EOQ - PRU Questionnaire - European Organization for Quality
EOQ - PRU Questionnaire - European Organization for Quality
EOQ - PRU Questionnaire - European Organization for Quality
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>EOQ</strong> - <strong>PRU</strong><br />
<strong>PRU</strong> Agent <strong>Questionnaire</strong><br />
<strong>EOQ</strong> - <strong>PRU</strong> <strong>Questionnaire</strong><br />
Applicant <strong>Organization</strong> name:<br />
Address:<br />
Phone number:<br />
e-mail address:<br />
Representative name:<br />
Date of filling-in the questionnaire:<br />
Legend:<br />
CB = personnel certification body<br />
1. Scope of the CB management system Yes No Remarks<br />
- The scope of the management system of the CB is completely defined, by mentioning the<br />
types of certification and the applied competence standards or normative documents?<br />
- Is the CB a legal entity or is a part of a larger legal entity? If the CB is a part of a larger legal<br />
entity, the links with the other parts of the larger organization are clearly defined and demonstrate that<br />
exists no conflict of interest and impartiality risks?<br />
- Is the CB assuring that the activities of bodies related to CB do not compromise the<br />
confidentiality, objectivity and impartiality of its certification?<br />
- Does the CB offer or provide training?<br />
- Is it assured the distinguishment between the certification of persons and any other activities?<br />
1.2 Application/Exclusions<br />
- Are defined and supported by arguments, the possible exclusions of the ISO 9001<br />
requirements of the CB management system?<br />
2. Normative reference<br />
- The policies and procedures of the CB are complying with all applicable regulations and<br />
statutory requirements?<br />
3. Terms and definitions<br />
Document code/edition: <strong>PRU</strong> F10/1 Validity date: 03.12.2007 Page: 1of 12
<strong>EOQ</strong> - <strong>PRU</strong><br />
<strong>PRU</strong> Agent <strong>Questionnaire</strong><br />
-<br />
4. <strong>Quality</strong> management system<br />
4.1 General requirements<br />
- Has the organization established, documented, implemented a management system in<br />
accordance with the requirements of ISO 9001 and 17024 and is maintaining and improving<br />
continually its effectiveness?<br />
- Are the processes needed <strong>for</strong> the management system and their application throughout the<br />
organization identifiable?<br />
- Are the sequence and interaction of these processes determined?<br />
- Are the criteria and methods determined in order to ensure that both the operation and control<br />
of these processes are effective?<br />
- Is the availability of resources and in<strong>for</strong>mation ensured, necessary to support the operation and<br />
monitoring of these processes?<br />
- Are these processes measured, monitored and analysed?<br />
- Are actions implemented, necessary to achieve planned results and continual improvement of<br />
these processes?<br />
4.2 Documentation requirements<br />
- Does the management system documentation include:<br />
o documented statements of a quality policy and quality objectives?<br />
o a management system manual?<br />
o documented procedures required by the reference International standards?<br />
o documents needed by the organization to ensure the effective planning, operation and control<br />
of its processes?<br />
o records required by the reference International Standards?<br />
- Are there documents available which show the structure to safeguard impartiality including provisions<br />
to assure the impartiality of the operations of the certification body?<br />
- Does the management system manual contain:<br />
- the scope of the management system, including details and justification <strong>for</strong> any exclusions?<br />
- the documented procedures established <strong>for</strong> the management system, or reference to them?<br />
- a description of the interactions between the processes of the management system?<br />
Document code/edition: <strong>PRU</strong> F10/1 Validity date: 03.12.2007 Page: 2of 12
<strong>EOQ</strong> - <strong>PRU</strong><br />
<strong>PRU</strong> Agent <strong>Questionnaire</strong><br />
- Does a documented procedure exist to define the controls needed and required by the ISO<br />
90012000 standard?<br />
- Are required records established and maintained in order to provide evidence of con<strong>for</strong>mity to<br />
requirements and of the effective operation of the management system?<br />
- Does a documented procedure exist in order to define the controls needed <strong>for</strong> the identification,<br />
storage, protection, retrieval, retention time and disposition of records?<br />
