<strong>Government</strong> <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong><br />

PROJECT UDAY<br />

(URBAN WATER SUPPLY & ENVIRONMENTAL IMPROVEMENT IN MADHYA PRADESH)<br />

(ADB Loan No. 2046-IND)<br />

<strong>Project</strong> Management Unit<br />

atus Report<br />

QUARTERLY REPORT<br />

(QR-07)<br />

JUNE 2007<br />

July 2007


<strong>Government</strong> <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong><br />

PROJECT UDAY<br />

(URBAN WATER SUPPLY & ENVIRONMENTAL IMPROVEMENT IN MADHYA PRADESH)<br />

(ADB Loan No. 2046-IND)<br />

<strong>Project</strong> Management Unit<br />

atus Report<br />

QUARTERLY REPORT<br />

(QR-07)<br />

JUNE 2007<br />

July 2007<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


<strong>Government</strong> <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong><br />

PROJECT UDAY<br />

(URBAN WATER SUPPLY & ENVIRONMENTAL IMPROVEMENT IN MADHYA PRADESH)<br />

Quarterly Progress Report<br />

June 2007<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

i


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

<strong>Project</strong> Management Unit<br />

Quarterly Progress Report (QP-07)<br />

June 2007<br />

Contents<br />

Executive Summary<br />

1. INTRODUCTION......................................................................................................................................... 1<br />

1.1 PROJECT BACKGROUND ........................................................................................................................ 1<br />

1.2 BRIEF PROJECT DESCRIPTION ............................................................................................................... 1<br />

1.3 PROJECT OBJECTIVES AND COMPONENT PARTS..................................................................................... 2<br />

1.3.1 Part A: Urban Water and Environmental Improvement..................................................................2<br />

1.3.2 Part B: Urban Governance and Institutional Development............................................................2<br />

1.3.3 Part C: Implementation Assistance ...................................................................................................3<br />

1.4 IMPLEMENTATION SCHEDULE ................................................................................................................. 3<br />

2. FUND UTILIZATION ................................................................................................................................... 4<br />

2.1 PROJECT INVESTMENT AND FINANCING .................................................................................................. 4<br />

2.1.1 <strong>Project</strong> Financing Plan ........................................................................................................................4<br />

2.1.2 Status <strong>of</strong> Counterpart & Co-financing <strong>of</strong> Funds...............................................................................4<br />

2.1.3 Targeted Disbursement Schedule and Monitoring..........................................................................5<br />

2.2 DISBURSEMENTS AND FINANCIAL STATEMENTS ...................................................................................... 5<br />

2.2.1 ADB Cumulative Disbursements .......................................................................................................5<br />

2.2.2 Financial Statements...........................................................................................................................5<br />

2.3 PROJECT COSTS................................................................................................................................... 6<br />

2.3.1 Current Scope and <strong>Project</strong> Investment Status ................................................................................6<br />

2.3.2 <strong>Project</strong> Implementation Progress Status ..........................................................................................6<br />

2.3.3 Variation <strong>of</strong> <strong>Project</strong> Costs to Budget Allocation...............................................................................6<br />

3. STATUS OF IMPLEMENTATION ARRANGEMENTS............................................................................... 7<br />

3.1 FORMATION OF COMMITTEES................................................................................................................. 7<br />

3.1.1 Empowered Committee.......................................................................................................................7<br />

3.1.2 City Level Steering Committee ..........................................................................................................7<br />

3.2 FORMATION OF PROJECT MANAGEMENT AND IMPLEMENTATION UNITS..................................................... 8<br />

3.2.1 <strong>Project</strong> Management Unit ...................................................................................................................8<br />

3.2.2 <strong>Project</strong> Implementation Unit ...............................................................................................................8<br />

3.2.3 Technical and Tender Evaluation Committees................................................................................8<br />

3.3 FORMATION OF THE SUPPORT CONSULTANTS......................................................................................... 8<br />

3.3.1 <strong>Project</strong> Management Consultant .......................................................................................................8<br />

3.3.2 Design and Supervision Consultants ................................................................................................9<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

ii


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

3.3.3 Public Relation Consultant .................................................................................................................9<br />

3.3.4 Benefit Monitoring and Evaluation Consultant.................................................................................9<br />

4. PROJECT AND IMPLEMENTATION PROGRESS.................................................................................. 10<br />

4.1 OVERVIEW OF ACTIVITIES TO DATE....................................................................................................... 10<br />

4.1.1 Infrastructural Improvement .............................................................................................................10<br />

4.1.2 Social and Community Development..............................................................................................10<br />

4.1.3 Financial Improved Management ....................................................................................................11<br />

4.1.4 Institutional Governance ...................................................................................................................11<br />

4.2 PRE-IMPLEMENTATION ACTIVITIES........................................................................................................ 11<br />

4.2.1 Imparted Training...............................................................................................................................11<br />

4.2.2 Tendering Process and e-Tendering ..............................................................................................11<br />

4.2.3 Outstanding Clearance Issues.........................................................................................................12<br />

4.2.4 Topographical Survey Work .............................................................................................................12<br />

4.2.5 Proposed Deferral <strong>of</strong> Contracts to JN-NURM................................................................................12<br />

4.2.6 <strong>Project</strong> Performance Management System ...................................................................................12<br />

4.2.7 <strong>Project</strong> Status Progress Meetings ...................................................................................................13<br />

5. URBAN WATER SUPPLY AND ENVIRONMENTAL IMPROVEMENT .................................................. 14<br />

5.1 URBAN WATER SUPPLY....................................................................................................................... 14<br />

5.1.1 BMC Water Supply Pre-Construction .............................................................................................14<br />

5.1.2 BMC Water Supply Construction Phase ........................................................................................15<br />

5.1.3 GMC Water Supply Pre-Construction.............................................................................................16<br />

5.1.4 GMC Water Supply Construction Phase ........................................................................................16<br />

5.1.5 JMC Water Supply Pre-Construction..............................................................................................19<br />

5.1.6 JMC Water Supply Construction Phase .........................................................................................19<br />

5.1.7 IMC Water Supply Pre-Construction...............................................................................................20<br />

5.1.8 IMC Water Supply Construction Phase ..........................................................................................21<br />

5.2 WASTEWATER AND SANITATION ........................................................................................................... 24<br />

5.2.1 Bhopal Wastewater............................................................................................................................24<br />

5.2.2 Gwalior Wastewater ..........................................................................................................................25<br />

5.2.3 Jabalpur Wastewater.........................................................................................................................25<br />

5.2.4 Indore Wastewater.............................................................................................................................26<br />

5.3 SOLID WASTE MANAGEMENT............................................................................................................... 26<br />

5.3.1 Bhopal Solid Waste Management ...................................................................................................26<br />

5.3.2 Jabalpur Solid Waste Management ................................................................................................26<br />

5.3.3 Indore Solid Waste Management ....................................................................................................27<br />

5.4 STORMWATER DRAINAGE .................................................................................................................... 27<br />

6. URBAN GOVERNANCE AND INSTITUTIONAL DEVELOPMENT......................................................... 28<br />

6.1 SOCIAL AND COMMUNITY DEVELOPMENT.............................................................................................. 28<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

iii


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

6.1.1 Slum Improvement Component under AIF & CIF .........................................................................28<br />

6.1.2 Public Awareness Campaign Initiatives..........................................................................................28<br />

6.1.3 Gender Action Plan and Field Manual ............................................................................................29<br />

6.1.4 Land and Resettlement Issues ........................................................................................................29<br />

6.2 FINANCIAL MANAGEMENT .................................................................................................................... 30<br />

6.2.1 Common <strong>Project</strong> Incremental Costs ...............................................................................................30<br />

6.2.2 Financial Improvement Action Plan.................................................................................................30<br />

Bhopal Municipal Corporation .....................................................................................................................30<br />

Gwalior Municipal Corporation ....................................................................................................................31<br />

Jabalpur Municipal Corporation ..................................................................................................................31<br />

Indore Municipal Corporation ......................................................................................................................31<br />

6.2.3 Water Supply Management Improvement Plan.............................................................................31<br />

6.3 INSTITUTIONAL DEVELOPMENT............................................................................................................. 32<br />

6.3.1 Programme Reforms .........................................................................................................................32<br />

6.3.2 Urban Development Policy...............................................................................................................32<br />

6.3.3 State Level Body for Resource Mobilization ..................................................................................33<br />

6.3.4 Metropolitan Planning & Regional Development Authority..........................................................33<br />

6.3.5 Urban Sanitation Mission..................................................................................................................33<br />

6.3.6 Water Supply & Sewerage Board for MP.......................................................................................33<br />

6.4 PROJECT PERFORMANCE MANAGEMENT REPORT................................................................................. 33<br />

6.5 MANAGEMENT INFORMATION SYSTEM .................................................................................................. 34<br />

6.5.1 Financial Information .........................................................................................................................34<br />

6.5.2 Physical and Financial Tracking ......................................................................................................34<br />

6.6 IMPLEMENTATION OF E-TENDERING PROCESS....................................................................................... 35<br />

6.7 MONITORING OF OUTSTANDING CLEARANCES ...................................................................................... 35<br />

7. COMPLIANCE WITH ADB MAJOR LOAN COVENANTS ...................................................................... 36<br />

7.1 SECTOR LOAN COVENANTS ................................................................................................................. 36<br />

7.2 ENVIRONMENTAL LOAN COVENANTS .................................................................................................... 37<br />

7.3 SOCIAL LOAN COVENANTS .................................................................................................................. 38<br />

7.4 FINANCIAL LOAN COVENANTS .............................................................................................................. 40<br />

7.5 OTHER RELATED LOAN COVENANTS .................................................................................................... 43<br />

8. RELATED ACTIVITIES AND ISSUES ..................................................................................................... 48<br />

8.1.1 Integrity <strong>of</strong> Contracts and Realisation <strong>of</strong> Benefits .........................................................................48<br />

8.1.2 Finalization <strong>of</strong> Approvals & Resettlement Issues..........................................................................48<br />

8.1.3 Disparity between WS and WW Programmes...............................................................................48<br />

8.1.4 JN-NURM Programme ......................................................................................................................48<br />

8.1.5 Poor deployment <strong>of</strong> Staff to Municipal Corporations ....................................................................48<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

iv


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

List <strong>of</strong> Tables:<br />

Table 2.1<br />

Table 2.2<br />

Table 2.3<br />

Table 2.4<br />

Table 2.5<br />

Table 2.6<br />

Summary <strong>of</strong> Proposed Investments<br />

<strong>Project</strong> Total Costs Reconciliation Chart (Rs. To US$)<br />

<strong>Project</strong> Financing Plan<br />

Statement <strong>of</strong> PMU Withdrawal Application vs. ADB Disbursement<br />

<strong>Project</strong> Progress Overall Summary<br />

<strong>Project</strong> Implementation Weighted Progress Status<br />

Table 4.1<br />

Table 4.2<br />

Table 4.3<br />

City-wise <strong>Project</strong> Progress Implementation Works<br />

PMU Central Procurement Contracts (Wastewater & SWM)<br />

Status <strong>of</strong> Contract Packages Deferral to JN-NURM<br />

Table 5.1<br />

Table 5.2<br />

Table 5.3<br />

Table 5.4<br />

Water Supply Progress Status<br />

Wastewater & Sanitation Progress Status<br />

Solid waste Management Progress Status<br />

Stormwater Drainage Progress Status<br />

List <strong>of</strong> Figures:<br />

Figure 2.1 Disbursement Schedule (Rs. Lakh)<br />

Figure 2.2 Actual vs Targeted Disbursement 2007<br />

List <strong>of</strong> Appendices:<br />

Appendix A:<br />

Appendix B:<br />

Appendix C:<br />

Appendix D:<br />

Implementation Schedule Progress Status:<br />

Bhopal ...............................................................................Sheet 1 <strong>of</strong> 8<br />

Gwalior ...............................................................................Sheet 3 <strong>of</strong> 8<br />

Jabalpur .............................................................................Sheet 5 <strong>of</strong> 8<br />

Indore ................................................................................Sheet 7 <strong>of</strong> 8<br />

