Views
3 years ago

PROJECT SNAPSHOT Design BUILD - Build-laccd.org

PROJECT SNAPSHOT Design BUILD - Build-laccd.org

PROJECT SNAPSHOT Design BUILD -

PROJECT SNAPSHOT Design BUILD CAMPUS PROJECT NAME PROJECT DESCRIPTION BUDGET STEP 2 (RFQ) STEP 3 (RFP) CITY Learning Support Construction of a new two-story Learning Support Center that will consolidate the instructional $24,000,000 Issued January 22, March Center, Monroe Street needs for faculty and staff on campus. Included departments; Faculty & Staff Center, Staff 2013 Plaza Development, Copy Center, instructional Media Center, Learning Skills Center, Teacher Learning Center, and Speech. The Monroe Street Plaza scope of work includes landscape and hardscape between Heliotrope Drive and New Hampshire Avenue. AWARD. AUTH July HARBOR Old Administration Modernization / Campus-Wide ADA Transition Access Compliance The Old Administration project entails a complete renovation of an existing building with historical significance to the campus. The building will accommodate the Community Services program, offices for the IT department, and an upgraded and expanded Data Center East. The project will include: upgrades to the building exterior, architectural upgrades, structural reinforcement, upgrades to the building interior; a complete replacement of all building Mechanical, Electrical, Plumbing and Technology systems; improvements to the overall landscape and hardscape; and upgrades to the utilities infrastructure. $11,100,000 Issued February 14, 2013 March July The Campus Wide ADA Transition and Access Compliance project is to address accessibility deficiencies that have been identified throughout the campus. This project will entail the planning, design installation, upgrade of roadway, walkway, grounds, parking lot and entrances, exits, and interior spaces of buildings of accessibility improvement. VALLEY ADA and Allied Health Center Science Center The scope of work associated with the Allied Health & Science Center includes: waterproofing exterior locations subsequent to third party testing's and analysis, restorations of interior drain systems and DSA punchlist work. $5,500,000 Issued February 20, 2013 April July STEP 3 RFP STEP 2 RFQ VALLEY The Campus Wide ADA Transition and Access Compliance project is to address accessibility deficiencies that have been identified throughout the campus. Campus The purpose of this project is to upgrade project is to increase efficiency and expand capacity. Infrastructure The scope will include a new high efficiency variable speed 900-ton chiller and high efficiency Upgrades: Energy water pumps sized to meet the upgrade performance requirements. Some chilled water and hot Infrastructure (Central water piping in the tunnel will be upsized to meet the flow requirements. some chilled water Plant Upgrade) piping circuit. A new long life (40+ years) 6,900-ton-hr underground thermal energy storage tank will be added to the system. The tank will be approximately 25' high and 6'5 in diameter and would be located under a new parking lot to be build later. $4,500,000 March April July VALLEY Planetarium Construct / Modernize a Planetarium $3,500,000 TBD TBD TBD VALLEY VALLEY CITY EAST Campus Center & Sustainable Mall Athletic Training Facility Holmes Hall Modernization & New Student Services Building Science Center & Mathematics Building Renovation of the basement and first floor of the campus center building. The renovated building $4,900,000 TBD TBD TBD will accommodate new classrooms, faculty offices, meeting rooms and other support spaces to primarily serve the Speech Team, specifically Funded Programs and the Information Technology Department. Scope of work will include selected demolition, replacement of the interior/exterior hardware, refer4bishing of interior spaces, additional restroom facilitates on the first floor and SMART classroom amenities as required by the LACCD Standards. The Athletic Training Facility project has 4 major components: 1) The Monarch Stadium Field House, which will provide new locker rooms, offices, classroom, weight room, and training facilities; 2) The Baseball/Softball Field House, which will provide new locker rooms, offices, storage areas and training rooms; 3) Renovation of the softball fields, which includes 2 new artificial turf fields, 4 dugouts, batting cages and bullpens; 4) Renovation of baseball field, which includes a new artificial turf field, fencing, concrete walkways, 2 new dugouts, batting cages and bullpens. Also included in the scope is the construction of javelin throw, discus, hammer throw, and archery field areas. New Student Services Building will require the demolition of the old Learning Resource Center (approximately 65,000 SF). The three-story concrete structure will be replaced by a three-story structural steel, glass curtain wall and brick veneer structure approximately 73,000 SF. It will primarily house the Business offices, Financial Aid, Counseling, the Health Center, OSS, etc. These departments, currently housed in temporary space will move into the new LEED Gold Certified building that consolidates and places most of the student services under one roof. Holmes Hall, built in the late 1930’s and approximately 23,000 SF, primarily houses the law and psychology departments. Project consists of modernization of the building; abatement and selective demolition, door replacement, new ceilings, lighting and general electrical upgrades, HVAC central air upgrade, new interior finishes to classrooms and offices, new elevator and minor structural modifications. $21,000,000 TBD TBD TBD $30,075,285 Harper - Sillman Wright, McCarthy - MVE, Pankow - Quatro Issued February 4, 2013 Swing space for various new construction projects. $7,000,000 Harper - Sillman Wright, Hensel Phelps - Carrier Johnson, Pankow - Quatro Issued October 15, 2012 May April PIERCE North of Mall Renovations Project consists of the renovations to eleven existing 1950's era classroom, faculty, and administration buildings (Total SF = 123,827 SF). The renovations include the following: 1) interior renovations, 2) exterior plaster and roofing replacement, 3)seismic upgrades, 4) IT enhancements, 5) hazardous materials abatement including walkways, site structures, and ADA path of travel compliance upgrades. This projects is divided into three phases. $2,257,306 Harper - Sillman Wright, Pankow - Quatro, SJ Amoroso - Leo A. Daly March June CITY Physical Plant (M&O Building) • Physical Plant Building to house Maintenance and Operations Department consisting of administrative offices, materials storage and service yard, workshops for painting and signs, carpentry, metalwork, auto/HVAC, plumbing, electrical and electronics. • New tennis facility for athletics, instruction and recreation. The facility will include six (6) lighted tennis courts with an acrylic courts surfacing system and mesh covered perimeter fencing. $6,000,000 Ian Thomas - MSP, Lundgren - PSWC, Pankow SP - IBI Issued 1/20/11 AWARDED 1/7/13 to Pankow SP - IBI VALLEY Multi-Purpose Community Services Center New 20,000 sq ft Center will support community services and extension programs. $13,967,126 Harper - DLR/WWCOT, Pankow - Quatro, Suffolk - RJC Issued 6/27/11 AWARDED 10/5/11 to Pankow - Quatro VALLEY Community Workforce Development Center/Administration New 20,000 sq ft Center will support community services, extension programs, and college administration. $39,373,718 Pankow-Quatro, Harper- DLR/WWCOT, Taisei-Osborn Issued 7/11/11 AWARDED 12/7/11 to Pankow - Quatro 3/7/2013

