<strong>S33</strong> – <strong>Danube</strong> <strong>bridge</strong> <strong>Traismauer</strong> <strong>contract</strong> <strong>section</strong> <strong>North</strong><br />

Ordering customer :<br />

Contact person:<br />

<strong>Project</strong>:<br />

<strong>Project</strong> area:<br />

Net costs struct. work:<br />

Construction period:<br />

Bureau of Lower Austrian provincial<br />

government<br />

Section ST5 – <strong>bridge</strong> construction<br />

CEng Günther Behon<br />

+43 676 812 60 - 5012<br />

<strong>S33</strong> – Kremser Schnellstraße<br />

<strong>Danube</strong> <strong>bridge</strong> <strong>Traismauer</strong>, <strong>contract</strong> <strong>section</strong><br />

north; junction Jettsdorf to Vorlandbrücke<br />

<strong>North</strong><br />

<strong>S33</strong> Kremser Schnellstraße and S5 Stockerauer<br />

Schnellstraße, Lower Austria<br />

€ 15,7 Mio. (only <strong>bridge</strong> construction)<br />

November 2007 to May 2011 (43 months)<br />

<strong>Project</strong> <strong>details</strong><br />

New construction of the <strong>S33</strong> –Kremser Schnellstraße, <strong>Danube</strong> <strong>bridge</strong> <strong>Traismauer</strong><br />

Contract <strong>section</strong> <strong>North</strong>: junction Jettsdorf (best. S5) to Vorlandbrücke<br />

<strong>North</strong><br />

• length of territorial <strong>section</strong>: ca. 3,5 km<br />

• construction with simultaneous maintenance of the S5 – Stockerauer-<br />

Schnellstraße<br />

• 9 <strong>bridge</strong> objects<br />

• drilled piles, DN 120 cm, 3.325 rm<br />

• bulkhead, 1.000 m2<br />

• area wide impulse compaction as subgrade improvement<br />

Object <strong>S33</strong>.28: <strong>bridge</strong> over the flood opening at Jettsdorf<br />

• 1-field reinforced concrete frame <strong>bridge</strong>, 2 separate lanes<br />

• drilled pile foundation: 360 rm<br />

• open span: 30,00 rm<br />

• length of <strong>bridge</strong>: 43,60 rm<br />

• width of <strong>bridge</strong>: 30,00 rm<br />

Object <strong>S33</strong>.29: <strong>bridge</strong> over the flood opening at Jettsdorf<br />

• 1-field reinforced concrete frame <strong>bridge</strong>, 2 separate lanes<br />

• drilled pile foundation: 360 rm<br />

• open span: 30,00 rm<br />

• length of <strong>bridge</strong>: 43,60 rm<br />

• width of <strong>bridge</strong>: 30,00 rm<br />

Object <strong>S33</strong>.30: <strong>bridge</strong> over the flood opening at Haitzendorf<br />

• 2-field reinforced concrete frame <strong>bridge</strong>, 2 separate lanes<br />

• drilled pile foundation: 370 rm<br />

• open span: 2 x 20,40= 40,80 rm<br />

• length of <strong>bridge</strong>: 55,00 rm<br />

• width of <strong>bridge</strong>: 32,00 rm<br />

page 1 of 2


Object <strong>S33</strong>.31: <strong>bridge</strong> over the Kamp<br />

• 3-field reinforced concrete frame <strong>bridge</strong>, 2 separate lanes<br />

• bondless external post-tensioning<br />

• drilled pile foundation: 800 rm<br />

• open span: 26,35/39, 80/26,35= 92,50 rm<br />

• length of <strong>bridge</strong>: 105 rm<br />

• width of <strong>bridge</strong>: 33,50 rm<br />

Object <strong>S33</strong>,32: <strong>bridge</strong> over flood opening at Haitzendorf<br />

• 2-field reinforced concrete frame <strong>bridge</strong>, 2 separate lanes<br />

• drilled pile foundation: 550 rm<br />

• open span: 2 x 22,40 = 44,80 rm<br />

• length of <strong>bridge</strong>: 59,00 rm<br />

• width of <strong>bridge</strong>: 39,00 rm<br />

Object <strong>S33</strong>.Ü15: over<strong>bridge</strong> over the S5 RFB Vienna<br />

• 3-field reinforced concrete frame <strong>bridge</strong><br />

• area wide impulse compaction as subgrade improvement<br />

• shallow foundation<br />

• open span: 30,35/36, 15/22,08 = 88,58 rm<br />

• length of <strong>bridge</strong>: 128 rm<br />

• width of <strong>bridge</strong>: 15,00 rm<br />

Object S5.Ü17: over<strong>bridge</strong> of the L2193 over the S4 at Jettsdorf<br />

• 1-field reinforced concrete frame <strong>bridge</strong><br />

• construction with simultaneous maintenance of the S5<br />

• drilled pile foundation: 150 rm<br />

• open span: 39,20 rm<br />

• length of <strong>bridge</strong>: 58,60 rm<br />

• width of <strong>bridge</strong>: 9,00 rm<br />

Object S5..Ü18: over<strong>bridge</strong> of ramp 4<br />

• 2-field reinforced concrete frame <strong>bridge</strong><br />

• drilled pile foundation: 310 rm<br />

• open span: 25,00 + 26,50 = 51,50 rm<br />

• length of <strong>bridge</strong>: 75,00 rm<br />

• width of <strong>bridge</strong>: 10,75 rm<br />

Object S5.22: <strong>bridge</strong> over the Mühlkamp<br />

• 2-field reinforced concrete frame <strong>bridge</strong>, 2 separate lanes<br />

• safeguarding measures via bulkhead a. anchorage of the already<br />

existing S5<br />

• drilled pile foundation: 425 rm<br />

• open span: 14,65 + 22,65 = 37,30 rm<br />

• length of <strong>bridge</strong>: 55,00 rm<br />

• width of <strong>bridge</strong>: 41,00 rm<br />

Services<br />

Supporting ÖBA for the bureau of the Lower Austrian provincial government<br />

page 2 of 2