Status <strong>of</strong> Clearances<br />

<strong>Project</strong> Management Staffing Status<br />

e-Tendering Status Report<br />

Appendix E: Financial Statement (30 th June 2007)<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

v


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

Abbreviations and Acronyms<br />

ADB<br />

ADP<br />

AIF<br />

BMC<br />

BME<br />

BOO<br />

BPL<br />

BPT<br />

BOT<br />

BOOT<br />

CBO<br />

CEO<br />

CIF<br />

CLSC<br />

DFID<br />

DSC<br />

EIA<br />

EIRR<br />

FAP<br />

FGD<br />

FIAP<br />

FIRR<br />

GIS<br />

GMC<br />

GoI<br />

GoMP<br />

GWL<br />

HUDCO<br />

ICB<br />

IMC<br />

IND<br />

IR<br />

IS<br />

JBP<br />

JDA<br />

JMC<br />

LCB<br />

MAPPR<br />

MC<br />

M&E<br />

MIC<br />

MIS<br />

MLD<br />

MP<br />

MPUMP<br />

NMAM<br />

NGO<br />

O&M<br />

PAM<br />

PAP<br />

Asian Development Bank<br />

Annual Development Plan<br />

Area Improvement Fund<br />

Bhopal Municipal Corporation<br />

Benefit Monitoring and Evaluation<br />

Build Own Operate<br />

Bhopal<br />

Break Pressure Tank<br />

Build Operate Transfer<br />

Build Own Operate Transfer<br />

Community Based Organization<br />

Chief Executive Officer<br />

Community Initiative Fund<br />

City Level Steering Committee<br />

Department for International Development (UK)<br />

Design and Supervision Consultant<br />

Environmental Impact Assessment<br />

Economic Internal Rate <strong>of</strong> Return<br />

Financial Action Plan<br />

Focus Group Discussion<br />

Financial Improvement Action Plan<br />

Financial Internal Rate <strong>of</strong> Return<br />

Geographical Information System<br />

Gwalior Municipal Corporation<br />

<strong>Government</strong> <strong>of</strong> India<br />

<strong>Government</strong> <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong><br />

Gwalior<br />

Housing and Urban Development Corporation Ltd.<br />

International Competitive Bidding<br />

Indore Municipal Corporation<br />

Indore<br />

Item Rate<br />

International Shopping<br />

Jabalpur<br />

Jabalpur Development Authority<br />

Jabalpur Municipal Corporation<br />

Local Competitive Bidding<br />

Municipal Action Plan for Poverty Reduction<br />

Municipal Corporation<br />

Mechanical and Electrical<br />

Mayor-in-Council<br />

Management Information System<br />

Million litres per day<br />

<strong>Madhya</strong> <strong>Pradesh</strong><br />

<strong>Madhya</strong> <strong>Pradesh</strong> Urban Management Programme<br />

National Municipal Accounting Manual<br />

Non <strong>Government</strong> Organization<br />

Operation and Maintenance<br />

<strong>Project</strong> Administration Memorandum<br />

<strong>Project</strong> Affected People<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

vi


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

Abbreviations and Acronyms Contd.<br />

PHED<br />

PIU<br />

PMC<br />

PMU<br />

PPP<br />

PPPP<br />

PPTA<br />

PRC<br />

PSP<br />

PWD<br />

QA/QC<br />

RUIDP<br />

SWM<br />

SPS<br />

STP<br />

TA<br />

ToR<br />

TK<br />

TCPO<br />

UADD<br />

ULB<br />

UWSEIP<br />

VFJ<br />

WAC<br />

WACC<br />

WPS<br />

WRD<br />

WSOP<br />

WTP<br />

Public Health Engineering Department<br />

<strong>Project</strong> Implementation Unit<br />

<strong>Project</strong> Management Consultant<br />

<strong>Project</strong> Management Unit<br />

Public Private Partnership<br />

Public Private People Partnership<br />

<strong>Project</strong> Preparatory Technical Assistance<br />

Public Relations Consultant<br />

Private Sector Participation<br />

Public Works Department<br />

Quality Assurance/ Quality Control<br />

Rajasthan Urban Infrastructure Development <strong>Project</strong><br />

Solid Waste Management<br />

Sewerage Pumping Station<br />

Sewerage Treatment Plant<br />

Technical Assistance<br />

Terms <strong>of</strong> Reference<br />

Turnkey<br />

Town & Country Planning Office<br />

Urban Administration and Development Department (GoMP)<br />

Urban Local Body<br />

Urban Water Supply and Environmental Improvement <strong>Project</strong><br />

Vehicle Factory Jabalpur<br />

Water for Asian Cities<br />

Weighted Average Cost <strong>of</strong> Capital<br />

Water Pumping Station<br />

Water Resources Department (GoMP)<br />

Water Supply Optimization Programme<br />

Water Treatment Plant<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

vii


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

Executive Summary<br />

The Loan Agreement, under reference 2046-IND, was signed on the 9 th March 2005 and made<br />

effective on the 20 th May 2005. The Urban Water Supply and Environmental Improvement <strong>Project</strong><br />

(UWSEIP) in <strong>Madhya</strong> <strong>Pradesh</strong> effectively started from 21 st June 2006 and scheduled to be<br />

completed by the 31 st March 2009.<br />

The principal objectives <strong>of</strong> the <strong>Project</strong> are as follows:<br />

• promote sustainable growth and poverty reduction in the four selection cities <strong>of</strong> Bhopal, Gwalior,<br />

Jabalpur and Indore <strong>of</strong> the state <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong>; and<br />

• strengthen the capacities <strong>of</strong> the project cities to plan and manage urban water supply and<br />

sanitation systems in a more effective, transparent and sustainable manner.<br />

While the <strong>Project</strong> will benefit the entire community in general, some components will focus on<br />

upgrading the conditions <strong>of</strong> the poorest or most needy groups in slums areas in particular. The<br />

project will also promote the active participation <strong>of</strong> women citizens in municipal management and<br />

project implementation, as both beneficiaries and agents. The <strong>Project</strong> will specifically involve<br />

providing sustainable basic urban infrastructure and services to all citizens <strong>of</strong> the <strong>Project</strong> cities; and<br />

ensure the capacity building <strong>of</strong> the <strong>Project</strong> cities to plan and manage urban water supply and<br />

sanitation systems in more effective, transparent and sustainable manner.<br />

The <strong>Project</strong> comprises <strong>of</strong> the three component parts:<br />

• Part A: Urban Water Supply and Environmental Improvement;<br />

• Part B: Urban Governance, Institutional Development and Public Participation; and<br />

• Part C: <strong>Project</strong> Implementation Assistance.<br />

Part A: Urban Infrastructure and Environmental Improvement: Implementation under Part-A is<br />

focused on improving and expanding priority urban water supply and environmental infrastructure<br />

and services, inclusive <strong>of</strong> urban water supply, sewerage and sanitation, stormwater drainage and<br />

solid waste management. The overall budget allocation for Part A and B, for the physical works<br />

infrastructural development component <strong>of</strong> the programme, inclusive <strong>of</strong> the Community Development<br />

and Slum Improvement components, given in Table 2.1, totals Rs.84,440 lakh (to an exchange rate<br />

<strong>of</strong> Rs.41 = US$), as compared to the current total cost estimated amount <strong>of</strong> Rs.103,895 lakh,<br />

equating to an overall increase <strong>of</strong> 23.04%.<br />

The current status <strong>of</strong> design work, given in Table 4.1, stands at Rs.93,364.52 lakh, equivalent to<br />

90% <strong>of</strong> the total targeted amount. Invitation for bids has been issued for 88 contract packages for a<br />

total estimated amount <strong>of</strong> Rs.89,748.58, which is 86% <strong>of</strong> the overall programme. Award <strong>of</strong> contracts<br />

have been issued for 58 contract packages for a total contract amount <strong>of</strong> Rs.28,137.97, which is<br />

27% <strong>of</strong> the overall programme. Contracts have been completed for 28 PMU centrally procurement<br />

packages, for a total contract amount <strong>of</strong> Rs.1,333.46, which is 1.3% <strong>of</strong> the overall programme.<br />

The cumulative expenditure, to the 30 th June 2007, amounts to Rs.5,931.30 lakh, which is 5.26% <strong>of</strong><br />

the overall approved fund <strong>of</strong> Rs.112,750 lakh (US$ 275 million) and equates to an equivalent<br />

weighted average project progress status <strong>of</strong> 27%, as compared to an effective 54% <strong>of</strong> elapsed time<br />

in terms <strong>of</strong> total loan period.<br />

Part B: Urban Governance, Institutional Development and Public Participation: utilization <strong>of</strong><br />

community level funds and designed to increase the awareness and participation <strong>of</strong> the project<br />

beneficiaries in project implementation.<br />

Part C: <strong>Project</strong> Implementation Assistance: support during project implementation to the <strong>Project</strong><br />

Management Unit (PMU) at state level and the <strong>Project</strong> Implementation Units (PIU’s) at city level.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

viii


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

Quarterly Report Number (QR-07) to 30 th June 2007<br />

EXECUTIVE SUMMARY DATA SHEET<br />

<strong>Project</strong> Salient Data:<br />

City Steering Committee established 8 th June 2004<br />

Empowered Committee established 11 th August 2004<br />

Loan agreement signed on 9 th March 2005; made effective 20 th May 2005<br />

<strong>Project</strong> completion date: 31 st March 2009<br />

<strong>Project</strong> Costs:<br />

Total Investment:<br />

PAM Budget Allocation US$ 275m (Rs.112,750 lakh) at exchange<br />

rate Rs.41.00 to US$<br />

Estimated Amount to date:<br />

(Inclusive <strong>of</strong> apportioned support<br />

costs, contingencies, and taxes)<br />

Totals<br />

<strong>Project</strong> Financing:<br />

Bhopal<br />

Gwalior<br />

Jabalpur<br />

Indore<br />

(US$ 333.26m)<br />

Rs.19,023 lakh: (21.07% increase)<br />

Rs.16,725 lakh (8.58% decrease)<br />

Rs.28,524 lakh (26.24% increase)<br />

Rs.72,367 lakh (28.89% increase)<br />

Rs.136,638 lakh<br />

(equivalent: average 21.19% increase)<br />

Funding Source: Percentage: Total Investment FC & LC:<br />

ADB 65.82% Rs.74,210 lakh US$ 181m<br />

GoMP 16.69% Rs.18,819 lakh US$ 45.9m<br />

<strong>Project</strong> Cities 17.31% Rs.19,516 lakh US$ 47.6m<br />

UN Habitat 0.18% Rs. 205 lakh US$ 0.5m<br />

Urban Infrastructural Improvement <strong>Project</strong> Progress:<br />

Total Contract Packages 101 Nos. Rs.110,824.63 lakh<br />

Contracts Completed 28 Nos. Rs.1,333.46 lakh 1.3%<br />

Contracts Awarded 58 Nos. Rs.28,137.97 lakh 27.1%<br />

Invitation for Bids (IFB) 88 Nos. Rs.89,748.58 lakh 86.4%<br />

Design Report & Bid Docs 93 Nos Rs.93,364.52 lakh 89.9%<br />

Concept Report 97 Nos Rs.100,734.52 lakh 97.0%<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

ix


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

1. INTRODUCTION<br />

The Loan Agreement, under reference number 2046-IND, for the Urban Water Supply and<br />

Environmental Improvement <strong>Project</strong> (UWSEIP) in <strong>Madhya</strong> <strong>Pradesh</strong>, between the <strong>Government</strong> <strong>of</strong><br />

<strong>Madhya</strong> <strong>Pradesh</strong>, India and the Asian Development Bank (ADB), was signed on the 9 th March 2005<br />

and made effective on the 20 th May 2005. The <strong>Project</strong> is scheduled to be completed by the end <strong>of</strong><br />

March, 2009.<br />

The last State Level Review Meeting was convened on the 9 th February 2007 at Jabalpur and the<br />

last TPRM was held on the 21 st March 2007.<br />

The last ADB interim review mission was conducted on the 6 th December 2006, for completing a<br />

review <strong>of</strong> the e-tendering process and to discuss procurement issues.<br />