- Is the CB maintaining a records system in order to confirm the status of the certified persons and to<br />
demonstrate that the certification process has been effectively fulfilled?<br />
5. Management responsibility<br />
5.1 Management commitment<br />
- Is the top management able to provide evidence of its commitment to the development and<br />
implementation of the management system?<br />
- Is the top management able to provide evidence that the effectiveness of the management<br />
system is continually improved by:<br />
o communicating to the organization the importance of meeting customer as well as statutory<br />
and regulatory requirements?<br />
o establishing the quality policy?<br />
o ensuring that quality objectives are established?<br />
o conducting management reviews, and ensuring the availability of resources?<br />
5.2 Customer orientation<br />
- The policies and procedures of the CB and their administration are showing the fairness and<br />
equitability to all candidates?<br />
5.3 <strong>Quality</strong> policy<br />
Does top management ensure that the quality policy:<br />
- is appropriate to the purpose of the CB?<br />
- includes a commitment to comply with requirements and continually improve the effectiveness<br />
of the management system?<br />
- provides a framework <strong>for</strong> establishing and reviewing quality objectives?<br />
5.4 Planning (objectives)<br />
Does top management ensure that:<br />
Document code/edition: <strong>PRU</strong> F10/1 Validity date: 03.12.2007 Page: 3of 12
<strong>EOQ</strong> - <strong>PRU</strong><br />
<strong>PRU</strong> Agent <strong>Questionnaire</strong><br />
- the planning of the management system is carried out to meet the requirements in clause 4.1<br />
of the standard ISO 9001, as well as the quality objectives?<br />
- the integrity of the management system is maintained when changes to the quality<br />
management system are planned and implemented?<br />
5.5 Responsibility, authority and communication<br />
- Is the CB assure the independency, impartiality, ethical operations, in relation to its applicants?<br />
- Is the CB assuring its responsibilities to the granting, maintaining, renewing, expanding and<br />
reducing the scope, or suspending and withdrawing the certification<br />
- Are defined the CB management structures, competency requirements and responsibilities <strong>for</strong>:<br />
o the evaluation, certification and surveillance<br />
o the <strong>for</strong>mulation of policies relating to the operation of the CB<br />
o implementation of the policies and procedures<br />
o the finances of the certification body, and<br />
o the delegation of authority to any committees or individuals to undertake defined activities on<br />
its behalf<br />
- Is a scheme committee appointed, which is responsible <strong>for</strong> the development and maintenance<br />
of the certification scheme <strong>for</strong> each type of certification being considered?<br />
- How does the scheme committee represent the interests of all parties concerned with the<br />
certification scheme?<br />
- In which documented instructions are described the duties and responsibilities of the employed<br />
or contracted persons and how are they communicated to all those involved? Are these documents<br />
kept up-to-date?<br />
- Did top management appoint a member of management who, irrespective of other<br />
responsibilities, shall have responsibility and authority that includes:<br />
o ensuring that processes needed <strong>for</strong> the quality management system are established,<br />
implemented and maintained?<br />
o reporting to top management on the per<strong>for</strong>mance of the quality management system and any<br />
need <strong>for</strong> improvement?<br />
o ensuring the promotion of awareness of customer requirements throughout the organization?<br />
- Does top management ensure that appropriate communication processes are established<br />
within the organization and that communication takes place regarding the effectiveness of the<br />
management system?<br />
Document code/edition: <strong>PRU</strong> F10/1 Validity date: 03.12.2007 Page: 4of 12
<strong>EOQ</strong> - <strong>PRU</strong><br />
<strong>PRU</strong> Agent <strong>Questionnaire</strong><br />
5.6 Management review<br />
- Does top management review the CB’s management system, at planned intervals, to ensure<br />
its continuing suitability, adequacy and effectiveness?<br />
- Does this review include assessing opportunities <strong>for</strong> improvement and the need <strong>for</strong> changes to<br />
the management system, including the quality policy and quality objectives?<br />
- Are records from management reviews maintained?<br />
