Views
3 years ago

Niagara River Remedial Action Plan Stage 2 Update Report

Niagara River Remedial Action Plan Stage 2 Update Report

Thus,

Thus, Niagara River beaches are: }} Ball Street beach }} Queens Royal Beach Beaches within the Welland River watershed are: }} Binbrook Conservation beach }} Chippawa Conservation beach 2.3 Records of Beach Postings at Public Beaches The following are based on data from the Niagara Regional and City of Hamilton Health Units. The total number of days that individual beaches were posted for the period 1989-1994 and 1995-2005 (figures 2 and 3) and the total number of postings per year (figures 4 and 5) for Niagara River and Welland watershed beaches are shown below. The periods 1989-1994 and 1995-2005 are shown separately because of differences in sampling protocol and fecal bacterial indicator used. The MOHLTC sampling protocol changed in 1994 from sampling fecal coliforms to sampling for E. coli, and in addition to a new indicator, sampling frequency may have increased at some beaches as a result of the new protocol. During the 1990s, the Glanbrook Conservation Committee carried out a number of efforts to reduce bacterial contamination and algal blooms at Binbrook Reservoir which has likely led to the reduction in beach postings at that site. Figure 2: Total number of days during the swimming season that public beaches on the Ontario side of the Niagara River were posted during the periods 1989-1994 and 1995-2005. Note that Ball Street beach has only been monitored since 1999 by the Niagara Regional Health Unit. 166

Niagara river remedial action plan stage 2 update Figure 3: Total number of days during the swimming season that public beaches in the Welland River watershed were posted during the periods 1989-1994 and 1995-2005. Figure 4: Total number of days per year that public beaches were posted on the Ontario side of the Niagara River. Note that Ball Street beach has only been monitored since 1999 by the Niagara Regional Health Unit. Figure 5: Total number of days per year that public beaches were posted in the Welland River watershed. 167

  • Page 1 and 2:

    Niagara River Remedial Action Plan

  • Page 4 and 5:

    Above the River On the occasion of

  • Page 6 and 7:

    Acronyms AGNPS AOC BUI CAER COA CSO

  • Page 8 and 9:

    Issues identified in the Niagara Ri

  • Page 10 and 11:

    Review of the Stage 2 Report Since

  • Page 12 and 13:

    3) What remains to be done? It was

  • Page 14 and 15:

    3) Degradation of Fish & Wildlife P

  • Page 16 and 17:

    8) Eutrophication or Undesirable Al

  • Page 18 and 19:

    Sommaire On compte autour des Grand

  • Page 20 and 21:

    SECTEUR PRÉOCCUPANT (SP) DE LA RIV

  • Page 22 and 23:

    2) Établissement d’un calendrier

  • Page 24 and 25:

    Table 2: Critères régissant le re

  • Page 26 and 27:

    5) Déformations ou problèmes de r

  • Page 28 and 29:

    xxv 17. La proximité, la dimension

  • Page 30 and 31:

    List of Tables Table 1: Delisting C

  • Page 32 and 33:

    List of Appendices Appendix 1: Tech

  • Page 34 and 35:

    Area of Concern means a geographic

  • Page 36 and 37:

    Quick Facts about the Niagara River

  • Page 38 and 39:

    1.3 Brief overview of the Niagara R

  • Page 40 and 41:

    Table 4 below shows the sources of

  • Page 42 and 43:

    What is COA? The Canada-Ontario Agr

  • Page 44 and 45:

    2.0 REVIEW THE GOALS OF THE NIAGARA

  • Page 46 and 47:

    Table 6: Summary of Theme Categorie

  • Page 48 and 49:

    2.2 Review of the Recommendations a

  • Page 50 and 51:

    High Rate Treatment Facility in Nia

  • Page 52 and 53:

    Eutrophication is a term used to de

  • Page 54 and 55:

    In addition to the NPCA, many other

  • Page 56 and 57:

    Table 8: Niagara AOC Contaminated S

  • Page 58 and 59:

    Lyons Creek West Figure 8: Lyons Cr

  • Page 60 and 61:

    In June 2007, as part of the sedime

  • Page 62 and 63:

    and others stakeholders, has been p

  • Page 64 and 65:

    Liaison with Niagara Region (Niagar

  • Page 66 and 67:

    2.2.6 Surveillance and Monitoring 1

  • Page 68 and 69:

    2.2.7 Outreach and Education 1995 R

  • Page 70 and 71:

    2.2.8 General 1995 Recommendations:

  • Page 72 and 73:

    of the Implementation Annex. Opport

  • Page 74 and 75:

    Biota/Habitat/ Land Use Human Healt

  • Page 76 and 77:

    44 Charting a Course to Delisting

  • Page 78 and 79:

    (3) Public Advisory Committee - com

  • Page 80 and 81:

    6. Temporal trends in contaminant l

  • Page 82 and 83:

    16. The percentage by area of wetla

  • Page 84 and 85:

    Thus, a survey was completed for aq

  • Page 86 and 87:

    Snapping Turtles Hatching Success a

  • Page 88 and 89:

    Mink organ indices Other potential

  • Page 90 and 91:

    Table 12: Binbrook Conservation Bea

  • Page 92 and 93:

    This review concludes that of the 4

  • Page 94 and 95:

    Figure 21: Performance of individua

  • Page 96 and 97:

    Consequently, the Niagara River RAP

  • Page 98 and 99:

    The study found that the number of

  • Page 100 and 101:

    Colonial Waterbird survey in the Ni

  • Page 102 and 103:

    3.10 Monitoring recommendations Des

  • Page 104 and 105:

    The Big Picture The water of the Ni

  • Page 106 and 107:

    4.0 What Remains to be Done? What e

  • Page 108 and 109:

    All Fish and Wildlife Habitat Fish

  • Page 110 and 111:

    5.1 Implementation As part of the r

  • Page 112 and 113:

    5.2 New RAP Implementation Framewor

  • Page 114 and 115:

    Appendix 1: Technical Reviewers Fro

  • Page 116 and 117:

    Ontario Ministry of Agriculture, Fo

  • Page 118 and 119:

    Appendix 4: A Brief History of Poll

  • Page 120 and 121:

    Below is a summary of RAP highlight

  • Page 122 and 123:

    2009 }} Presentation for comments a

  • Page 124 and 125:

    Results show that statistically sig

  • Page 126 and 127:

    Appendix 6: Influences on the Niaga

  • Page 128 and 129:

    2000: The Niagara River RAP Impleme

  • Page 130 and 131:

    In 2005, the Niagara Region began d

  • Page 132 and 133:

    2004: Canadian Environmental Protec

  • Page 134 and 135:

    2005: Provincial Policy Statement T

  • Page 136 and 137:

    Appendix 7: Pollution Prevention an

  • Page 138 and 139:

    The new Central PS/HRT has a capaci

  • Page 140 and 141:

    McLeod Rd. Sewage Pumping Station a

  • Page 142 and 143:

    Wetland Habitat (Hectares) Fiscal y

  • Page 144 and 145:

    NOTE: Details in this appendix were

  • Page 146 and 147:

    4. The Region of Niagara continue t

  • Page 148 and 149: This Recommendation can be identifi
  • Page 150 and 151: This Recommendation should be revis
  • Page 152 and 153: The NPCA’s Natural Heritage Areas
  • Page 154 and 155: This recommendation is ongoing thro
  • Page 156 and 157: This recommendation is vague and sh
  • Page 158 and 159: Suggested Revised Recommendations W
  • Page 160 and 161: Appendix 11: Public Outreach and St
  • Page 162 and 163: The Niagara River Toxics Management
  • Page 164 and 165: Stage 2 Update Consultation Activit
  • Page 166 and 167: The Implementation Committee The Im
  • Page 168 and 169: }} Completion of a new work plan fo
  • Page 170 and 171: 3) Degradation of fish & wildlife p
  • Page 172 and 173: 7) Restrictions on Dredging Activit
  • Page 174 and 175: Rationale for the Recommended Revis
  • Page 176 and 177: 7) Beneficial Use Impairment: Restr
  • Page 178 and 179: Appendix 13: Restrictions on Wildli
  • Page 180 and 181: An internet search and review of ex
  • Page 182 and 183: AOC, is also shown. Concentrations
  • Page 184 and 185: 3.0 Current Status of the Impairmen
  • Page 186 and 187: Golder Associates. 2005. Niagara Ri
  • Page 188 and 189: 1.1 Sentinel Species for Evaluating
  • Page 190 and 191: 2.1.3 Contaminants in Mink (source
  • Page 192 and 193: 6.0 References Fernie, K. and S. de
  • Page 194 and 195: Appendix 16: Beach Closings Technic
  • Page 196 and 197: Table 1: Location of current and hi
  • Page 200 and 201: They carried out the following acti
  • Page 202 and 203: Conservation beach. It is less clea
  • Page 204 and 205: }} Currently, there are no toxic ch
  • Page 206: Our Plaque on the Niagara River In
Site Management Plan Stage 2 Major Remediation Works - Sydney ...
Annual Report, Year 2 (2006) - Pecos River WPP Implementation ...
Lower Welland River Characterization Report - Niagara Peninsula ...
Upper Welland River Watershed Plan - Niagara Peninsula ...
Niagara Water Strategy Update and Action Plan November 10, 2010
Welland River Eutrophication Study – November 2010
Site Management Plan Stage 2 Major Remediation Works, Appendix E
Proposed Remedial Action Plan for Site 5 Groundwater (OU 2 ...
Environmental Remedial Action Plan - Cushwakelandfl.com
Remedial Action Plan - Main Report - Planning - NSW Government
FINAL Remedial Action Management Plan Work Plan
Remedial Action Plan - Rochford Field - Newhall Remediation Project
Site Management Plan Stage 2 Major Remediation Works, Appendix B
Site Management Plan Stage 2 Major Remediation Works, Appendix D
Proposed Plan, Interim Remedial Action ... - Lockheed Martin
REMEDIAL ACTION PLAN SUBSURFACE GAS ... - laschools.org
ea engineering: report: remedial action engineering work plan for ...
REMEDIAL ACTION WORK PLAN OPERABLE UNIT 2, LANDFILL ...
2005 Remedial Action Progress Report - Lockheed Martin
Interim Remedial Action Monitoring Report ... - Lockheed Martin
2010 Remedial Action Progress Report - Lockheed Martin
Hazardous Materials Remedial Action Work Plan EBC - NYC.gov
Duck Creek Implementation Plan - River Action
submit Draft Interim Remedial Action Report for Area C Groundwater
CD11: 3/2/2001: REMEDIATION ASSESSMENT REPORT ...
remedy selection plan for j-2 range - Impact Area Groundwater ...
Interim Remedial Action Work Plan - Freedom Industries - VRP 15017 - 11-2015
Draft LCP OU-2 Remedial Design Report - New York State ...
Action Plan for the Klamath River Total Maximum Daily Loads