This report details progress completed during the course <strong>of</strong> the project throughout the seventh<br />

quarterly reported period to 30 th June 2007.<br />

1.1 <strong>Project</strong> Background<br />

Over the last few decades, the size <strong>of</strong> the population <strong>of</strong> the cities has expanded, due mainly to<br />

urban bound migration trends, which has dramatically increased population in core areas, existing<br />

settlements and newly developed settlements, leading to heavily congested urban in and peri-urban<br />

areas. This has resulted in a marked upsurge in demand <strong>of</strong> the inadequately suited infrastructure<br />

services, particularly in the areas <strong>of</strong> potable water supplies, wastewater, stormwater drainage and<br />

solid waste management. These urban services have not been developed in line with the demands<br />

<strong>of</strong> the ever expanding urbanization. Slum areas have also expanded at alarming rates, within the<br />

peri-urban and core urban areas, whereby access to basic urban services has been further<br />

restricted.<br />

Presently water is generally supplied for only a few hours each day during the wet season and in<br />

some cases less during the dry season. Non-revenue water accounts for as much as 60% <strong>of</strong> the<br />

water produced, exacerbating water shortages and increasing supply costs. Inadequate sanitation<br />

and sewerage facilities result in environmental pollution and public health problems. Streets, drains<br />

and open areas are littered with waste, which affects public health due to inadequate solid waste<br />

management facilities and practices. All these deficiencies are serving as serious constraints to<br />

future growth potentials and adversely affecting economic development.<br />

1.2 Brief <strong>Project</strong> Description<br />

The Urban Water Supply and Environmental Improvement <strong>Project</strong> (UWSEIP), in the state <strong>of</strong><br />

<strong>Madhya</strong> <strong>Pradesh</strong>, is an integrated urban infrastructure development project inclusive <strong>of</strong> institutional<br />

strengthening requirements. The <strong>Project</strong> is designed to establish and upgrade essential urban<br />

infrastructure and services particularly in the areas <strong>of</strong> potable water supplies, waste water<br />

management, drainage and solid waste. The project is being implemented in the four major cities <strong>of</strong><br />

Bhopal, Gwalior, Jabalpur and Indore.<br />

The primary objective <strong>of</strong> UWSEIP is to promote sustainable growth and poverty reduction in the four<br />

selection cities <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong> and thereafter in other cities in the state. The <strong>Project</strong> will finance<br />

infrastructure construction and rehabilitation related to solid waste management and stormwater<br />

drainage and capacity building <strong>of</strong> existing Municipal Corporations. Social and community<br />

development will form an important component <strong>of</strong> the <strong>Project</strong>, involving community mobilization,<br />

under well organized proactive public awareness campaigns.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

1


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

The <strong>of</strong>ficial start to the UWSEIP took place at the signing <strong>of</strong> the Contract Agreement between the<br />

<strong>Government</strong> <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong> and the Consultants on the 6 th June 2005. Mobilization <strong>of</strong> the PMC<br />

and DSC Consultant teams started 15 days later, on the 21 st June 2005. The BME consultant was<br />

mobilized on the 3 rd July 2006. The PR consultant was mobilized on the 9th September 2006.<br />

1.3 <strong>Project</strong> Objectives and Component Parts<br />

The principal objectives <strong>of</strong> the <strong>Project</strong> are to promote sustainable growth and poverty reduction in<br />

the four selection cities <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong> and thereafter in other cities in the state and will<br />

specifically involve the following objectives:<br />

• provide sustainable basic urban infrastructure and services to all citizens <strong>of</strong> the <strong>Project</strong> cities;<br />

• promote public participation and awareness in project implementation;<br />

• increase economic opportunities and reduce vulnerability to environmental, poverty and natural<br />

hazards; and<br />

• strengthen the capacities <strong>of</strong> the <strong>Project</strong> cities to plan and manage urban water supply and<br />

sanitation systems in more effective, transparent and sustainable manner.<br />

The project comprises <strong>of</strong> the three following component parts:<br />

• Part A: Urban Water Supply and Environment Improvement;<br />

• Part B: Urban Governance, Institutional Development and Public Participation; and<br />

• Part C: <strong>Project</strong> Implementation Assistance.<br />

While the <strong>Project</strong> will benefit the entire community in general, some components will focus on<br />

upgrading the conditions <strong>of</strong> the poorest or most needy groups in slums areas in particular. The<br />

project will also promote the active participation <strong>of</strong> women citizens in municipal management and<br />

project implementation, as both beneficiaries and agents.<br />

1.3.1 Part A: Urban Water and Environmental Improvement<br />

The Urban Water Supply and Environment Improvement component <strong>of</strong> the programme, covering the<br />

improvement and expansion <strong>of</strong> basic municipal infrastructure and services, includes the following:<br />

• urban water supply: optimization, expansion and augmentation;<br />

• sewerage and sanitation: conventional sewerage systems for high density core areas with lowcost<br />

maintenance waste treatment and appropriate on-site sanitation for lower density areas;<br />

• stormwater drainage: improved urban drainage networks; and<br />

• solid waste management: improved efficiency <strong>of</strong> collection and disposal through procurement <strong>of</strong><br />

equipment and the construction <strong>of</strong> sanitary landfill sites.<br />

1.3.2 Part B: Urban Governance and Institutional Development<br />

The Urban Governance, Institutional Development and Public Participation, which is designed to<br />

increase the awareness and participation <strong>of</strong> the <strong>Project</strong> beneficiaries in project implementation<br />

through the application <strong>of</strong> the Municipal Action Plan for Poverty Reduction (MAPPR) approach:<br />

• Area Improvement Fund (AIF): aimed at poorly served settlements, with inadequate<br />

infrastructure, which will attain integrated slum improvements through participatory planning.<br />

Funds to be available to the Municipal Corporation on an annual review basis. This component<br />

was deferred for DFID implementation, under the MPUSP programme, effectively from March<br />

2006 and reinstated in April 2007, and<br />

• Community Initiatives Fund (CIF): for the social sector inclusive <strong>of</strong> community facilities,<br />

education and income generation activities. This component was deferred for DFID<br />

implementation, under the MPUSP programme, effectively from March 2006 and reinstated in<br />

April 2007.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

2


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

• The Water for Asian Cities Programme in India covering urban water conservation and demand<br />

management, to be financed through parallel co-financing by United Nations Human<br />

Settlements Programme (UN-Habitat).<br />

1.3.3 Part C: Implementation Assistance<br />

The <strong>Project</strong> Implementation Assistance relates to activities directly attributable to implementation <strong>of</strong><br />

the <strong>Project</strong> and includes the management <strong>of</strong> the project along with the associated consultancy<br />

services.<br />

An Empowered Committee (EC) has been set up, with the Chief Secretary as the Chairperson. The<br />

EC is established as the overall approving authority for all matters related to the project on behalf <strong>of</strong><br />

the State <strong>Government</strong>. A City Steering Committee has been established to provide overall guidance<br />

to the respective PIU’s along with ensuring the required monitoring <strong>of</strong> <strong>Project</strong> implementation<br />

activities.<br />

The <strong>Project</strong> Management Unit (PMU), <strong>Project</strong> Management Consultant (PMC), the <strong>Project</strong><br />

Implementation Units (PIU's) and the Design and Supervision Consultant (DSC's) are responsible<br />

for ensuring the timely construction <strong>of</strong> identified contract packages, comprising one or more<br />

schemes, according to identified needs, in full adherence to quality control measures. The PMU,<br />

PMC, DSC's and PIU's will, through the required training and capacity building associated with the<br />

<strong>Project</strong>, ensure that the Urban Local Bodies (ULB's) will be able to take responsibility for the<br />

continued operation and maintenance <strong>of</strong> the newly-constructed or rehabilitated facilities.<br />

The present position, in respect <strong>of</strong> staff deployment status, for the PMU, PIU’s, PMC and DSC’s is<br />

given in Appendix-C.<br />

Refer to Section 3 for specific details <strong>of</strong> the status <strong>of</strong> the implementation arrangements related to<br />

the established project institutions and appointment <strong>of</strong> consultants to the programme.<br />

Refer to Section-7 for details <strong>of</strong> the associated project specific major ADB Loan Covenants, along<br />

with the status <strong>of</strong> compliance to date.<br />

1.4 Implementation Schedule<br />

The <strong>Project</strong> is to be implemented over a four year period from the date <strong>of</strong> loan effectiveness,<br />

scheduled for completion by 31 st March 2009. To minimize <strong>Project</strong> start-up delays, the ADB<br />

provided technical assistance for advance actions in preparation <strong>of</strong> the standard bidding documents,<br />

to establish tendering procedures, pre-qualification procedures and completion <strong>of</strong> the prequalification<br />

<strong>of</strong> contractors for the civil works programmes.<br />

Refer to Appendix-A, which gives comprehensive details <strong>of</strong> the implementation schedule and a<br />

current listing <strong>of</strong> all contract packages, to the present cost estimated status for all sectoral<br />

components <strong>of</strong> the respective project cities.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

3


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

2. FUND UTILIZATION<br />

The targets for disbursement <strong>of</strong> funds, throughout the course <strong>of</strong> the project period, are presented in<br />

terms <strong>of</strong> the combined cumulative accounting <strong>of</strong> the following elements:<br />

• Procurement and civil works, inclusive <strong>of</strong> taxes, price and physical contingences; and<br />

• PMU, PIU’s and consultancy services support, inclusive <strong>of</strong> associated taxes.<br />

Refer to Figure 2.1, which gives the targeted cut-<strong>of</strong>f for all design and bidding by October 2006,<br />

inclusive <strong>of</strong> procurement and civil works contracts. The start <strong>of</strong> implementation is scheduled,<br />

according to the programme given in Appendix-A, for the initial physical works, to start from June<br />

2006 onwards.<br />

2.1 <strong>Project</strong> Investment and Financing<br />

Refer to Table 2.1 for the present status <strong>of</strong> investment for the various components <strong>of</strong> each <strong>of</strong> the<br />

<strong>Project</strong> Cities, in comparison to that <strong>of</strong> the budget allocation, according to the <strong>Project</strong> Administration<br />

Memorandum (PAM), dated 24 th October 2005.<br />

2.1.1 <strong>Project</strong> Financing Plan<br />

The overall <strong>Project</strong> is estimated to cost a total investment amount <strong>of</strong> US$ 275 million. A summary <strong>of</strong><br />

the <strong>Project</strong> costs is given in Table 2.2, which gives a reconciliation <strong>of</strong> cost allocations according to<br />

the sector components and the implementation elements <strong>of</strong> Part A: Urban Infrastructure; Part B:<br />

Public Participation and Awareness; and Part C: Implementation Assistance.<br />

The initially used exchange rate <strong>of</strong> INRs.49.67 to the US$ has currently been revised, according to<br />

ADB advise, to INRs.41.00 to the US$, which is used in determining the current financial status <strong>of</strong><br />

the <strong>Project</strong> and in tracking <strong>of</strong> budget allocations as compared to current estimated costs.<br />

Currently the total investment according to the cost estimation for the programme stands at<br />

Rs.136,638 lakhs, which is 21.19% above that <strong>of</strong> the budget allocation <strong>of</strong> Rs.112,750 lakhs.<br />

2.1.2 Status <strong>of</strong> Counterpart & Co-financing <strong>of</strong> Funds<br />

The <strong>Government</strong> <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong> made the provision <strong>of</strong> Rs. 4,000 lakh for the year 2005/06 and<br />

Rs.1,100 lakh for the year 2006/07, towards counterpart funding.<br />

Each Municipal Corporation has been advised to arrange their contribution, in accordance with the<br />

Financing Plan <strong>of</strong> the overall <strong>Project</strong> investment is given in Table 2.3, whereby Asian Development<br />

Bank is to finance US$ 181 million under Loan No. 2046-IND.<br />

The balance, 34.18% amount, is to be co-financed by the <strong>Government</strong> <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong> for US$<br />

45.9 million (16.69%); the <strong>Project</strong> Cities for US$ 47.6 million (17.31%); and UN Habitat for US$ 0.5<br />

million (0.18%).<br />

The contribution made by the <strong>Government</strong> <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong> comprises front-end fees, interest<br />

during construction and commitment charges, inclusive <strong>of</strong> taxes and duties, 20% grant for Indore<br />

water supply, part consultancy costs and PMU establishment.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

4


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

2.1.3 Targeted Disbursement Schedule and Monitoring<br />

A cumulative total expenditure, to 30 th June 2007, amounts to Rs.5,931 lakh, which equates to<br />