- Does the input to management review include all in<strong>for</strong>mation required by the ISO 9001:2000<br />
standard?<br />
- Does the output of the management review include any decisions and actions related to:<br />
o improvement of the effectiveness of the quality management system and its processes ?<br />
o improvement of product related to customer requirements?<br />
o resource needs?<br />
6. Resource management<br />
6.1 Provision of resources<br />
- Does the CB determine and provide the resources needed:<br />
o to implement and maintain the management system and continually improve its effectiveness ?<br />
o to enhance customer satisfaction by meeting customer requirements?<br />
- Are ensured the necessary financial resources <strong>for</strong> the operation of a certification system and to<br />
cover associated liabilities?<br />
- Are there available data to demonstrated the financial viability of the CB?<br />
6.2 Human resources<br />
- Does the CB define the needed education, training, technical knowledge and experience <strong>for</strong> all<br />
personnel who are acting in certification functions?<br />
- Is the CB managing and controlling the suitability of all the staff it uses in particular areas,<br />
whether they are employees, employed on contract or provided by external bodies?<br />
- Are established and defined the competence requirements <strong>for</strong> the employed or contracted<br />
persons involved in the certification process (<strong>for</strong> activities as applications review, authorizing and<br />
selecting examiners, preparing, administering, monitoring, grading and evaluating examinations,<br />
assessing subcontractors, handling noncon<strong>for</strong>mities, appeals and complaints, deciding on certification,<br />
implementing and maintaining the management system)?<br />
Document code/edition: <strong>PRU</strong> F10/1 Validity date: 03.12.2007 Page: 5of 12
<strong>EOQ</strong> - <strong>PRU</strong><br />
<strong>PRU</strong> Agent <strong>Questionnaire</strong><br />
- Are the employed or contracted persons sign a document by which they commit themselves to<br />
comply with the rules defined by the certification body, including those relating to confidentiality,<br />
independence and impartiality?<br />
- Do the personnel being active in any aspect of certification activities have the appropriate<br />
education, experience and technical expertise which satisfy the defined competence criteria?<br />
- The person(s) deciding on granting/withdrawing of certificates within the CB, have a level of<br />
knowledge and experience sufficient to evaluate the in<strong>for</strong>mation obtained from the certification<br />
process?<br />
- Has the CB established and implemented a system that identifies and documents the training<br />
needs of personnel and how those training needs are met (training effectiveness evaluation)?<br />
- Is the CB maintaining current documentation on the relevant qualifications of each individual<br />
involved in certification activities, containing data required by the ISO 17024 standard?<br />
- Are all the CB examiners meeting the competence requirements of the CB, defined in<br />
accordance with the requirements of ISO 17024 standard?<br />
- These criteria are always used <strong>for</strong> the selection of the examiners?<br />
- Is the CB assessing and monitoring the conduct and per<strong>for</strong>mance of the examiners?<br />
- The personnel who is monitoring the conduct of examinations is distinct from the examiners<br />
and is meeting the criteria defined by the CB?<br />
6.3 Infrastructure<br />
- Does the CB determine and manage the work environment needed to achieve con<strong>for</strong>mity to<br />
the personnel certification schemes?<br />
6.4 Work environment<br />
- Does the CB determine and implement necessary measures to ensure security throughout the<br />
certification system, including arrangements <strong>for</strong> the transport and handling of examination material?<br />
- Has the CB defined and is implementing procedures <strong>for</strong> separation between examination<br />
materials and training materials, <strong>for</strong> eliminating the risk of compromising impartiality and/or security?<br />
7. Product/service realisation<br />
7.1 Planning of product/service realization<br />
- Does the CB plan and develop the processes needed <strong>for</strong> the personnel certification<br />
realization?<br />
- Is this planning consistent with the requirements of the other processes of the quality<br />
management system?<br />
Document code/edition: <strong>PRU</strong> F10/1 Validity date: 03.12.2007 Page: 6of 12
<strong>EOQ</strong> - <strong>PRU</strong><br />
<strong>PRU</strong> Agent <strong>Questionnaire</strong><br />
