Niagara River Remedial Action Plan Stage 2 Update Report

Niagara River Remedial Action Plan Stage 2 Update Report

Wetland Habitat

Wetland Habitat (Hectares) Fiscal year (date) Total completed to date ** (ha) Achieved during fiscal year (ha) 1994/95 0.54 0.54 1995/96 3.9 3.4 1996/97 15.2 11.3 1997/98 32.6 17.4 1998/99 44.3 11.7 1999/00 58.5 14.2 2000/01 64.6 6.1 2001/02 68.3 3.7 2002/03 87.9 19.6 2003/04 109.0 21.1 2004/05 124.7 15.7 2005/06 127.2 2.6 2006/07 139.0 11.8 2007/08 143.0 4.0 2008/09 147.0 6.4 Riparian Habitat (Kilometres) Fiscal year (date) Total completed to date ** (km) Achieved during fiscal year (km) 1994/95 0.27 0.27 1995/96 2.0 1.7 1996/97 7.6 5.6 1997/98 16.3 8.7 1998/99 22.1 5.8 1999/00 28.5 6.4 2000/01 28.9 0.41 2001/02 31.2 2.3 2002/03 42.4 11.4 2003/04 46.4 4.0 2004/05 49.4 3.0 2005/06 50.5 1.1 2006/07 51.6 1.1 2007/08 52.6 1.0 2008/09 53.6 0.32 (Note: the numbers in this graph are calculated by individually measuring each side of the water corridor) 110

Niagara river remedial action plan stage 2 update Delisting Criteria for the percentage of wetland cover and riparian buffers will be reached in the Niagara River AOC when the AOC subwatersheds are not significantly different in comparison to suitable non-AOC reference watersheds. Note - See the executive summary in this report for the recommended delisting criteria for the Niagara River (Ontario) AOC. In the Niagara River AOC, priority subwatersheds for forest, wetland and riparian improvements include: Buckhorn Creek, Elsie Creek, Welland River West, Little Forks Creek and Big Forks Creek. ForestHabitat (Hectares) Fiscal year (date) Total completed to date ** (ha) Achieved during fiscal year (ha) 1995/96 3.9 3.9 1996/97 13.8 9.8 1997/98 32.4 18.6 1998/99 45.9 13.5 1999/00 80.7 34.8 2000/01 83.9 3.2 2001/02 119.6 35.7 2002/03 166.2 46.6 2003/04 193.8 27.6 2004/05 231.4 37.6 2005/06 256.4 25.0 2006/07 281.6 25.2 2007/08 310.3 28.7 2008/09 338.3 19.0 Similarly, for forest cover, delisting criteria will be reached in the Niagara River AOC when the AOC subwatersheds are not significantly different in comparison to suitable non-AOC reference watersheds. In the Niagara River AOC, Oswego Creek and Sucker Creek are priority subwatersheds for reforestation and riparian improvements. Land Care Niagara 168 , in partnership with the Ontario Ministry of Natural Resources – Ontario Stewardship, provides information and natural resource stewardship services to the citizens of Niagara through various programs, one of which is the Niagara Natural Heritage Corridor Tree Planting Program. 168 www.landcareniagara.com 111

Site Management Plan Stage 2 Major Remediation Works - Sydney ...
Annual Report, Year 2 (2006) - Pecos River WPP Implementation ...
Lower Welland River Characterization Report - Niagara Peninsula ...
Upper Welland River Watershed Plan - Niagara Peninsula ...
Niagara Water Strategy Update and Action Plan November 10, 2010
Site Management Plan Stage 2 Major Remediation Works, Appendix E
Welland River Eutrophication Study – November 2010
Proposed Remedial Action Plan for Site 5 Groundwater (OU 2 ...
Environmental Remedial Action Plan - Cushwakelandfl.com
Remedial Action Plan - Main Report - Planning - NSW Government
FINAL Remedial Action Management Plan Work Plan
Site Management Plan Stage 2 Major Remediation Works, Appendix D
Site Management Plan Stage 2 Major Remediation Works, Appendix B
Remedial Action Plan - Rochford Field - Newhall Remediation Project
Proposed Plan, Interim Remedial Action ... - Lockheed Martin
REMEDIAL ACTION PLAN SUBSURFACE GAS ... - laschools.org
REMEDIAL ACTION WORK PLAN OPERABLE UNIT 2, LANDFILL ...
ea engineering: report: remedial action engineering work plan for ...
2005 Remedial Action Progress Report - Lockheed Martin
Interim Remedial Action Monitoring Report ... - Lockheed Martin
2010 Remedial Action Progress Report - Lockheed Martin
Hazardous Materials Remedial Action Work Plan EBC - NYC.gov
Duck Creek Implementation Plan - River Action
submit Draft Interim Remedial Action Report for Area C Groundwater
CD11: 3/2/2001: REMEDIATION ASSESSMENT REPORT ...
remedy selection plan for j-2 range - Impact Area Groundwater ...
Interim Remedial Action Work Plan - Freedom Industries - VRP 15017 - 11-2015
Draft LCP OU-2 Remedial Design Report - New York State ...
Action Plan for the Klamath River Total Maximum Daily Loads