REQUEST FOR PROPOSALS PIN Project Submission Deadline MICHAEL R. BLOOMBERG Mayor DAVID J. BURNEY, FAIA Commissioner ERIC MACFARLANE, PE Deputy Commissioner Division of Infrastructure

  • Page 2 and 3: DEPARTMENT OF DESIGN AND CONSTRUCTI
  • Page 4 and 5: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 6 and 7: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 8 and 9: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 10 and 11: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 12 and 13: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 14 and 15: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 16 and 17: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 18 and 19: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 20 and 21: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 22 and 23: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 24 and 25: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 26 and 27: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 28 and 29: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 30 and 31: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 32 and 33: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 34 and 35: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 36 and 37: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 38 and 39: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 40 and 41: PROJECT: HWQ121B3 PIN: 8502013HW006
  • Page 42 and 43: Tax ID # : PIN # : 8502013HW0060P T
  • Page 44 and 45: Tax ID #: PIN #: 8502013HW0060P T
  • Page 46 and 47: PROJECT: HWQ131B3 ATTACHMENT 10 DOI
  • Page 48 and 49: RFP 3
  • Page 50 and 51: RFP 5
  • Page 52 and 53:

    PROJECT: HWQ131B3 PIN: 8502013HW006

  • Page 54 and 55:

    PROJECT: HWQ131B3 PIN: 8502013HW006

  • Page 56 and 57:

    PROJECT: HWQ131B3 PIN: 8502013HW006

  • Page 58 and 59:

    THIS AGREEMENT, made and entered in

  • Page 60 and 61:

    which contracts with the Consultant

  • Page 62 and 63:

    (e) Total estimated amount for all

  • Page 64 and 65:

    (d) Any other professional services

  • Page 66 and 67:

    preliminary materials in any format

  • Page 68 and 69:

    (b) (c) Total number of hours set f

  • Page 70 and 71:

    contract is subject to prior writte

  • Page 72 and 73:

    8.1.1 Certain categories of labor f

  • Page 74 and 75:

    9. Where a Subcontractor Utilizatio

  • Page 76 and 77:

    4. If a Subcontractor Utilization P

  • Page 78 and 79:

    ACKNOWLEDGMENT OF PRINCIPAL IF A CO

  • Page 80 and 81:

    EXHIBIT B SUBCONSULTANTS AND KEY PE

  • Page 82 and 83:

    EXHIBIT D FEE SCHEDULE The Fee Sche

  • Page 84 and 85:

    EXHIBIT F: MINIMUM REQUIREMENTS PER

  • Page 86 and 87:

    (a) Certified Industrial Hygienist

  • Page 88 and 89:

    C. OBJECTIVES: The project HWQ121B3

  • Page 90 and 91:

    TASK 18: Construction Staging and M

  • Page 92 and 93:

    FIGURE 3 ____________ _____________

  • Page 94 and 95:

    FIGURE 5 ____________ _____________

  • Page 96 and 97:

    EXHIBIT H GENERAL REQUIREMENTS FOR

  • Page 98 and 99:

    (NO TEXT ON THIS PAGE) NYC Departme

  • Page 100 and 101:

    GENERAL REQUIREMENTS FOR DESIGN SER

  • Page 102 and 103:

    (e) (f) (g) (h) (i) miles from whic

  • Page 104 and 105:

    L. The Consultant shall thoroughly

  • Page 106 and 107:

    (a) Upon written notice to proceed,

  • Page 108 and 109:

    eview submitted design documents (i

  • Page 110 and 111:

    utility survey documentation; traff

  • Page 112 and 113:

    3. Surface drainage structures and

  • Page 114 and 115:

    Measurement methods, other than ele

  • Page 116 and 117:

    c. The Consultant shall submit to t

  • Page 118 and 119:

    In order to ensure that the electro

  • Page 120 and 121:

    e) Indicate all existing lane delin

  • Page 122 and 123:

    iv) Make reasonable attempts to suf

  • Page 124 and 125:

    2. Sub-cellar/sub-basement vaults s

  • Page 126 and 127:

    e) The Consultant shall reconcile o

  • Page 128 and 129:

    j) The Consultant shall identify al

  • Page 130 and 131:

    g) Coordinating with property owner

  • Page 132 and 133:

    11. The Consultant shall prepare a

  • Page 134 and 135:

    through the use of CCOs. In additio

  • Page 136 and 137:

    under the ensuing construction cont

  • Page 138 and 139:

    B. SEWER DATA SURVEY 1. The Consult

  • Page 140 and 141:

    e) Include the streets, parkways an

  • Page 142 and 143:

    3. PHASE I TESTING This may include

  • Page 144 and 145:

    ) Develop/design project curbs in c

  • Page 146 and 147:

    15. Upon completion of the detailed

  • Page 148 and 149:

    NYC Department of Design and Constr

  • Page 150 and 151:

    NYC Department of Design and Constr

  • Page 152 and 153:

    NYC Department of Design and Constr

  • Page 154 and 155:

    8. The Consultant shall prepare a l

  • Page 156 and 157:

    g) Present the proposed tree planti

  • Page 158 and 159:

    p) The Consultant shall prepare Fin

  • Page 160 and 161:

    c) During design, confer and meet w

  • Page 162 and 163:

    ) The Consultant shall determine th

  • Page 164 and 165:

    c) The Consultant shall meet with a

  • Page 166 and 167:

    permits, etc. Additionally, the cen

  • Page 168 and 169:

    4.29 BUILDINGS RESEARCH 1. Under th

  • Page 170 and 171:

    d. The Consultant shall develop con

  • Page 172 and 173:

    (i) The preparation of Preliminary

  • Page 174 and 175:

    (k) The Consultant shall incorporat

  • Page 176 and 177:

    8. Natural resources (Refer to Chap

  • Page 178 and 179:

    In preparing the ULURP application

  • Page 180 and 181:

    6. The Consultant shall notify the

  • Page 182 and 183:

    4.38 DRAINAGE PLAN GRADE IMPACTS AN

  • Page 184 and 185:

    1) Gather and study all available i

  • Page 186 and 187:

    EXHIBIT I M/WBE SUBCONTRACTOR UTILI

  • Page 188 and 189:

    APPENDIX A GENERAL PROVISIONS GOVER

  • Page 190 and 191:

    ARTICLE 8 - PROTECTION OF PERSONS A

  • Page 192 and 193:

    Appendix A (Architects, Engineers a

  • Page 194 and 195:

    Appendix A (Architects, Engineers a

  • Page 196 and 197:

    Appendix A (Architects, Engineers a

  • Page 198 and 199:

    Appendix A (Architects, Engineers a

  • Page 200 and 201:

    Appendix A (Architects, Engineers a

  • Page 202 and 203:

    Appendix A (Architects, Engineers a

  • Page 204 and 205:

    Appendix A (Architects, Engineers a

  • Page 206 and 207:

    Appendix A (Architects, Engineers a

  • Page 208 and 209:

    Appendix A (Architects, Engineers a

  • Page 210 and 211:

    Appendix A (Architects, Engineers a

  • Page 212 and 213:

    Appendix A (Architects, Engineers a

  • Page 214 and 215:

    Appendix A (Architects, Engineers a

  • Page 216 and 217:

    Appendix A (Architects, Engineers a

  • Page 218 and 219:

    Appendix A (Architects, Engineers a

  • Page 220:

    Appendix A (Architects, Engineers a

REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
THE CITY OF NEW YORK - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
PIN - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
MANHATTAN AND BRONX - DDC Document Exchange - NYC.gov
PIN - DDC Document Exchange - NYC.gov
RFP_Eric McFarlane - DDC Document Exchange - NYC.gov
THE CITY OF NEW YORK - DDC Document Exchange - NYC.gov
TSEUQER FOR PROPOSALS - DDC Document Exchange - NYC.gov
PIN - DDC Document Exchange - NYC.gov
RFP_Eric McFarlane - DDC Document Exchange - NYC.gov
PIN - DDC Document Exchange - NYC.gov
RFP_Eric McFarlane - DDC Document Exchange - NYC.gov
RFP_Eric McFarlane - DDC Document Exchange - NYC.gov
RFP_Eric McFarlane - DDC Document Exchange - NYC.gov
RFP_Eric McFarlane - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
REQUEST FOR PROPOSALS - DDC Document Exchange - NYC.gov
Consultant for Design - DDC Document Exchange - NYC.gov