- Are the examinations planned and structured in order to ensure that all scheme requirements<br />
are objectively and systematically verified, to produce sufficient documented evidence to confirm the<br />
competence of the candidate?<br />
7.2 Customer related process<br />
- The procedures of the CB are not impeding or inhibiting the access by applicants and<br />
candidates? If there are any exceptions, are they defined?<br />
- If there are any changes in the requirements <strong>for</strong> certification, how are in<strong>for</strong>med all interested<br />
parties and the certified persons?<br />
- Is ensured the non-restriction of certification on the grounds of financial or other limiting<br />
conditions?<br />
- Is the CB providing to all interested parties, current detailed description of the certification<br />
process <strong>for</strong> each certification scheme and the requirements <strong>for</strong> certification, the applicants rights and<br />
the duties of the certified persons (including where appropriate, a code of conduct)?<br />
- Are the certification applicants completing an application containing all in<strong>for</strong>mation required by<br />
this standard?<br />
- Does the CB review the candidates’ application to confirm that:<br />
o the certification body has the capability to deliver the requested certification,<br />
o the certification body is aware of and can, within reason, accommodate any special needs of<br />
applicants, such as language and/or disabilities, and<br />
o the applicant has the required education, experience and training specified by the scheme.<br />
- Is communicated and assured that the certification body is the owner of the issued certificates?<br />
- Is the CB providing to the certificate holders any certification marks or logos?<br />
- The CB is ensuring that all interested parties are made aware, as and when appropriate, of the<br />
existence of the appeals/complaints process and the procedures to be followed?<br />
7.3 Design and development<br />
- Is defined and described a process <strong>for</strong> the development and maintenance of certification<br />
schemes, including the review and validation of the schemes, by the scheme committee?<br />
Document code/edition: <strong>PRU</strong> F10/1 Validity date: 03.12.2007 Page: 7of 12
<strong>EOQ</strong> - <strong>PRU</strong><br />
<strong>PRU</strong> Agent <strong>Questionnaire</strong><br />
- Does the CB determine: the design and development stages, the review, verification and<br />
validation activities that are appropriate to each design and development stage, and the<br />
responsibilities and authorities <strong>for</strong> design and development activities?<br />
- Are maintained corresponding records?<br />
- Are defined the criteria <strong>for</strong> the competence evaluation of persons applying <strong>for</strong> certification?<br />
- The candidates examination methods are evaluated at least annually and corrected, if needed<br />
<strong>for</strong> ensure fairness, validity and reliability of theses methods?<br />
- Did the CB define pro-active surveillance procedures (frequency, content of surveillance<br />
activities) to monitor the certified persons’ compliance with the relevant provisions of the certification<br />
requirements, during the validity time period of the certificates?<br />
- Did the CB define adequate re-certification requirements in accordance with the competence<br />
standards and other relevant documents, to ensure that the certified person continues to comply with<br />
the current certification requirements?<br />
- Did the CB define the methods and frequency <strong>for</strong> re-certification, taking into account any<br />
applicable normative criteria and which are appropriate to the purpose of re-certification?<br />
7.4 Purchasing<br />
- Is the CB subcontracting any activities related to certification (e.g. examination) to an external<br />
body or person?<br />
- If yes, has the CB an agreement with the subcontractor, related to the sub-contracted<br />
activities?<br />
- If there are some sub-contracted certification activities, how is ensured, that the subcontractor<br />
is competent and complies with the applicable provisions of the ISO 17024 standard and is not<br />
involved, either directly or through their employer, with training or the maintenance of the certification<br />
of persons in such a way that confidentiality and impartiality could be compromised<br />
- Is the CB maintaining a list of subcontractors and how are the subcontractors assessed and<br />
monitored by the CB?<br />
7.5 Service provision<br />
- Are defined the policies and procedures <strong>for</strong>: granting, maintaining, renewing, expanding and<br />