2006-07 Annual Report to the Community - Build-laccd.org
Los Angeles Mission College - Build-laccd.org
Los Angeles Valley College - Build-laccd.org
Development of Design & Build (D&B) Projects in Singapore ...
READ Building Financial Models, Third Edition: The Complete Guide to Designing, Building, and Applying Projection Models FREE TRIAL
I-75 Median Cable Barrier Design Build Project - Traffic Incident ...
ESD design guide for office and public buildings - Department of ...
Design and Bidding of PCB Abatement Projects for Building ...
Project Fact Sheet - the Public Building Commission of Chicago
The Building Biology Approach to New Home and Office Design and ...
View project images. [1.5 Mb pdf] - Center for Building Communities ...
Design and Build Project Solutions - Bilfinger Berger Industrial ...
design excellence award 2012 - Building Designers Association of ...
Building Next Generation Design Support Programmes - See Project
Research on the Current Status of Design-Build Projects in ... - Fidic
Intermodal Parking Facilities And Enhancements Design-Build Project
An office project in North Austin offering flexible buildings ...
Building Information Modeling and Security Design - GHD
Designing High Performance Buildings and CHP - Houston ...
Chapel Facilities Design Guide - The Whole Building Design Guide
New ECE building design approved - Department of Electrical and ...
Building Envelope Design using ROXUL® (BEDR™) - Pharos Project
Geotechnical Aspects of Design Build Project Delivery An ... - ictpa-scc
State Route 22 Design-Build Project - ictpa-scc
2012 Design Build Awarded Projects as of Jan 10 ... - Build-laccd.org
PROJECT SNAPSHOT Design BUILD - Build LACCD
Primavera Project Planner - Build-laccd.org
Primavera Project Planner - Build-laccd.org
Aesthetic & Design Guidelines - Build-laccd.org