5.26% <strong>of</strong> the overall approved fund <strong>of</strong> Rs.112,750 lakh (US$ 275 million). Referring to Figure 2.2,<br />

this shows a shortfall <strong>of</strong> 55.3%, according to the targeted expenditure <strong>of</strong> Rs.13,274 lakhs, which<br />

highlights that the upward trend <strong>of</strong> improved expenditure over the preceding quarter (47.7%<br />

shortfall) has not continued, with comparatively poor returns being made throughout the March to<br />

June 2007 reported period. The shortfall <strong>of</strong> the actual expenditure to that <strong>of</strong> the targeted would be<br />

explained by the following factors:<br />

• awaiting release <strong>of</strong> pending invoices remaining in the pipeline;<br />

• continued slippage in the anticipated start <strong>of</strong> contracts;<br />

• poor competitive bidding process to date giving rise to marked slippage; and<br />

• modification to the overall pattern <strong>of</strong> mobilization and deployment <strong>of</strong> consultant and support<br />

staff.<br />

2.2 Disbursements and Financial Statements<br />

2.2.1 ADB Cumulative Disbursements<br />

A cumulative The cumulative record <strong>of</strong> all previous ADB disbursements, inclusive <strong>of</strong> the reported<br />

quarter April to June 2007 against UWSEIP claims, is according to the financial statement given in<br />

Table 2.4, which gives a total <strong>of</strong> US$ equivalent <strong>of</strong> disbursements <strong>of</strong> US$6.176m to date.<br />

2.2.2 Financial Statements<br />

As per ADB guidelines, a financial statement <strong>of</strong> accounts is given in Appendix-E, for the UWSEIP<br />

MP Urban <strong>Project</strong> separately for the period ending 30 th June 2007, for the following:<br />

• Sources and applications <strong>of</strong> funds, for a closing balance <strong>of</strong> Rs.408.41 lakhs, refer to<br />

Table E-1; and<br />

• Withdrawal <strong>of</strong> loan proceeds totals Rs.250,300,439 and US$461,368, amounting to<br />

US$6.176m equivalent, refer to Table E-2.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

5


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

2.3 <strong>Project</strong> Costs<br />

2.3.1 Current Scope and <strong>Project</strong> Investment Status<br />

Refer to Table 2.5, which gives an overall summary <strong>of</strong> the progress status <strong>of</strong> the project to date, for<br />

Part A, Part B and Part C <strong>of</strong> the programme, for the urban infrastructural improvement and the<br />

community development respective elements in terms <strong>of</strong> the sector components. The total proposed<br />

investment, in terms <strong>of</strong> current estimated costs, amounts to Rs.103,894.52 lakhs for 101 contract<br />

packages, inclusive <strong>of</strong> 4 packages allocated for the community development component. The total<br />

estimated amount equates to 23% above that <strong>of</strong> the corresponding PAM budget allocation <strong>of</strong><br />

Rs.84,439.71 lakhs.<br />

2.3.2 <strong>Project</strong> Implementation Progress Status<br />

The project implementation progress to date is given according to a weighting, 30% for preimplementation<br />

stage and 70% for the implementation phase and associated activities. Progress<br />

has also been assessed in terms <strong>of</strong> a subjective appraisal <strong>of</strong> key activities for these stages, as<br />

monitored against a system <strong>of</strong> assigned weighted averages. Refer to Table 2.6, which shows an<br />

equivalent weighted average project progress status <strong>of</strong> 27%, as compared to an effective elapsed<br />

time <strong>of</strong> 54% in terms <strong>of</strong> total loan period.<br />

2.3.3 Variation <strong>of</strong> <strong>Project</strong> Costs to Budget Allocation<br />

The comparative variance <strong>of</strong> costs, as given in the Total <strong>Project</strong> Costs <strong>of</strong> the Implementation Tables<br />

Appendix-A, to that <strong>of</strong> the PAM allocated amount for the four cities is given as follows:<br />

Estimated Amount to date:<br />

(Inclusive <strong>of</strong> apportioned support<br />

costs, contingencies, and taxes)<br />

Totals<br />

Bhopal<br />

Gwalior<br />

Jabalpur<br />

Indore<br />

(US$ 333.26m)<br />

Rs.19,023 lakh: (21.07% increase)<br />

Rs.16,725 lakh (8.58% decrease)<br />

Rs.28,524 lakh (26.24% increase)<br />

Rs.72,367 lakh (28.89% increase)<br />

Rs.136,638 lakh<br />

(equivalent: average 21.19% increase)<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

6


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

3. STATUS OF IMPLEMENTATION ARRANGEMENTS<br />

The Executing Agency for the <strong>Project</strong> is the Urban Administration and Development Department<br />

(UADD) <strong>of</strong> the <strong>Government</strong> <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong>, represented by the <strong>Project</strong> Management Unit<br />

(PMU), which assumes overall responsibility for planning, management and monitoring <strong>of</strong> the<br />

<strong>Project</strong>, in ensuring the outcome <strong>of</strong> the project and its compliance with the Loan Covenants,<br />

governing the relationship between the Municipal Corporations <strong>of</strong> the State <strong>Government</strong> and the<br />

Asian Development Bank (ADB).<br />

Arrangements for <strong>Project</strong> implementation have been developed according to <strong>Government</strong> policies,<br />

under the 74 th Amendment to the Constitution in meeting the national objectives <strong>of</strong> decentralizing<br />

growth, strengthening the implementation and management capabilities <strong>of</strong> the Urban Local Bodies<br />

(ULB’s).<br />

The <strong>Government</strong> <strong>of</strong> <strong>Madhya</strong> <strong>Pradesh</strong> (GoMP) initiated the setting up <strong>of</strong> the required institutions in<br />

the preparatory stages <strong>of</strong> the <strong>Project</strong>. For details <strong>of</strong> the current project management and consultant<br />

staffing status, as <strong>of</strong> the 30 th June 2007, refer to Appendix-C.<br />

3.1 Formation <strong>of</strong> Committees<br />

As per the Loan Agreement with ADB, the UADD is established as the Executing Agency for the<br />

<strong>Project</strong>. Along with the establishment <strong>of</strong> the implementation arrangements, recruitment <strong>of</strong> all key<br />

staff members has been achieved in the majority <strong>of</strong> areas in attaining the overall management <strong>of</strong> the<br />

<strong>Project</strong>.<br />

3.1.1 Empowered Committee<br />

The Empowered Committee (EC) was set up on 11 th August 2004, with the Chief Secretary as the<br />

Chairperson.<br />

The EC is established as the overall approving authority for all matters related to the project on<br />

behalf <strong>of</strong> the State <strong>Government</strong> and convenes at least once every three months. The EC has been<br />

delegated with all powers <strong>of</strong> the Urban Development sector, PHED and Finance departments for<br />

implementation <strong>of</strong> projects, except decisions reserved for the Cabinet.<br />

Accordingly, the EC has been bestowed full authority to represent the State on all project issues,<br />

including establishing overall administrative and management <strong>of</strong> <strong>Project</strong> related policies, in<br />

approving all major decisions and sanctioning award <strong>of</strong> contracts.<br />

The EC convened during the course <strong>of</strong> the reported period, on the 3 rd May and the 26 th June 2007.<br />

3.1.2 City Level Steering Committee<br />

The City Level Steering Committee (CLSC) was set up in each <strong>of</strong> the <strong>Project</strong> cities on the 8 th June<br />

2004, with the Divisional Commissioner as the Chairperson.<br />

The committee includes, the Mayor, leader <strong>of</strong> the opposition in the Corporation, member Secretary<br />

<strong>of</strong> the State Pollution Control Board (SPCB), representative <strong>of</strong> Chamber <strong>of</strong> Commerce (CoC) and a<br />

prominent women social worker.<br />

The CLSC has convened periodically in reviewing the <strong>Project</strong> and effectively coordinating work<br />

within each city.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

7


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

3.2 Formation <strong>of</strong> <strong>Project</strong> Management and Implementation Units<br />

3.2.1 <strong>Project</strong> Management Unit<br />

The <strong>Project</strong> Management Unit (PMU) has been established at the State level with the <strong>Project</strong><br />

Director and support staff in place. The PMU is now being expanded to suite growing <strong>Project</strong><br />

demands to a potential complement <strong>of</strong> 50 members (including a total <strong>of</strong> 24 support staff).<br />

The PMU is responsible for the coordination and management <strong>of</strong> all <strong>Project</strong> activities, including<br />

<strong>Project</strong> design, implementation, budgeting and financial planning, benefit monitoring and evaluation<br />

activities, socioeconomic surveys, environmental assessment and protection, institutional and policy<br />

development, community participation activities, related training, and coordinating the work <strong>of</strong> all<br />

consulting services under the <strong>Project</strong>.<br />

3.2.2 <strong>Project</strong> Implementation Unit<br />

Although the <strong>Project</strong> Implementation Units (PIU’s) have long since been established, they remain<br />

under-resourced and operate at various degrees <strong>of</strong> effectiveness in the four <strong>Project</strong> cities.<br />

Implementation <strong>of</strong> the different infrastructure components has now been taken up by the PIU's, who<br />

are supported by the DSC’s, and responsible for coordinating, supervising, implementing,<br />

monitoring and reporting on the <strong>Project</strong> progress to the PMU.<br />

3.2.3 Technical and Tender Evaluation Committees<br />

A Technical Evaluation Committee (TEC) has been established, headed by the PD for evaluation <strong>of</strong><br />

all PMU central procurement packages and approval by TE&AC <strong>of</strong> all tenders up to Rs.2 crore or by<br />

EC for all tenders exceeding Rs.2 crore. A Bid Opening and Evaluation Committee (BO&EC) has<br />

been established at the PIU level for all packages, other than PMU central procurement packages.<br />

A Technical Clearance Committee (TCC) has been established at the PMU level, chaired by the PD<br />

PMU for clearance <strong>of</strong> all design reports and bid documents as prepared by PIU’s and approval by<br />

MIC thereafter.<br />

A Tender Evaluation and Approval Committee (TE&AC) has been established headed by the<br />

Principal Secretary, UADD, for clearance <strong>of</strong> all tenders up to Rs.2 crore, MIC approval thereafter.<br />

For all tenders exceeding Rs.2 crore, clearance is completed by the EC and approval by MIC<br />

thereafter.<br />

3.3 Formation <strong>of</strong> the Support Consultants<br />

3.3.1 <strong>Project</strong> Management Consultant<br />

The PMU is being assisted by the <strong>Project</strong> Management Consultant (PMC), by Louis Berger Group<br />

Inc, effectively appointed on the 21 st June 2005. Mobilization <strong>of</strong> the compliment <strong>of</strong> experts and<br />

support staff has been conducted according to the requirements <strong>of</strong> the programme and in<br />

compliance with their agreed mobilization schedule.<br />

To date, the PMC has completed 24.33 months <strong>of</strong> services, equivalent to 54% <strong>of</strong> elapsed time <strong>of</strong> the<br />

overall contracted period, in assisting the PMU in all project related activities, including<br />

management, supervisory roles, monitoring and coordinating the works <strong>of</strong> the PIU’s and DSC’s,<br />

attached to the respective Municipal Corporations.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

8


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

In completion <strong>of</strong> the consultancy services, the PMC has expended a total <strong>of</strong> 320.75 man-months,<br />

inclusive <strong>of</strong> 175.53 man-months <strong>of</strong> support staff, which equates to an overall 40% <strong>of</strong> the total utilized<br />

contracted man-month output. For full details <strong>of</strong> the PMC staffing status and revised mobilization<br />

schedule to date, refer to Appendix-E.<br />

3.3.2 Design and Supervision Consultants<br />

The PIU’s are being assisted by the Design and Supervision Consultants (DSC’s), who are<br />

responsible for design inputs, and the day-to-day management/supervision <strong>of</strong> contractor-based<br />

activities and were effectively appointed on the 21 st June 2005. . Each <strong>of</strong>fice unit has a compliment<br />

<strong>of</strong> experts for water supply, wastewater, solid waste management and community development. As<br />

the design stage nears completion, the design team <strong>of</strong> experts for each city has been demobilized.<br />

DSC (East): TCE DSC(E) was effectively appointed on the 21 st June 2005. TCE Consulting<br />