reducing the scope, suspending and withdrawing of certificates?<br />
- The requirements, evaluations and decisions on certification are relating to the scope of the<br />
desired certification?<br />
Document code/edition: <strong>PRU</strong> F10/1 Validity date: 03.12.2007 Page: 8of 12
<strong>EOQ</strong> - <strong>PRU</strong><br />
<strong>PRU</strong> Agent <strong>Questionnaire</strong><br />
- If the CB is providing also training, how is assured the independency of the evaluation and<br />
certification of persons in relationship to the training activities, to ensure that confidentiality and<br />
impartiality are not compromised?<br />
- Is the CB implementing the policies and procedure related to the per<strong>for</strong>mance of certified<br />
persons?<br />
- Are implemented the methods and procedures <strong>for</strong> the evaluation of the competence of the<br />
certification candidates?<br />
- The pre-requisites, eligibility and other certification requirements are documented, indicating a<br />
fair and equitable relationship with the certification scheme?<br />
- Is verified that each certified person complies with the changed certification requirements?<br />
- The requirement regarding confidentiality is including anyone (sub-contractors, as well) who<br />
might gain access to in<strong>for</strong>mation within the certification body?<br />
- Are defined and maintained policies and procedures <strong>for</strong> the maintenance and release of<br />
in<strong>for</strong>mation?<br />
- Is there any process installed in case an examiner has a potential conflict of interest in the<br />
examination of a candidate?<br />
- Does the CB examine competence, based on the requirements of the scheme, by written, oral,<br />
practical, observational or other means?<br />
- Has the CB defined and adopted reporting procedures, to ensure the documentation of the<br />
per<strong>for</strong>mance and results of the evaluation, including the per<strong>for</strong>mance and results of examinations?<br />
- Did the CB define the quantity and quality of needed in<strong>for</strong>mation, based on which will be made<br />
the decision on certification?<br />
- Has the CB defined who is taking the decision on the certification of a candidate, based on the<br />
in<strong>for</strong>mation gathered during the certification process?<br />
- The person(s) deciding on granting/withdrawing of certificates within the CB are participating in<br />
the examination or training of the candidates?<br />
- The issued certificates are containing at least, the following in<strong>for</strong>mation:<br />
o the name of the certified person and a unique certification number;<br />
o the name of the certification body;<br />
o a reference to the competence standard or other relevant documents, including issue, on which<br />
the certification is based;<br />
o the scope of the certification, including validity conditions and limitations;<br />
o the effective date of certification and date of expiry?<br />
Document code/edition: <strong>PRU</strong> F10/1 Validity date: 03.12.2007 Page: 9of 12
<strong>EOQ</strong> - <strong>PRU</strong><br />
<strong>PRU</strong> Agent <strong>Questionnaire</strong><br />
- Are there objective evidences <strong>for</strong> the implementation of the re-certification process?<br />
- Has the CB documented procedures <strong>for</strong> the use of its mark, to ensure that its certified persons<br />
do not use its mark in a way that may be likely to confuse employers or other parties?<br />
- Did the CB define the content of the agreement to be signed by the certified persons, in<br />
accordance with the requirements of the ISO 17024 standard? Are there available objective<br />
evidences that all certified persons have signed such an agreement?<br />
- Has the CB defined corresponding procedures to ensure that its certified persons do not use its<br />
mark in a way that may be likely to confuse employers or other parties?<br />
8. Measurement, analyses and improvement<br />
8.1 General<br />
- Does the CB plan and implement the monitoring, measurement, analysis and improvement<br />
processes needed, in order to:<br />
o assure con<strong>for</strong>mity of the quality management system?<br />
o continually improve the effectiveness of the quality management system?<br />
8.2 Monitoring and measurement<br />
- Does the CB monitor in<strong>for</strong>mation relating to customer perception as to whether the CB has met<br />
its requirements, as one of the measurements of the per<strong>for</strong>mance of the quality management system?<br />
- Are the methods <strong>for</strong> obtaining and using this in<strong>for</strong>mation determined?<br />
- Does the CB conduct internal audits at planned intervals to determine whether the quality<br />
