Views
3 years ago

Niagara River Remedial Action Plan Stage 2 Update Report

Niagara River Remedial Action Plan Stage 2 Update Report

5.2 New RAP

5.2 New RAP Implementation Framework In Annex 1 of the 2007 Canada-Ontario Agreement, Goal #2 states: “Make significant progress towards Remedial Action Plan (RAP) implementation, environmental recovery and restoration of beneficial uses in the remaining eleven AOCs.” 117 To facilitate implementation of the RAP in light of the 2007 COA, and to reflect the changes and progress in the RAP, a new RAP Implementation Framework is being established. Below is an overview of each of the components of the new RAP Implementation Framework: The Niagara River RAP Coordinator will continue to provide the primary role in coordination of RAP responsibilities as outlined in the agreement with the RAP funding agencies. Through its network in the community, the RAP Coordinator will also provide a direct link to the community at large and facilitate public input. Community Liaison Committees will be struck as required. For example, a Community Liaison Committee was established in 2007 to participate in the decision-making for remediation of contaminated sediments in Lyons Creek East. RAP Coordinating Committee The Niagara River (Ontario) RAP Coordinating Committee is comprised of the RAP lead agencies (MOE, EC, MNR, NPCA) and the RAP Coordinator. The Committee will continue to provide the main coordination and oversight function for the RAP. RAP Implementation Committee The RAP Implementation Committee met initially in November 2008 and is comprised of the RAP Coordinating Committee members and other local stakeholders responsible for implementing actions in the RAP Work Plan. The RAP Implementation Committee will report on progress in the RAP Work Plan on a regular basis (see Appendix 2). RAP Science Committee The RAP Science Committee, established in August 2007, receives direction from, and provides information to, the RAP Coordinating Committee. The Science Committee oversees the monitoring and assessment projects (summarized in Table 22). The committee also provides a link to the NRTMP, through which research and monitoring activities providing technical data and progress in reductions of toxics loadings to the river are reported (see Appendix 5). Special Focus Groups within the AOC (created to address specific AOC issues and will be disbanded when the issue is addressed): Lyons Creek East Technical Advisory Group The Lyons Creek East Technical Advisory Group was set up to examine the Lyons Creek East contaminated sediment site (within the Niagara River AOC) and develop a recommended mitigation/ management approach. This group is comprised of technical experts from MOE, EC, NPCA, consultants, the City of Welland, the Niagara Region, Transport Canada and OMNR. 117 Canada-Ontario Agreement Respecting the Great Lakes Basin Ecosystem 2007. 80

Niagara river remedial action plan stage 2 update Welland River Eutrophication Study Technical Working Group The Welland River Eutrophication Study Technical Working Group was established to examine the response of the Welland River to nutrients and develop a recommended mitigation/management approach (which will include development of delisting criteria). This group is comprised of technical experts from MOE, EC, NPCA, the City of Welland and the Niagara Region. Public Advisory Committee Liaison Committees with the public will be established on an issue by issue basis as required. 81

Site Management Plan Stage 2 Major Remediation Works - Sydney ...
Annual Report, Year 2 (2006) - Pecos River WPP Implementation ...
Lower Welland River Characterization Report - Niagara Peninsula ...
Upper Welland River Watershed Plan - Niagara Peninsula ...
Niagara Water Strategy Update and Action Plan November 10, 2010
Site Management Plan Stage 2 Major Remediation Works, Appendix E
Welland River Eutrophication Study – November 2010
Proposed Remedial Action Plan for Site 5 Groundwater (OU 2 ...
FINAL Remedial Action Management Plan Work Plan
Remedial Action Plan - Main Report - Planning - NSW Government
Environmental Remedial Action Plan - Cushwakelandfl.com
Site Management Plan Stage 2 Major Remediation Works, Appendix D
Proposed Plan, Interim Remedial Action ... - Lockheed Martin
Site Management Plan Stage 2 Major Remediation Works, Appendix B
Remedial Action Plan - Rochford Field - Newhall Remediation Project
REMEDIAL ACTION PLAN SUBSURFACE GAS ... - laschools.org
REMEDIAL ACTION WORK PLAN OPERABLE UNIT 2, LANDFILL ...
ea engineering: report: remedial action engineering work plan for ...
2005 Remedial Action Progress Report - Lockheed Martin
Interim Remedial Action Monitoring Report ... - Lockheed Martin
2010 Remedial Action Progress Report - Lockheed Martin
Hazardous Materials Remedial Action Work Plan EBC - NYC.gov
submit Draft Interim Remedial Action Report for Area C Groundwater
CD11: 3/2/2001: REMEDIATION ASSESSMENT REPORT ...
Duck Creek Implementation Plan - River Action
remedy selection plan for j-2 range - Impact Area Groundwater ...
Interim Remedial Action Work Plan - Freedom Industries - VRP 15017 - 11-2015
Action Plan for the Klamath River Total Maximum Daily Loads
Draft LCP OU-2 Remedial Design Report - New York State ...