REPUBLIC OF ALBANIA<br />

MINISTRY OF PUBLIC WORKS,<br />

TRANSPORT & TELECOMMUNICATION<br />

MARITIME TRANSPORT INFRASTRUCTURE<br />

PREPARED BY:<br />

Osman METALLA<br />

Director <strong>of</strong> Maritime Transport Policies<br />

March 2006<br />

6/28/2012<br />

1


Albanian ports<br />

• <strong>Port</strong> <strong>of</strong> Shengjini<br />

• <strong>Port</strong> <strong>of</strong> Durres<br />

• <strong>Port</strong> <strong>of</strong> <strong>Vlora</strong><br />

• <strong>Port</strong> <strong>of</strong> Saranda<br />

6/28/2012 2


<strong>Port</strong> infrastructure after ‘90<br />

• Old cranes<br />

• Old technology<br />

• Low output<br />

• Overstaffed<br />

• Outdated methods<br />

for handling ships<br />

• No specialized<br />

terminals in ports<br />

• Poor backup<br />

infrastructure<br />

(roads, railways<br />

etc.)<br />

6/28/2012 3


Poor infrastructure…<br />

6/28/2012 4


Our objectives<br />

• Improve legal framework<br />

• Privatize port services<br />

• Improve port infrastructure<br />

• Improve cargo handling facilities<br />

• Adopt new technologies<br />

• Increase cargo handling capacities<br />

• Improve safety and security <strong>of</strong> ports<br />

• Protect maritime environment from pollution<br />

6/28/2012 5


Studies and projects Durres <strong>Port</strong><br />

• L.G.MOUCHEL – “Master-plan <strong>of</strong> Duress <strong>Port</strong>”<br />

(1994)<br />

• LOUIS BERGER Int.Inc – “Land Use Plan” (2000)<br />

• MOFFAT & NICHOL + WSA – “Container’s<br />

Multimodal Terminal” (2002)<br />

• WILBUR SMITH ASSOCIATES – “Dredging<br />

program and Environmental Assessment Study”<br />

(2002)<br />

6/28/2012 6


Studies and projects other <strong>Port</strong>s<br />

• Master-plan <strong>of</strong> port <strong>of</strong> <strong>Vlora</strong> (Phare<br />

Program), prepared by GIBB<br />

• Master-plan <strong>of</strong> port <strong>of</strong> Shengjini and<br />

Saranda (WB), prepared by Albanian<br />

Institute <strong>of</strong> Transport and NEA<br />

Netherlands<br />

• Development and Management <strong>of</strong><br />

southern Albanian coast (port <strong>of</strong><br />

Saranda included) (WB)<br />

6/28/2012 7


Financed projects - <strong>Port</strong> <strong>of</strong> Shengjini<br />

• Passenger’s terminal - financed by GoA<br />

• Construction <strong>of</strong> west breakwater – financed by GoA<br />

• Construction <strong>of</strong> south breakwater – financed by GoA<br />

• Dredging works – financed by GoA<br />

6/28/2012 8


<strong>Port</strong> <strong>of</strong> Shengjin<br />

Construction works<br />

financed by GoA<br />

6/28/2012 9


Financed projects - <strong>Port</strong> <strong>of</strong> Saranda<br />

• Construction <strong>of</strong> passenger’s terminal –<br />

financed by WB<br />

• Rehabilitation and extension <strong>of</strong> Limioni cargo<br />

wharf financed by GoA<br />

• Construction <strong>of</strong> ferry terminal – financed by<br />

WB<br />

• Construction <strong>of</strong> customs, harbor master and<br />

<strong>Port</strong> Offices<br />

6/28/2012 10


<strong>Port</strong> <strong>of</strong> Saranda<br />

Priority orientation<br />

tourism<br />

6/28/2012 11


Financed projects - <strong>Port</strong> <strong>of</strong> <strong>Vlora</strong><br />

• Implementation <strong>of</strong> Masterplan <strong>of</strong> <strong>Vlora</strong>:<br />

– Construction <strong>of</strong> ferry terminal<br />

– Construction <strong>of</strong> cargo peer<br />

– Construction <strong>of</strong> port superstructure<br />

Overall cost <strong>of</strong> Masterplan 31 Mln Euro.<br />

Italian Cooperation 15,3 Mln Euro<br />

6/28/2012 12


6/28/2012 13<br />

Master plan - <strong>Port</strong> <strong>of</strong> <strong>Vlora</strong><br />