management system:<br />
o con<strong>for</strong>ms to the planned arrangements, to the requirements of this International Standard and<br />
to the quality management system requirements established by the organisation?<br />
o is effectively implemented and maintained?<br />
- Is an audit programme planned, taking into consideration the status and importance of the<br />
processes and areas to be audited, as well as the results of previous audits?<br />
- Are the audit criteria, scope, frequency and methods defined?<br />
- Do the selection of auditors and the conduct of audits ensure objectivity and impartiality of the<br />
audit process?<br />
- Is it ensured that auditors do not audit their own work?<br />
- Does a documented procedure exist about the responsibilities and requirements <strong>for</strong> planning<br />
and conducting audits, and <strong>for</strong> reporting results and maintaining records?<br />
Document code/edition: <strong>PRU</strong> F10/1 Validity date: 03.12.2007 Page: 10of 12
<strong>EOQ</strong> - <strong>PRU</strong><br />
<strong>PRU</strong> Agent <strong>Questionnaire</strong><br />
- Does the responsible <strong>for</strong> the area being audited ensure that actions are taken without undue<br />
delay to eliminate detected noncon<strong>for</strong>mities and their causes?<br />
- Do follow-up activities include the verification of the actions taken and the reporting of<br />
verification results?<br />
- Is the CB implementing pro-active surveillance procedures to monitor the certified persons’<br />
compliance with the relevant provisions of the certification requirements, during the validity time period<br />
of the certificates?<br />
8.3 Control of non-con<strong>for</strong>ming product<br />
- Is the CB ensuring in a documented manner that appeals and complaints are resolved<br />
independently, in an unbiased manner?<br />
- Has the CB procedures specifying the circumstances and conditions in which certificates will<br />
be withdrawn if competence is not confirmed during surveillance?<br />
- Has the CB procedures to be followed in case of misuse, including false claims as to<br />
certification and false use of its marks (<strong>for</strong> example the suspending or withdrawal of certification)?<br />
8.4 Analysis of data<br />
- Does the CB determine, collect and analyse appropriate data to demonstrate the suitability<br />
and effectiveness of the quality management system and to evaluate where continual improvement of<br />
the effectiveness of the quality management system can be made ?<br />
- Does this include data generated by monitoring and measurement and from other relevant<br />
sources?<br />
- Does the analysis of data provide in<strong>for</strong>mation relating to all corresponding requirements of ISO<br />
9001:2000?<br />
8.5 Improvement<br />
- Does the CB continually improve the effectiveness of the quality management system through<br />
the use of the quality policy, quality objectives, audit results, analysis of data, corrective and<br />
preventive actions and management review?<br />
- Does the organization take action to eliminate the cause of noncon<strong>for</strong>mities in order to prevent<br />
recurrence?<br />
- Are corrective actions appropriate to the impact of the problems encountered?<br />
- Does a documented procedure exist to define requirements <strong>for</strong>:<br />
o reviewing noncon<strong>for</strong>mities (including customer complaints)?<br />
Document code/edition: <strong>PRU</strong> F10/1 Validity date: 03.12.2007 Page: 11of 12
<strong>EOQ</strong> - <strong>PRU</strong><br />
<strong>PRU</strong> Agent <strong>Questionnaire</strong><br />
o determining the causes of noncon<strong>for</strong>mities?<br />
o evaluating the need <strong>for</strong> action to ensure that noncon<strong>for</strong>mities do not recur?<br />
o determining and implementing the action needed?<br />
o records of the results of action taken?<br />
o reviewing corrective action taken?<br />
- Does the organization determine action to eliminate the causes of potential noncon<strong>for</strong>mities in<br />
order to prevent their occurrence?<br />
- Are preventive actions taken appropriate to the effects of the potential problems?<br />
- Does a documented procedure exist to define requirements <strong>for</strong>:<br />
o determining potential noncon<strong>for</strong>mities and their causes?<br />
o evaluating the need <strong>for</strong> action to prevent occurrence of noncon<strong>for</strong>mities?<br />
o determining and implementing action needed?<br />
o records of results of action taken?<br />
o reviewing preventive action taken?<br />
Document code/edition: <strong>PRU</strong> F10/1 Validity date: 03.12.2007 Page: 12of 12