plan is provided for review Application will have the necessary triggers to forward to outside review agencies Comment on Ontario Building Code Engineering - Approval of subdivision engineering drawings - Subdivisions agreement preparation - Site plan review and approval - Approvals of SWM reports & design - Approval of grading and drainage for all building permits - Approval of site alteration permits - Comment on draft plan of subdivision and/or condominium - Monitoring sediment and erosion control - Clear agreement conditions and review lot grading - Process the SWM assumption request & final SWM facility inspection - Review as-built SWM Approve Building permit when all engineering issues have been addressed Forward agreements to Clerk’s Department for council to approve Legal Service Draft agreements 5
APPENDIX M Sample Sediment and Erosion Control Plan
APPENDIX A Sample Questionnaire and
4. If you have a SWM manual, was it
Stormwater Management, Erosion and
Summary of Official Plans, SWM Poli
Summary of Official Plans, SWM Poli
APPENDIX C Stormwater Management Po
Town of Grimsby City of Niagara Fal
Appendix D: Summary of Stormwater R
Official Plan Name Date Source Wate
Official Plan Name Date Source Wate
Appendix D: Summary of Stormwater R
Official Plan Name Official Plan De
Official Plan Name Official Plan De
APPENDIX E Committee Meeting Minute
Project: 2 of 3 TSH No. - Subwaters
Project: NPCA SWM Policy TSH No. 54
Project: NPCA SWM Policies - 3 - TS
Project: NPCA SWM Policies - 5 - TS
Project: NPCA SWM Policy TSH No. 54
Project: NPCA SWM Policies - 3 - TS
North American Datum 1983, Universa
North American Datum 1983, Universa
Stormwater Management, Erosion and
Stormwater Management, Erosion and
Stormwater Management, Erosion and
Stormwater Management, Erosion and
Stormwater Management, Erosion and
Stormwater Management, Erosion and
APPENDIX S Niagara Peninsula Conser
Common Plant Name (Latin Name for o
Common Plant Name (Latin Name for o
Stormwater Management, Erosion and
Stormwater Management, Erosion and