Engineers Ltd (TCE) has established three <strong>of</strong>fice units, alongside the PIU’s at each <strong>of</strong> cities <strong>of</strong><br />

Bhopal, Gwalior and Jabalpur, with a Deputy Team Leader deployed at each <strong>of</strong> the cities, and the<br />

Team Leader deployed at the Bhopal <strong>of</strong>fice unit. However, mobilization <strong>of</strong> the compliment <strong>of</strong> experts<br />

and support staff has been found to be unsatisfactory.<br />

DSC (West): STC DSC(W) were effectively appointed on the 21 st June 2005. Shah Technical<br />

Consultant (STC) has established an <strong>of</strong>fice unit alongside the PIU at Indore and are fully<br />

operational, initially with the Team Leader, a Deputy Team Leader and the required experts in place<br />

to cover the design stage. This has been since changed to the deployment <strong>of</strong> the TL and<br />

supervisory staff in covering the site supervision stage. Mobilization <strong>of</strong> the compliment <strong>of</strong> experts<br />

and support staff has been conducted according to the requirements <strong>of</strong> the programme and in<br />

compliance with their agreed mobilization schedule.<br />

3.3.3 Public Relation Consultant<br />

The Public Relation Consultant (PRC) is to assist the PIU’s in all aspects <strong>of</strong> public awareness and<br />

participation programmes, which will be operational for the four <strong>Project</strong> cities. The PRC contract<br />

signing took place on the 9 th September 2006. The PRC subsequently started their work by<br />

establishing initial <strong>of</strong>fice space within the PMU on the 25 th September 2006.<br />

During the course <strong>of</strong> the reported period the PRC have continued with the preparation <strong>of</strong> IEC<br />

material, including the phone in live air talk shows. In addition, particulars <strong>of</strong> the Public Relations<br />

and Awareness Programme (PRAP) interventions have been detailed, inclusive <strong>of</strong> identification <strong>of</strong><br />

community level programmes in the form <strong>of</strong> data sheets jointly prepared with the community<br />

development experts <strong>of</strong> the DSC(E).<br />

3.3.4 Benefit Monitoring and Evaluation Consultant<br />

The Benefit Monitoring and Evaluation Consultant (BMEC) started with one team member in place<br />

on the 3 rd July 2006 and subsequently mobilized with the Team Leader in station on the 10 th July<br />

2006, for a ten day period only. Initial coordinating meetings were held with the BMEC on the 12 th<br />

July 2006; whereby the overall work plan and the progress made to date, with regard to preparation<br />

<strong>of</strong> the BME Plan, were discussed.<br />

The BMEC submitted a “Final BME Plan” on the 29 th August 2006, which was found to be <strong>of</strong> a<br />

substandard quality, for which a comprehensive list <strong>of</strong> comments were given by the PMU for<br />

ensuring the required improvement.<br />

The BMEC have since edited revised version <strong>of</strong> the BME Plan for each <strong>of</strong> the cities, incorporating a<br />

list <strong>of</strong> key measurable baseline indicators, which were presented to the PMU in early April 2007.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

9


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

4. PROJECT AND IMPLEMENTATION PROGRESS<br />

4.1 Overview <strong>of</strong> Activities to date<br />

4.1.1 Infrastructural Improvement<br />

An overall summary <strong>of</strong> the progress status, in terms <strong>of</strong> the sector components <strong>of</strong> the project, as on<br />

the 30 th June 2007, as referred in Table 2.5, includes a total <strong>of</strong> 101 contract packages; comprising 4<br />

nos. slum upgrading; 55 nos. water supply; 11 nos. wastewater/sanitation packages; 30 nos. solid<br />

waste management packages, inclusive <strong>of</strong> 26 PMU centrally procured packages; and 1 no. drainage<br />

package; for a total estimated amount <strong>of</strong> Rs.103,894.52 Lakh, equivalent to 23% above that <strong>of</strong> the<br />

PAM allocated budget amount for the programme.<br />

Detailed Design Reports have been completed for 93 contract packages; comprising 52 nos. water<br />

supply, 11 nos. wastewater/sanitation packages, 29 nos. solid waste management packages and 1<br />

no. drainage package, for a total estimated amount <strong>of</strong> Rs.93,365 Lakh, equivalent to 90% <strong>of</strong> the<br />

overall programme.<br />

To date, Invitation for Bids have been issued for 88 contract packages; comprising 49 nos. water<br />

supply, 10 nos. wastewater/sanitation packages and 29 nos. solid waste management packages for<br />

a total estimated amount <strong>of</strong> Rs.89,749 Lakh, equivalent to 86% <strong>of</strong> the overall programme.<br />

Award <strong>of</strong> contract has been issued for 58 contract packages; comprising 29 nos. water supply, 4<br />

nos. wastewater/sanitation packages and 25 nos. solid waste management packages for a total<br />

estimated amount <strong>of</strong> Rs.28,138 Lakh, equivalent to 27% <strong>of</strong> the overall programme.<br />

Refer to Table 4.1 for the city-wise progress status <strong>of</strong> the infrastructural development programme to<br />

date, which gives a distribution <strong>of</strong> the contract packages and costs according to Bhopal with 29<br />

contract packages at an estimated amount <strong>of</strong> Rs. 13,077.73 lakh; Gwalior with 12 contract packages<br />

at an estimated amount <strong>of</strong> Rs. 11,433.04 lakh; Jabalpur with 22 contract packages at an estimated<br />

amount <strong>of</strong> Rs. 20,826.63 lakh; and Indore with 34 contract packages at an estimated amount <strong>of</strong> Rs.<br />

55,397.11 lakh.<br />

Refer to Table 4.2 for details <strong>of</strong> the procurement contracts, which have been implemented under<br />

central procurement through the PMU, 18 packages have been allotted a separate ADB PCSS<br />

reference number. However, the contracts have been further subdivided according to distribution <strong>of</strong><br />

the materials and equipment to the respective city corporations, which has effectively given rise to a<br />

total <strong>of</strong> 29 itemized contracts, as referenced in the left-hand side column <strong>of</strong> the Table. Hence, to<br />

date, the delivery <strong>of</strong> materials and equipment has been completed for 28 itemized contract<br />

packages, comprising 3 nos. wastewater/sanitation packages and 25 nos. solid waste management<br />

packages for a total estimated amount <strong>of</strong> Rs.1,333 Lakh, equivalent to 1.3% <strong>of</strong> the overall<br />

programme. Package PMU/SWM/02/BPL-L4 has yet to be awarded.<br />

4.1.2 Social and Community Development<br />

The AIF/CIF component, for slum improvement and development initiatives, was deferred for DFID<br />

implementation, under the MPUSP programme, effectively from March 2006. However, the<br />

component was reinstated during April 2007, under an executive decision at GoMP level, with the<br />

proposal for including community managed water supply and sanitation schemes.<br />

These schemes will be identified for location within suitably selected slum areas, which fall outside<br />

<strong>of</strong> the overall water supply coverage boundaries under presently proposed urban infrastructural<br />

development programmes.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

10


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

4.1.3 Financial Improved Management<br />

The PMU continued to assist the city corporations in the formulation <strong>of</strong> their respective Financial<br />

Improvement Action Plans (FIAP’s); in accordance with the provisions <strong>of</strong> ADB guidelines, including<br />

accounting and budgeting reforms. The timeframe and scheduled dates <strong>of</strong> the FIAP have been<br />

revised allowing for the late signing <strong>of</strong> the Loan Agreement.<br />

The city corporations are to endorse and amend as appropriate with the consent <strong>of</strong> ADB, the State<br />

and GOI. The FIAP’s have now been translated into Hindi and circulated to all MC’s for ensuring<br />

effective monitoring.<br />

4.1.4 Institutional Governance<br />

Further refinements were made to the draft Urban Development Policy document, with the Urban<br />

Land Policy attached to the document. Representative text in the form <strong>of</strong> an executive summary <strong>of</strong><br />

the entire document has been prepared, which is due for translation into Hindi.<br />

The Urban Development Policy and Urban Land Policy are identified as the most important aspects<br />

<strong>of</strong> the overall institutional and governance reforms <strong>of</strong> the project, which is intrinsically related to the<br />

quality <strong>of</strong> implementation and the sustainability <strong>of</strong> development in the project towns.<br />

4.2 Pre-implementation Activities<br />

4.2.1 Imparted Training<br />

As the implementation <strong>of</strong> the civil works gets underway, initial training was arranged at the project<br />

cities, in Indore on the 23 rd March 2007, in Gwaloir on the 10 th April 2007, in Jabalpur on the 13 th<br />

April 2007 and in Bhopal on the 17 th April 2007 for ensuring the required understanding and<br />

compliance to all QA/QC procedures and issues.<br />

The training was imparted for all concerned supervisory personnel <strong>of</strong> the PMU, DSC(W), PIU, MC<br />

staff and other related departments, including members <strong>of</strong> the PHED, as appropriate. The<br />

concerned contractors, <strong>of</strong> contracts presently under implementation, inclusive <strong>of</strong> the contractors <strong>of</strong><br />

the awarded contracts, attended the training.<br />

Further training will be organized in due course for training <strong>of</strong> trainers at the PIU level so that<br />

sustainable training will be completed as more contractors are inducted to the programme.<br />

Additional training is to be organized for the full understanding <strong>of</strong> and compliance with the Health<br />

and Safety procedures, inclusive <strong>of</strong> identification <strong>of</strong> contract specific risks and the preparation <strong>of</strong><br />

related mitigations and associated Risk Assessment Analysis.<br />

4.2.2 Tendering Process and e-Tendering<br />

During the reported period work was continued by the appointed service provider, M/s abcprocure,<br />

in the preparation <strong>of</strong> uploaded documents for conducting the online bidding processes, inclusive <strong>of</strong><br />

post bid notification <strong>of</strong> evaluations on the web. In coordination with the respective PIU’s, a total <strong>of</strong><br />

57 contract documents, inclusive <strong>of</strong> the preparation <strong>of</strong> pre-qualification forms and financial bid<br />

forms, have been completed.<br />

In terms <strong>of</strong> e-tendering activities for the respective cities, this comprises 18 contracts for Bhopal,<br />

inclusive <strong>of</strong> 4 contracts for re-bidding (BPL/WS/05, BPL/WS/07, BPL/WS/08 and BPL/WS/12); 7<br />

contracts for Gwalior and no re-bidding; 21 contracts for Jabalpur, inclusive <strong>of</strong> 2 contracts for re-<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

11


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

bidding (JPL/WS/12 and JBP/WS/02); and 11 contracts for Indore, inclusive <strong>of</strong> one contract for rebidding<br />

(IND/SWM/05), refer to Appendix-D for details.<br />

4.2.3 Outstanding Clearance Issues<br />

The PMC/PMU continued to monitor the progress made by the PIU’s and DSC’s regarding advance<br />

actions and preparatory works for obtaining all necessary environmental clearances from M.P.<br />

Pollution Control Board, land acquisitions, clearance from Forest Department to use their land,<br />

clearance from Railways and Road authorities for crossing pipes.<br />

However, the process and interactions with the various agencies, as given in Appendix B, is taking<br />

unacceptable long periods <strong>of</strong> time to finalize, with vary little noticeable progress being made during<br />

the reported period.<br />

4.2.4 Topographical Survey Work<br />

All sub-project related topographical survey work; inclusive <strong>of</strong> submission <strong>of</strong> survey reports, have<br />

now been completed and submitted by the survey agencies.<br />

4.2.5 Proposed Deferral <strong>of</strong> Contracts to JN-NURM<br />

In containing the overall investment to within the PAM budget allocations, a number <strong>of</strong> projects,<br />

according to sector development <strong>of</strong> the <strong>Project</strong> Cities, are to be deferred to the JN-NURM<br />

programme for Bhopal, Jabalpur and Indore. GMC have already deferred all their civil works<br />

wastewater and drainage packages for implementation to UIDSSMT.<br />

A total number <strong>of</strong> 11 contract packages, including 3 procurement packages, have also been<br />

<strong>of</strong>ficially deferred to the JN-NURM implementation. Four more packages, one for BMC and 3 for<br />

