Track Record - Public Transport Victoria
Track Record - Public Transport Victoria
Track Record - Public Transport Victoria
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Track</strong> <strong>Record</strong> Quarterly services bulletin 5<br />
Reliability<br />
The percentage of the timetable delivered across the network remained stable this quarter:<br />
> > metropolitan train reliability is measured as the percentage of the timetable that is delivered.<br />
Non-delivery of services includes cancellations, trains that run short and trains that bypass<br />
the City or Westona loops<br />
> > metropolitan tram reliability is based on the percentage of the timetable delivered. Non delivery<br />
of services includes cancellations and trams that run short<br />
> > metropolitan bus reliability is the percentage of services that operate and are completed<br />
> > regional train reliability is measured as the percentage of scheduled services that are delivered.<br />
Table 2<br />
Train, tram and bus reliability – percentage of timetable delivered<br />
Jul – Sep<br />
2011<br />
Oct – Dec<br />
2011<br />
Jan – Mar<br />
2012<br />
Apr – Jun<br />
2012<br />
Jul – Sep<br />
2012<br />
Metropolitan trains 98.8% 98.4% 98.4% 98.5% 98.5%<br />
Metropolitan trams 99.3% 99.1% 99.0% 99.1% 99.2%<br />
V/Line trains 98.5% 97.6% 97.7% 97.6% 97.2%<br />
Metropolitan buses >99.9% >99.9% >99.9% >99.9% >99.9%<br />
Figure 2<br />
Train, tram and bus reliability – percentage of timetable delivered<br />
100.0<br />
99.5<br />
99.0<br />
98.5<br />
98.0<br />
97.5<br />
97.0<br />
Jul – Sep 2011 Oct – Dec 2011 Jan – Mar 2012 Apr – Jun 2012 Jul – Sep 2012<br />
Metropolitan trains<br />
V/Line trains<br />
Metropolitan trams – average over route<br />
Metropolitan buses