Legend<br />

Key Berth<br />

Land Use Area<br />

Protected Works<br />

Dredging<br />

<strong>Port</strong> Layout<br />

Construction Cost<br />

• 31 mln EUR<br />

Financing<br />

• Italian Cooperation<br />

(15,3 mln Euro)


<strong>Vlora</strong><br />

The southern<br />

gateway <strong>of</strong><br />

Corridor VIII<br />

• Ferry terminal<br />

• Two wharfs for<br />

cargo operations<br />

6/28/2012 14


PORT OF DURRES<br />

The main and biggest <strong>Port</strong> in Albania and the gateway <strong>of</strong><br />

Corridor VIII<br />

It is situated in SW part <strong>of</strong> the city <strong>of</strong> Duress and 36 km East<br />

<strong>of</strong> Tirana.<br />

DPA is a joint stock Company Where 100% <strong>of</strong> shares<br />

belong to the government.<br />

• The port has 11 wharfs<br />

• Road and Railway access<br />

• Water area<br />

67 Ha<br />

• Land area<br />

80 Ha<br />

• Length <strong>of</strong> the quay<br />

2.2 km<br />

• Water Depth in the basin<br />

7.5 - 11.5 m<br />

• Cargo volume over<br />

3 Mln Ton/Year<br />

6/28/2012 15


Financed projects – <strong>Port</strong> <strong>of</strong> Durres<br />

–World Bank + OPEC $23,0 Million<br />

–PHARE Program $ 4,4 Million<br />

–TDA<br />

$ 1,9 Million<br />

–EIB<br />

$17,0 Million<br />

6/28/2012 16


Financed projects – World Bank<br />

• Rehabilitation <strong>of</strong> port wharfs<br />

• Rehabilitation <strong>of</strong> the wind wall and<br />

west breakwater<br />

• Rehabilitation <strong>of</strong> storehouses<br />

• Repairing <strong>of</strong> cranes and buying <strong>of</strong> new<br />

cranes<br />

6/28/2012 17


Financed projects<br />

WAREHOUSES<br />

HMO RECONSTRUCTION<br />

WINDWALL & PAVING WORKS<br />

6/28/2012 18


Financed Projects - PHARE<br />

• Rehabilitation <strong>of</strong> ferry terminal<br />

• Rehabilitation <strong>of</strong> 120 m <strong>of</strong> wharf<br />

• Construction <strong>of</strong> 60 m new wharf<br />

6/28/2012 19


Financed projects - TDA<br />

• Feasibility study for container’s<br />

terminal<br />

• Two reach<br />

stackers for<br />

container’s<br />

handling<br />

6/28/2012 20<br />

REACHSTEACKER


Financed projects - EIB<br />

• Construction <strong>of</strong> the<br />

start up container’s<br />

terminal<br />

• Drainage system<br />

and paving works<br />

• Emergent dredging<br />

<strong>of</strong> basin and access<br />

channel<br />

• New 120 tons<br />

mobile crane<br />

120 tons mobile crane<br />

6/28/2012 21


What is the outcome <br />

Year<br />

1999 2000 2001 2002 2003<br />

<strong>Port</strong> <strong>of</strong> Durres<br />

Imports 1.448.677 1.614.337 1.809.300 2.041.216 2.427.708<br />

Exports 108.540 131.500 149.713 136.908 243.413<br />

TOTAL 1.557.217 1745.917 1.959.013 2.178.124 2.671.121<br />

<strong>Port</strong> <strong>of</strong> <strong>Vlora</strong><br />

Imports 366.826 526.700 591.800 496.400 331.100<br />

Exports 0 0 0 7.000 21.400<br />

TOTAL 366.826 526.700 591.800 503.470 352.300<br />

<strong>Port</strong> <strong>of</strong> Shengjin<br />

Imports 175.400 227.700 255.500 344.230 306.900<br />

Exports 7.700 4.500 6.900 2.600 9.900<br />

TOTAL 183.100 232.200 362.400 346.830 316.800<br />

<strong>Port</strong> <strong>of</strong> Saranda<br />

Imports 47.200 60.400 51.600 60.630 82.100<br />

Exports 0 0 0 0 0<br />

6/28/2012 22<br />

TOTAL 47.200 60.400 51.600 60.630 82.100


Cargo volumes port <strong>of</strong> Durres<br />

Million <strong>of</strong> tons<br />

3.5<br />