IMC, are being considered for deferral, as given in Table 4.3.<br />

The resulting percentage variation <strong>of</strong> the current contract amounts, to that <strong>of</strong> the PAM allocation,<br />

has been given for the two scenarios <strong>of</strong> included and excluded from the programme. The resultant<br />

number <strong>of</strong> contract packages, inclusive <strong>of</strong> CIF/AIF contracts, would stand at 78 contracts,<br />

comprising 29 procurement, 45 civil works contracts and 4 AIF/CIF contracts.<br />

4.2.6 <strong>Project</strong> Performance Management System<br />

The Draft PPMS was finalized during the course <strong>of</strong> the reported period, which includes the following:<br />

• impact assessment indicators;<br />

• monitoring <strong>of</strong> the physical progress for the components <strong>of</strong> the infrastructure works, inclusive <strong>of</strong><br />

water supply, wastewater and sanitation, solid waste management, and stormwater drainage;<br />

• aspects <strong>of</strong> the institutional development and capacity building;<br />

• social and community development dimension;<br />

• financial and accounting improvement aspects;<br />

• all public health and hygiene related aspects;<br />

• requisite and related correlated functions and features; and<br />

• other related aspects pertaining to the overall institutional and environmental improvement<br />

components.<br />

A system <strong>of</strong> assessing progress <strong>of</strong> the overall project in terms <strong>of</strong> weighted averages has been<br />

included in accordance with the key monitoring elements <strong>of</strong> the project as given in the PAM<br />

document, refer to Table 2.6.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

12


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

4.2.7 <strong>Project</strong> Status Progress Meetings<br />

Regular PMU level project review meetings, chaired by the Principal Secretary, have been held<br />

each month during the course <strong>of</strong> the reported period to discuss progress status and related issues.<br />

The following additional project progress status and monitoring meetings were held during the<br />

reported quarter:<br />

• TCC convened twice on the 2 nd April and the 16 th May 2007;<br />

• TE&AC was convened three times on the 3 rd April, 5 th May and 8 th June 2007;<br />

• Empowered Committee convened twice on the 3 rd May and 23 rd June 2007;<br />

• The last State Level Review Meeting was held on the 9 th February 2007 in Jabalpur; and<br />

• The last TPRM was held on the 21 st March 2007.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

13


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

5. URBAN WATER SUPPLY AND ENVIRONMENTAL IMPROVEMENT<br />

The Urban Water Supply and Environment Improvement component forms Part A <strong>of</strong> the<br />

programme, covering the improvement and expansion <strong>of</strong> basic municipal infrastructure and services<br />

and includes the following:<br />

• urban water supply: optimization, expansion and augmentation;<br />

• sewerage and sanitation: conventional sewerage systems for high density core areas with lowcost<br />

maintenance waste treatment and appropriate on-site sanitation for lower density areas;<br />

• stormwater drainage: improved urban drainage networks; and<br />

• solid waste management: improved efficiency <strong>of</strong> collection and disposal through procurement <strong>of</strong><br />

equipment and the construction <strong>of</strong> sanitary landfill sites.<br />

5.1 Urban Water Supply<br />

Refer to Table 5.1 for the city-wise progress <strong>of</strong> the water supply component <strong>of</strong> the project, which<br />

comprises 55 contract packages for a total estimated amount <strong>of</strong> Rs. 82,786.69 lakh, equating to<br />

51.7% above the PAM allocated amount. To date, all concept reports have been collectively<br />

reviewed by the PMU and conditionally approved, subject to incorporation <strong>of</strong> the given comments<br />

into the design reports.<br />

Design Reports have been prepared for 52 packages for an investment <strong>of</strong> Rs. 75,626.69 lakh, which<br />

is 91% <strong>of</strong> the overall water supply allocation. Bidding documents for these contract packages are<br />

under various stages <strong>of</strong> preparation, with invitation for bids given for 49 contract packages, for an<br />

investment <strong>of</strong> Rs.73,681.89 lakh, equating to 89% <strong>of</strong> the overall water supply programme.<br />

Contracts have been awarded for 29 packages for an investment <strong>of</strong> Rs. 26,559.11 lakh, which is<br />

32.08% <strong>of</strong> the overall water supply programme. To date, no water supply contracts have been<br />

completed.<br />

5.1.1 BMC Water Supply Pre-Construction<br />

The overall cost estimate <strong>of</strong> the 11 water supply contract packages for Bhopal amounts to Rs.<br />

5,166.30 lakh, equating to 6% below the allocated amount. To date, all concept reports, design<br />

reports and bidding documents have been approved, out <strong>of</strong> which invitation for bids have been<br />

prepared for 10 packages for an investment <strong>of</strong> Rs. 5,094.80 lakh, which is 99% <strong>of</strong> the overall water<br />

supply allocation.<br />

Award <strong>of</strong> contracts have been given for the below listed contracts, to the given dates, for the 5 civil<br />

works contract packages and one International Shopping procurement package, for a total<br />

estimated amount <strong>of</strong> Rs.2,753.85 lakh, equating to 53% <strong>of</strong> the overall water supply programme:<br />

BPL/WS/01 IS 29-04-07 Phase I: Supply and install bulk Meters<br />

BPL/WS/02 LCB IR 13-03-07 Rehab RWPS (5 Nos), CWPS (2 Nos), Rising Mains<br />

BPL/WS/03 LCB IR 13-03-07 Rehabilitation <strong>of</strong> WTPs by Upper Lake<br />

BPL/WS/06 LCB IR 06-06-07<br />

Distribution: uPVC/DI, 100-450mm dia.: Bairagarh Area<br />

(Wards 1, 2, 3, & 4)<br />

BPL/WS/09<br />

LCB<br />

RCC OHSR 7.75 ML (Aradhanangr, Nehru Nagar, Kotra &<br />

13-03-07<br />

TK<br />

Vijay Nagar)<br />

BPL/WS/10 ICB TK 13-03-07 RCC OHSR 6.0 ML (Shahpura, Ibrahimpura & Koefiza)<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

14


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

BMC has three pending clearances related to the water supply sector; two related to contract<br />

package BPL/WS/10, which are due for completion by the middle <strong>of</strong> July 2007; and one related to<br />

contract package BPL/WS/09, which is due for completion by the middle <strong>of</strong> September 2007refer, to<br />

Appendix-B for the details.<br />

5.1.2 BMC Water Supply Construction Phase<br />

Of the 5 awarded civil works contracts, work has progressed as follows:<br />

Package no. BPL/WS/01 Supply and install bulk water meters<br />

Name <strong>of</strong> Contractor: M/s Krohne Marshall, Pune<br />

Cost <strong>of</strong> Contract:<br />

Rs. 91.60 lakh<br />

Date <strong>of</strong> Award: 14.05.07<br />

Time <strong>of</strong> completion: 9 Months<br />

Works includes:<br />

Supply, Installation and Maintenance <strong>of</strong> Electromagnetic<br />

Flow Meters 13 Nos. + 2 Nos. (Portable)<br />

Work recently awarded. The contractor firm has submitted<br />

work plan which is under process pf approval by PIU/DSC.<br />

Package no. BPL/WS/02 Rehab RWPS (5 Nos), CWPS (2 Nos), Rising Mains.<br />

Name <strong>of</strong> Contractor: M/s Asiatic Traders, Indore<br />

Cost <strong>of</strong> Contract:<br />

Rs. 644.85 lakh<br />

Date <strong>of</strong> Award: 03.04.2007<br />

Time <strong>of</strong> completion: 12 Months<br />

Works includes:<br />

Rehabilitation <strong>of</strong> RWPS (5 nos.), CWPS (2 nos.) and 3 km<br />

Raw Water Rising mains.<br />

Work plan submitted by the contractor firm has been<br />

approved by PIU/DSC. Part Design /Drawings submitted by<br />

the contractor firm have also been approved by PIU/DSC &<br />

remaining are under process <strong>of</strong> either submission or<br />

checking etc.<br />

Package no. BPL/WS/03 Rehabilitation <strong>of</strong> 7 existing water treatment plants around<br />

upper lake.<br />

Name <strong>of</strong> Contractor: M/s Hydro-Tech Enterprises Pvt. Ltd, Delhi<br />

Cost <strong>of</strong> Contract:<br />

Rs. 410.87 lakh<br />

Date <strong>of</strong> Award: 03.04.2007<br />

Time <strong>of</strong> completion: 12 Months<br />

Works includes:<br />

Rehabilitation <strong>of</strong> existing 7 WTP’s.<br />

The contractor firm has started construction <strong>of</strong> central <strong>of</strong>fice<br />

building and has also submitted part work plan and working<br />

drawings, which have been approved by the PIU/DSC.<br />

Remaining work plan and working drawings are under<br />

process <strong>of</strong> either submission or checking etc.<br />

Package no. BPL/WS/09 Design & Construction <strong>of</strong> RCC elevated service reservoirs at<br />

various locations in Bhopal.<br />

Name <strong>of</strong> Contractor: M/s Brij Engineering works, Kanpur<br />

Cost <strong>of</strong> Contract:<br />

Rs. 350.70 lakh<br />

Date <strong>of</strong> Award: 03.04.2007<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

15


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

Time <strong>of</strong> completion:<br />

Works includes:<br />

4 RCC elevated service reservoirs.<br />

Work plan submitted by the contractor firm has been<br />

approved by PIU/DSC. Work on testing <strong>of</strong> SBC <strong>of</strong> Soil has<br />

started at all the 4 places. Results <strong>of</strong> Kotra & Nehrunagar<br />

sites have already been received along with their design &<br />

drawings, Some discrepancies have been found in the<br />

design by the checking agency, which have been referred<br />

back to the contractor firm. Excavation work for foundation<br />

at Kotra Site has almost been completed.<br />

Package no. BPL/WS/10 RCC OHSR (Shahpura, Ibrahimpura & Koh-e- fiza).<br />

Name <strong>of</strong> Contractor: M/s Gleg Engineers Pvt. Ltd., Mumbai<br />

Cost <strong>of</strong> Contract:<br />

Rs. 242.79 lakh<br />

Date <strong>of</strong> Award: 03.04.2007<br />

Time <strong>of</strong> completion: 15 Months<br />

Works includes:<br />

2 RCC elevated reservoirs & 1 RCC ground level reservoir<br />

5.1.3 GMC Water Supply Pre-Construction<br />

Work plan submitted by the contractor firm has been<br />

approved by PIU/DSC. The contractor firm has established<br />

its <strong>of</strong>fice in a rented building in Lalghati area. Work <strong>of</strong> finding<br />

safe bearing capacity <strong>of</strong> soil has also been completed at the<br />

two sites, Koh-e-fiza and Shahpura.<br />

The overall cost estimate <strong>of</strong> the 11 water supply contract packages for Gwalior amounts to Rs.<br />

11,389.48 lakh, equating to 83% above the PAM allocated amount. To date, all concept reports,<br />

design reports and bidding documents have been approved, out <strong>of</strong> which invitation for bids have<br />

been prepared for 10 contract packages, amounting to Rs. 11,262.98 lakh and 99% <strong>of</strong> the overall<br />

programme.<br />

Award <strong>of</strong> contract have been given for the below listed contracts, to the given dates, for 2<br />

International Shopping procurement contract packages and 5 civil works contract packages, for a<br />

total estimated amount <strong>of</strong> Rs.5,388.79 lakh, equating to 47% <strong>of</strong> the overall water supply programme:<br />

GWL/WS/01 IS 30-09-06 Supply/install bulk meters (19 Nos.) & (bulk con. 6 Nos.)<br />

GWL/WS/05 IS 12-03-07 Phase II: 1,088 Nos. Con Meters: Non-Dom & Dom >1/2”<br />

GWL/WS/02 LCB IR 26-10-06 Rehab & Rectification <strong>of</strong> WTPs (2 Nos.) & CWPS (2 Nos.)<br />

GWL/WS/07 LCB IR 12-03-07 Rehab 600mm dia. CI Transmission Main: old WTP at<br />

Motijheel to Amkho OH Reservoir<br />

GWL/WS/08 LCB IR 16-03-07 OHSR’s, Sump at Lashkar East; Sump at Guda Pahad<br />

GWL/WS/11 LCB TK 27-01-07 WTP & Pump Hs (45 MLD)<br />

GWL/WS/12 LCB IR 12-03-07 Tighara Transmission main and feeder mains<br />

GMC has completed all four required clearances pertaining to the water supply contract packages,<br />

refer to Appendix–B.<br />

5.1.4 GMC Water Supply Construction Phase<br />

Of the 7 awarded contracts, work has progressed as follows:<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

