Views
3 years ago

Niagara River Remedial Action Plan Stage 2 Update Report

Niagara River Remedial Action Plan Stage 2 Update Report

8) Eutrophication or

8) Eutrophication or Undesirable Algae 9) Restrictions on Drinking Water Consumption or Taste and Odour Problems (Note: Delisting criteria will be developed and directed by the results of the Eutrophication Study.) 10) Beach Closings 12. Public beaches meet the following conditions: i) Prominent sources of fecal pollution that could contaminate beach or recreational waters are known; ii) Less than 20% of the geometric means of water samples collected over the swimming season exceed the Provincial Water Quality Objectives (100 E. coli* /100ml), or is similar to a suitable non-AOC reference site, when assessed over a period of at least three to five years; iii) Any severe exceedance of Provincial Water Quality Objectives is rare and predictably associated with local events such as significant rainfall events. 11) Degradation of Aesthetics 12) Added Costs to Agriculture or Industry * - Escherichia coli Impaired Not Impaired Impaired Not Impaired Not Impaired Status unchanged – See Stage 2 update section 3.7 for the evaluation xiii

Niagara river remedial action plan stage 2 update 13) Degradation of Phytoplankton and Zooplankton Populations 14) Loss of Fish and Wildlife Habitat (Note: A delisting criteria will be developed if this BUI is shown to be Impaired) 13. The percentage by area of wetland cover within the AOC and the percentage by stream length of riparian buffers within the AOC are not significantly different when compared to suitable non-AOC reference sites. 14. 75% of the potential barriers to fish movement (as identified through the Niagara River AOC Fish Barriers Project 2001 – Phase 1 Photo Library) must be removed or remediated restoring access to potential spawning habitat. 15. The percentage of woodland and wetland habitat by area in the AOC, and the percentage of stream length with (at least) a 30m vegetated buffer in the AOC is not significantly different when compared to suitable non-AOC reference sites. 16. The percentage by area of wetland buffers (50, 120 and 240 m width) in the AOC and of core woodland areas (within 100 and 200m of forest edge) in the AOC is not significantly different when compared to suitable non-AOC reference sites. 17. The proximity, patch size, and patch density of key habitat types (forests and wetlands) in the AOC, is not significantly different when compared to suitable non-AOC reference sites. 18. The existing areal extent of unique wildlife habitats (Wainfleet Bog complex, Niagara Gorge) is at least 80% secured and managed for long-term conservation purposes. 19. Approval of Official Plan environmental policies for AOC municipalities that protect and enhance the natural heritage system, in conformity with the applicable Provincial or Regional natural heritage policies. RFA Impaired xiv

Site Management Plan Stage 2 Major Remediation Works - Sydney ...
Annual Report, Year 2 (2006) - Pecos River WPP Implementation ...
Lower Welland River Characterization Report - Niagara Peninsula ...
Upper Welland River Watershed Plan - Niagara Peninsula ...
Niagara Water Strategy Update and Action Plan November 10, 2010
Welland River Eutrophication Study – November 2010
Proposed Remedial Action Plan for Site 5 Groundwater (OU 2 ...
Site Management Plan Stage 2 Major Remediation Works, Appendix E
Environmental Remedial Action Plan - Cushwakelandfl.com
Remedial Action Plan - Main Report - Planning - NSW Government
Site Management Plan Stage 2 Major Remediation Works, Appendix B
Remedial Action Plan - Rochford Field - Newhall Remediation Project
Site Management Plan Stage 2 Major Remediation Works, Appendix D
FINAL Remedial Action Management Plan Work Plan
REMEDIAL ACTION PLAN SUBSURFACE GAS ... - laschools.org
Proposed Plan, Interim Remedial Action ... - Lockheed Martin
2005 Remedial Action Progress Report - Lockheed Martin
ea engineering: report: remedial action engineering work plan for ...
REMEDIAL ACTION WORK PLAN OPERABLE UNIT 2, LANDFILL ...
Interim Remedial Action Monitoring Report ... - Lockheed Martin
2010 Remedial Action Progress Report - Lockheed Martin
Hazardous Materials Remedial Action Work Plan EBC - NYC.gov
Duck Creek Implementation Plan - River Action
submit Draft Interim Remedial Action Report for Area C Groundwater
CD11: 3/2/2001: REMEDIATION ASSESSMENT REPORT ...
remedy selection plan for j-2 range - Impact Area Groundwater ...
Interim Remedial Action Work Plan - Freedom Industries - VRP 15017 - 11-2015
Draft LCP OU-2 Remedial Design Report - New York State ...
Action Plan for the Klamath River Total Maximum Daily Loads