3<br />

2.5<br />

imports<br />

2<br />

exports<br />

1.5<br />

1<br />

0.5<br />

0<br />

1999<br />

2000<br />

2001<br />

2002<br />

2003<br />

2004<br />

2005<br />

Years<br />

6/28/2012 23


Passenger’s traffic<br />

800000<br />

700000<br />

600000<br />

500000<br />

400000<br />

300000<br />

200000<br />

DURRES<br />

VLORE<br />

SARANDE<br />

SHENGJIN<br />

100000<br />

0<br />

2000 2001 2002 2003 2004 2005<br />

6/28/2012 24


Containers forecast traffic<br />

• Year 2005 – 10.000 TEU<br />

(Fact. 15.000 TEU)<br />

• Year 2010 - 40.000 TEU<br />

• Year 2015 - 100.000 TEU<br />

• Year 2020 - 150.000 TEU<br />

• Year 2025 - 220.000 TEU<br />

6/28/2012 25


Containers forecast<br />

250000<br />

200000<br />

150000<br />

100000<br />

forecast<br />

fact<br />

50000<br />

0<br />

2005 2010 2015 2020 2025<br />

6/28/2012 26


Our goal<br />

• To make Durres a modern and competitive<br />

<strong>Port</strong> in the region, with modern technology<br />

and equipments, qualified staff and efficient<br />

services in order to play its role as the<br />

GATEWAY <strong>of</strong> CORRIDOR VIII<br />

This is what we<br />

would like to see<br />

more in our<br />

<strong>Port</strong>s…<br />

6/28/2012 27


How to achieve that Goal !!!<br />

• Improve legal framework on ports<br />

• Privatization <strong>of</strong> services<br />

(Concession and PPP)<br />

• Construct new terminals<br />

• Buy new equipments<br />

• Deepening the harbor and access channel<br />

• Rehabilitate railway and road connection<br />

6/28/2012 28


Future port investments<br />

• Passengers terminal (EIB + EBDR) 22 Mln Eur<br />

• Multimodal container’s terminal 80 Mln Eur<br />

• New container’s handling equipments 35 Mln Eur<br />

• Bulk cargo terminal 35 Mln Eur<br />

• Deepening the harbor and access channel 11 Mln Eur<br />

• Increase <strong>of</strong> port safety & security 6,5 Mln Eur<br />

6/28/2012 29


Future Passenger’s<br />

Terminal in Duress <strong>Port</strong><br />

Construction Cost<br />

• 22 mln EUR<br />

• it is expected to start on<br />

2006<br />

Financing Agencies<br />

• EIB & EBRD<br />

Detail Design completed<br />

• Jan’02-Aug’04<br />

6/28/2012 30


DURRES PORT MASTER<br />

PLAN FINAL PHASE<br />

6/28/2012 31


<strong>Port</strong> related investments<br />

• Completion <strong>of</strong> works for Corridor<br />

VIII<br />

– Durres-Tirane/Rrogozhine-Elbasan-<br />

Qafethane-Skopie-S<strong>of</strong>ie-Varna-Burgas<br />

– Completion <strong>of</strong> Railway missing links<br />

• Completion <strong>of</strong> Durres-Kukes-<br />

Morine Road<br />

• Completion <strong>of</strong> road segments<br />

Lushnje-Fier-Vlore<br />

6/28/2012 32


CORRIDOR VIII AND DURRES-MORINE ROAD<br />

PRISHTINE<br />

SHENGJIN<br />

DURRES<br />

Vlore<br />

KORCE<br />

SARANDE<br />

6/28/2012 33


How Corridor VIII and Durres -<br />

Morine Road will affect <strong>Port</strong>s<br />

• The area reached by port <strong>of</strong> Durres and port <strong>of</strong><br />

<strong>Vlora</strong> through Corridor VIII will be expanded<br />

towards Macedonia (FYROM) and Bulgaria, so<br />

linking the Adriatic with the Black Sea<br />

• Durres-Morine Road will make it possible for<br />

Kosova to use <strong>of</strong> port <strong>of</strong> Durres and port <strong>of</strong><br />

Shengjini.<br />

6/28/2012 34


CORRIDOR VIII AND DURRES-MORINE ROAD<br />

6/28/2012 35


THANK YOU !<br />

DONORS CONFERENCE<br />

MARCH 2006<br />

6/28/2012<br />

36