16


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

Package no. GWL/WS/01 Supply and install bulk meters 25 Nos.<br />

Name <strong>of</strong> Contractor: M/s Krohne Marshall Pvt. Ltd. Pune<br />

Cost <strong>of</strong> Contract:<br />

Rs. 119.14 lakh<br />

Date <strong>of</strong> Award: 16 .10.2007<br />

Time <strong>of</strong> completion: 9 Months<br />

Works includes: Supply, Installation and Maintenance <strong>of</strong> 25 Nos.<br />

Electromagnetic flow meters.<br />

Material is ready. Third Party Inspection has been done.<br />

Dispatches will be received in the month <strong>of</strong> July 07. First<br />

meter is likely to be installed around 10 th July, 07.<br />

Package No. GWL/WS/05 1,088 Nos. Consumer Meters: Non-Dom & Dom above 1/2".<br />

Name <strong>of</strong> Contractor: M/s Chetas Control Systems Pvt. Ltd.<br />

Cost <strong>of</strong> Contract:<br />

Rs. 42.64 lakh<br />

Date <strong>of</strong> Award: 6 . 03.2007<br />

Time <strong>of</strong> completion: 12 Months<br />

Works includes:<br />

Supply, Installation and testing etc. <strong>of</strong> multi-Jet magnetically<br />

coupled water meters:<br />

- 15 mm 981<br />

- 20 mm 51<br />

- 25 mm 31<br />

- 50 mm 25<br />

Supply was dispatched from Italy about two week’s back<br />

and has reached India now. At present it is lying in the<br />

Mumbai Customs <strong>of</strong>fice for clearance.<br />

Package no. GWL/WS/02 Rehab and Rectification <strong>of</strong> WTPs (2 Nos.) and CWPS (2<br />

Nos.)<br />

Name <strong>of</strong> Contractor: M/s Subhash <strong>Project</strong>s & Maketing Ltd., Kolkata<br />

Cost <strong>of</strong> Contract:<br />

Rs. 864.61 lakh<br />

Date <strong>of</strong> Award: 26.10.2007<br />

Time <strong>of</strong> completion: 12 months<br />

Works includes:<br />

Rehabilitation <strong>of</strong> Civil, Mechanical and Electrical works.<br />

The contractor firm has delayed the work. But now sufficient<br />

progress has been made in the month <strong>of</strong> June 07. Cement<br />

grouting <strong>of</strong> 6 out <strong>of</strong> 22 filter beds and waste water sump has<br />

been completed. Work <strong>of</strong> changing filter media is under<br />

progress. Kova treatment <strong>of</strong> pump houses has also been<br />

done. Fencing work under progress Drawings <strong>of</strong> all<br />

mechanical & Electrical works have been approved by<br />

PIU/DSC. Drawings <strong>of</strong> Civil works submitted by the<br />

contractor firm are under process <strong>of</strong> checking / approval etc.<br />

by PIU/DSC. Third party Inspection <strong>of</strong> Transformers & all<br />

other electrical appliances has been completed. Essentially<br />

certificate is awaited.<br />

Package no. GWL/WS/07<br />

Rehab <strong>of</strong> 600mm dia. CI Transmission Main: old WTP at<br />

Motijheel to Amkho OH Reservoir.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

17


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

Name <strong>of</strong> Contractor: M/s Vishwa Infrastructures & Services Pvt. Ltd,<br />

Secunderabad<br />

Cost <strong>of</strong> Contract:<br />

Rs. 577.95 lakh<br />

Date <strong>of</strong> Award: 10.03. 2007<br />

Time <strong>of</strong> completion: 12 Months<br />

Works includes:<br />

700mm dia. DI pipeline for 6,450m length.<br />

Essentiality certificate has been issued. Third party<br />

inspection for 1000m Pipes has already been done, out <strong>of</strong><br />

which 500m have since been received at site.<br />

Package no. GWL/WS/08 Design & Construction <strong>of</strong> RCC Reservoirs.<br />

Name <strong>of</strong> Contractor: M/s Nirman, Bhavnagar in JV with M/s Gleg Engineers Pvt.<br />

Ltd. Mumbai.<br />

Cost <strong>of</strong> Contract:<br />

Rs. 1275.22 lakh<br />

Date <strong>of</strong> Award: 16. 03.2007<br />

Time <strong>of</strong> completion: 15 months<br />

Works includes: Construction <strong>of</strong> 11 ESR and 4 GSR (capacity 1.1 ml to 5.0<br />

ml in Gwalior town).<br />

Work <strong>of</strong> finding SBC <strong>of</strong> soil has started. Results <strong>of</strong> SBC for 6<br />

ESR have been received and the contractor firm has<br />

submitted design / drawings for 5 OHT which are under<br />

process <strong>of</strong> approval/ checking etc.<br />

Package no. GWL/WS/11 RWPS,WTP 45 MLD & Pump house CWR & CWPS<br />

Name <strong>of</strong> Contractor: M/s Vishwa Infrastructures & Services Pvt. Ltd,<br />

Secunderabad<br />

Cost <strong>of</strong> Contract:<br />

Rs. 1242.80 lakh<br />

Date <strong>of</strong> Award: 29. 01. 2007<br />

Time <strong>of</strong> completion: 18 months<br />

Works includes:<br />

Raw Water pumping station; 45 MLD capacity WTP; CWRcum-pumping<br />

station and associated works.<br />

Design / Drawings <strong>of</strong> Intake well and WTP have been<br />

submitted by the contractor firm, which are under process <strong>of</strong><br />

approval by PIU/DSC. In the meantime General layout <strong>of</strong><br />

Intake well has been submitted by the contractor firm and<br />

approved by the PIU/DSC and its excavation work is going<br />

to start in the first week <strong>of</strong> July’07.<br />

Package no. GWL/WS/12 Installation <strong>of</strong> Tighara transmission main and feeder mains.<br />

Name <strong>of</strong> Contractor: M/s Vishwa Infrastructures & Services Pvt. Ltd,<br />

Secunderabad<br />

Cost <strong>of</strong> Contract:<br />

Rs. 1267.92 lakh<br />

Date <strong>of</strong> Award: 9. 03.2007<br />

Time <strong>of</strong> completion: 12 months<br />

Works includes: Supply, installation, testing and commissioning <strong>of</strong> 4,200m<br />

RWPM <strong>of</strong> 800mm dia. DI-k9 pipes and 9,500m CWPM <strong>of</strong><br />

750mm dia. DI-k9 pipes, with allied works.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

18


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

5.1.5 JMC Water Supply Pre-Construction<br />

Third party inspection or 500m <strong>of</strong> 800mm dia. DI-k9 pipes<br />

has been done and these have been received at the site.<br />

The overall cost estimate <strong>of</strong> the 12 water supply contract packages for Jabalpur amounts to Rs.<br />

13,057.57 lakh, equating to 73% above the PAM allocated amount. To date, invitation for bids has<br />

been given for all contract packages.<br />

Award <strong>of</strong> contract has been given for the below listed contracts, to the given dates, for two<br />

International Shopping procurement contract packages and two civil works contract package, for a<br />

total estimated amount <strong>of</strong> Rs.1,096.23 lakh, equating to 8% <strong>of</strong> the overall water supply programme:<br />

JBP/WS/01 IS 31-10-07 Phase I: Supply/install bulk meters & bulk consumer meters<br />

JBP/WS/08 IS 13-03-07 Phase II: dom, non-dom & bulk meters (463 Nos)<br />

JBP/WS/04 LCB IR 06-03-07 Phase I: Rectification Pariyat Dam: overflow, intake & Dam<br />

JBP/WS/04 LCB IR 22-05-07 Distribution: Medical College & Polipather Areas<br />

Land issues remain pending for 8 clearances, which have yet to be finalized for contract packages<br />

JBP/WS/12 (OHSR’s); JBP/WS/18 (RW and feeder mains); and JBP/WS/16 (intake well and<br />

pumping main), refer to Appendix–B.<br />

5.1.6 JMC Water Supply Construction Phase<br />

Of the 4 contract packages, work has progressed as follows:<br />

Package no. JBP/WS/01 Supply/install bulk meters & bulk consumer mtrs (58 Nos).<br />

Name <strong>of</strong> Contractor: M/s Chetas Control System Pvt. Ltd,. Pune<br />

Cost <strong>of</strong> Contract:<br />

Rs. 70.92 lakh<br />

Date <strong>of</strong> Award: 31.10.06<br />

Time <strong>of</strong> completion: 9 months<br />

Works includes:<br />

Supply, Installation, testing etc. <strong>of</strong> electromagnetic bulk<br />

meters & Woltman type bulk consumer meters- 58 nos.<br />

50 nos. Woltman type bulk meters have reached Jabalpur<br />

Transport Company. 8 Nos. Electromagnetic Flow Meters<br />

have been dispatched from Denmark and are likely to reach<br />

India in the month <strong>of</strong> July’07.<br />

Package no. JBP/WS/04 Rectification <strong>of</strong> Pariyat Dam: overflow, intake, gate &<br />

channel etc.<br />

Name <strong>of</strong> Contractor: M/s Piyush Rajani Construction in JV M/s Narendra Saluja,<br />

Jabalpu<br />

Cost <strong>of</strong> Contract:<br />

Rs. 244.66 lakh<br />

Date <strong>of</strong> Award: 3. 03.2007<br />

Time <strong>of</strong> completion: 12 months<br />

Works includes:<br />

- Apron and side walls <strong>of</strong> the waste weir at Pariyat dam.<br />

- Open channel and inlet chambers at Pariyat Dam.<br />

- Flood diversion work at upstream <strong>of</strong> intake gate.<br />

- Installation <strong>of</strong> new sluice gate at intake structure.<br />

Work on apron <strong>of</strong> the waste weir continued with the removal<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

19


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

<strong>of</strong> the damaged block concrete and casting <strong>of</strong> plum<br />

concrete started. Approx 800 cum <strong>of</strong> plum concrete has<br />

been poured against total quantity <strong>of</strong> 5100 cum.<br />

Flood diversion work at upstream <strong>of</strong> intake gate has also<br />

been completed and measurements <strong>of</strong> existing gate taken.<br />

Orders for procurement <strong>of</strong> new gate have been placed,<br />

which is likely to be received at the end <strong>of</strong> July, 2007.<br />

Package no. JBP/WS/07 Distribution system for medical college area & Polipathar<br />

area.<br />

Name <strong>of</strong> Contractor: M/s Electrosteel Ltd., Kolkata<br />

Cost <strong>of</strong> Contract:<br />

Rs. 728.69 lakh<br />

Date <strong>of</strong> Award: 22.05.2007<br />

Time <strong>of</strong> completion: 12 months<br />

Works includes:<br />

Distribution system- 76 km for medical college & Polipathar<br />

Areas. Work has recently been awarded.<br />

Distribution system for medical college area & Polipathar<br />

area.<br />

Package no. JBP/WS/08 Supply/installation <strong>of</strong> domestic, non-domestic and bulk<br />

meters.<br />

Name <strong>of</strong> Contractor: M/s Capstan Meters (India) Ltd., Jaipur<br />

Cost <strong>of</strong> Contract:<br />

Rs. 51.97 lakh<br />

Date <strong>of</strong> Award: 13.03.2007<br />

Time <strong>of</strong> completion: 9 months<br />

Works includes: Supply, Installation , Testing, commissioning and<br />

maintenance <strong>of</strong> mechanical multi-jet type water meters for<br />

commercial consumers and 20mm above size for domestic<br />

consumers.<br />

Data sheet has been approved by the DSC/PIU.<br />

Manufacturing is under progress.<br />

5.1.7 IMC Water Supply Pre-Construction<br />

The overall cost estimate <strong>of</strong> the 21 water supply contract packages for Indore amounts to Rs.<br />

53,173.33 lakh, equating to 51% above the PAM allocated amount. To date, all concept reports<br />

have been completed, out <strong>of</strong> which design reports and bid documents have been prepared for 18<br />

packages for an investment <strong>of</strong> Rs. 46,013.33 lakh, which is 87% <strong>of</strong> the overall water supply<br />

allocation. Invitation for bids have been prepared for 17 packages for an investment <strong>of</strong> Rs.<br />

44,266.53 lakh, which is 83% <strong>of</strong> the overall water supply allocation.<br />

Award <strong>of</strong> contract has been given for the below listed contracts, to the given dates, for a single<br />

International Shopping procurement contract package and 11 civil works contract packages, for a<br />

total estimated amount <strong>of</strong> Rs.17,320.23 lakh, equating to 33% <strong>of</strong> the overall water supply<br />

programme:<br />

IND/WS/01 IS 19-10-06 EM Bulk meters on Pumping Main & Gravity Main<br />

IND/WS/02 LCR IR 23-05-07 Rehabilitation <strong>of</strong> Pump Houses at Yaswant Sagar & Narmada<br />

IND/WS/03 LCB IR 24-10-06 Rehabilitation <strong>of</strong> Yaswant Sagar WTP<br />

IND/WS/04 LCB IR 24-10-06 Leak detect/rectification: (Lot 1: Repair/replacement <strong>of</strong> valves);<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

20


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

(Lot 2: Rehab <strong>of</strong> 3,000 consumer connections)<br />

IND/WS/05 LCB IR 24-10-06 Phase II: Leak detection and rectification (>400mm dia)<br />

IND/WS/06 ICB TK 30-01-07 Construction <strong>of</strong> 900 MLD RW PStn. & Intake Well<br />

IND/WS/07 LCB TK 16-11-06 Construction <strong>of</strong> 132 kV/33 kV sub-station & HT Line<br />

IND/WS/10 ICB TK 16-01-07 Augmentation Narmada: Part A: 360 MLD WTP & Allied Works<br />

IND/WS/11-L1 ICB IR 29-06-07 Augmentation scheme from Narmada:<br />

Raw Water Pumping Main: (Lot 1 )<br />

IND/WS/11-L2 ICB IR 29-06-07 Augmentation scheme from Narmada:<br />

Raw Water Pumping Main: (Lot 2 )<br />

IND/WS/16 LCB TK 13-11-06 Construction <strong>of</strong> 7 no. O/H Storage Reservoirs<br />

IND/WS/20 LCB TK 29-06-07 Augmentation scheme from Narmada:<br />

Part C: Construction <strong>of</strong> Tunnels<br />

Land issues remain pending for 4 clearances, which have yet to be finalized for contract packages<br />

IND/WS/12 Lot 1 (gravity main) and IND/WS/13 (transmission main), refer to Appendix–B.<br />

5.1.8 IMC Water Supply Construction Phase<br />

The construction work has commenced for the following contracts to the details given:<br />

Package no. IND/WS/01 EM Bulk meters on Pumping Main & Gravity Main<br />

Name <strong>of</strong> Contractor: M/s Krohne Marshall Pvt. Ltd., Pune<br />

Cost <strong>of</strong> Contract:<br />

Rs. 130.61 lakh<br />

Date <strong>of</strong> Award: 19. 10.2006<br />

Time <strong>of</strong> completion: 9 months<br />

Works includes:<br />

Supply, Installation, Testing, commissioning etc:<br />

- Electromagnetic Flow Meters - 13 nos.<br />

- Bulk Domestic Meters - 63 Nos.<br />

Third Party inspection has been done for Electromagnetic<br />

Flow Meters and part <strong>of</strong> bulk domestic meters on 26.06.07.<br />

The inspected material will be received at site in the month<br />

<strong>of</strong> July’07<br />

Package no. IND/WS/02 Rehabilitation <strong>of</strong> Pump Houses at Yaswant Sagar &<br />

Narmada.<br />

Name <strong>of</strong> Contractor: M/s Mathar & Platt Pumps Ltd., Pune<br />

Cost <strong>of</strong> Contract:<br />

Rs. 112.88 lakh<br />

Date <strong>of</strong> Award: 23.05.07<br />

Time <strong>of</strong> completion: 12 months<br />

Works includes:<br />

Rehabilitation <strong>of</strong> pump houses and pumping plants.<br />

Work recently awarded. Work plan submitted by the<br />

contractor firm has been approved by DSC/PIU<br />

Package no. IND/WS/03 Rehabilitation <strong>of</strong> Yashwant Sagar Water Treatment Plant<br />

Name <strong>of</strong> Contractor: Joint Venture <strong>of</strong> M/s Asiatic Traders, Indore M/s Vichitra<br />

Prestressed Concrete Udyog, Indore & M/s Adroit Indore<br />

Cost <strong>of</strong> Contract:<br />

Rs. 111.12 lakh<br />

Date <strong>of</strong> Award: 24. 10.2006<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

21


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

Time <strong>of</strong> completion:<br />

Works includes:<br />

12 months<br />

Rehabilitation <strong>of</strong> Settling tanks, filter beds and other<br />

connected works<br />

Work on rehabilitation <strong>of</strong> 4 primary and 4 secondary settling<br />

tanks out <strong>of</strong> 8 each is almost complete and at present apoxy<br />

paint work is in progress. Construction <strong>of</strong> chlorinating<br />

building under progress & plastering being done.<br />

Rectification <strong>of</strong> two filter beds almost complete.<br />

Package no. IND/WS/04 Leak detect/rectify Lot-1: Repair/replacement <strong>of</strong> valves<br />

Name <strong>of</strong> Contractor: M/s Keti Construction (I) Ltd., Indore<br />

Cost <strong>of</strong> Contract:<br />

Rs. 93.60 lakh<br />

Date <strong>of</strong> Award: 24.10 .2006<br />

Time <strong>of</strong> completion: 12 months<br />

Works includes:<br />

Replacement <strong>of</strong> 46 old valves<br />

30 valves have been manufactured and the remaining 16<br />

are under the process <strong>of</strong> manufacturing. Third party<br />

inspection <strong>of</strong> the above has also been done and 17 valves<br />

have been received at site.<br />

Package no. IND/WS/05 Leak detection and rectification (>400mm dia)<br />

Name <strong>of</strong> Contractor: M/s Vishwa Infrastructures & Services Pvt. Ltd,<br />

Secunderabad<br />

Cost <strong>of</strong> Contract:<br />

Rs. 133.97 lakh<br />

Date <strong>of</strong> Award: 24.10.2006<br />

Time <strong>of</strong> completion: 12 Months<br />

Works includes:<br />

Replacement <strong>of</strong> following feeder mains <strong>of</strong> 400 mm and<br />

above:<br />

- 400 mm 5 m (CI)<br />

- 500 mm 1780 m (PSC)<br />

- 600 mm 600 m (PSC)<br />

Pipes have been manufactured & their third party inspection<br />

completed. 1000m supply <strong>of</strong> 500 mm dia (PSC) pipes has<br />

been received and work <strong>of</strong> their laying, Jointing started.<br />

About 200 m length has been laid.<br />

Package no. IND/WS/06 Design, Construction and maintenance <strong>of</strong> 900 MLD capacity<br />

Raw Water Intake well<br />

Name <strong>of</strong> Contractor: M/s Nagarjuna Construction Co. Ltd. Hyderabad<br />

Cost <strong>of</strong> Contract:<br />

Rs. 2261.18 lakh<br />

Date <strong>of</strong> Award: 31.10.2006<br />

Time <strong>of</strong> completion: 18 months<br />

Works includes:<br />

Intake well and Raw Water pumping station <strong>of</strong> 900 MLD<br />

capacity.<br />

Work <strong>of</strong> excavation and base concrete has been completed<br />

for Intake well. The contractor firm has established their<br />

<strong>of</strong>fice. Work plan and General layout plan submitted by the<br />

contractor firm has been approved by DSC/PIU.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

22


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

Package no. IND/WS/07 Construction <strong>of</strong> 132 kV/33 kV sub-station & HT Line<br />

Name <strong>of</strong> Contractor: M/s Asiatic Traders, Indore<br />

Cost <strong>of</strong> Contract:<br />

Rs. 2538.85 lakh<br />

Date <strong>of</strong> Award: 16.11.2006<br />

Time <strong>of</strong> completion: 24 months<br />

Works includes:<br />

Construction <strong>of</strong> 132 kv/33kv electric sub-station & HT line<br />

About 75% Design / Drawings approved. Leveling work <strong>of</strong><br />

ground for 132 kv as well as 33 kv sub-stations has almost<br />

been completed.<br />

Package no. IND/WS/10 Design, Construction, commissioning O&M <strong>of</strong> 363 MLD<br />

output capacity water treatment plant near village Bhaklai<br />

Name <strong>of</strong> Contractor: M/s Enviro Control Associates Pvt. Ltd., Surat<br />

Cost <strong>of</strong> Contract:<br />

Rs. 3971.00 lakh<br />

Date <strong>of</strong> Award: 03.02.2007<br />

Time <strong>of</strong> completion: 21 months<br />

Works includes:<br />

Construction <strong>of</strong> 363 MLD WTP along with connected works<br />

Work Plan, General Layout Plan & Process Design<br />

submitted by the contractor firm have been approved by the<br />

PIU/DSC. Excavation work <strong>of</strong> clarifloculors has almost been<br />

completed. Construction <strong>of</strong> <strong>of</strong>fice building is under progress.<br />

Package no. IND/WS/16 Construction <strong>of</strong> Overhead Storage Reservoirs<br />

Name <strong>of</strong> Contractor: M/s Gondwana Engineers Pvt. Ltd., Nagpur<br />

Cost <strong>of</strong> Contract:<br />

Rs. 891.00 lakh<br />

Date <strong>of</strong> Award: 13.11.06<br />

Time <strong>of</strong> completion: 15 months<br />

Works includes:<br />

7 Overhead reservoirs each <strong>of</strong> 3000 KL capacity at the<br />

following locations in the city, Staging:<br />

Sl. no. 1 to 5 - 20 meters<br />

Sl. no. 6 - 15 meters<br />

Sl. no. 7 - 10 meters<br />

1. Sangam Nagar: Staging completed, Beam’s work <strong>of</strong><br />

bottom slab under progress;<br />

2. MIG Colony: Construction up to 18m height <strong>of</strong><br />

columns above ground level has<br />

been completed;<br />

3. Zinsi Hat Maidan: Foundation work in progress;<br />

columns up to ground level bracing<br />

completed.<br />

4. Dravid Nagar: Foundation work completed along<br />

with ground level bracing.<br />

5. Urdu School: Foundation work in progress.<br />

Columns up to ground level bracing<br />

completed.<br />

6. M.Y. Hospital: Foundation work in progress.<br />

Columns up to ground level bracing<br />

completed.<br />

7. Vidur Nagar: Staging completed.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

23


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

5.2 Wastewater and Sanitation<br />

Refer to Table 5.2 for the city-wise progress <strong>of</strong> the wastewater component <strong>of</strong> the project. The total<br />

investment for this component amounts to Rs. 13,608.84 lakhs and comprises 11 contract<br />

packages. The overall investment <strong>of</strong> this component, according to current status <strong>of</strong> cost estimates,<br />

is 36% below the PAM allocated amount.<br />

Progress to date includes the completion <strong>of</strong> all concept reports design reports and bid documents<br />

have been submitted.<br />

Invitation for bids have been given for 10 contract packages for an investment <strong>of</strong> Rs.13,004.20 lakh,<br />

equating to 96% <strong>of</strong> the overall wastewater and sanitation programme.<br />

Award <strong>of</strong> 3 procurement contracts and one civil works contract (BPL/WW/04 for the installation <strong>of</strong><br />

the treated effluent pipeline from Maholi to Dhamkheda) have been issued to date. Delivery <strong>of</strong> the<br />

below listed equipment has since been completed under packages PMU/WW/01, for Bhopal,<br />

Gwalior and Indore under central procurement through the PMU for vacuum and jetting cleaning<br />

equipment, for an investment <strong>of</strong> Rs.202.70 lakhs which is 1% <strong>of</strong> the overall wastewater and<br />

sanitation programme investment. The distribution <strong>of</strong> the equipment to the project cities has been<br />

completed as follows:<br />

• sewer suction cum jetting machines (8,500 litre) Bhp, 2 No.; Gwl, 1 No.; Ind, 3 No.;<br />

• suction Machine (4,500 litre) Gwl, 1 No.;<br />

• sewer suction cum jetting machines (3,000 litre) Bhp, 4 No.; and<br />

• Jetting machines (2,000 litre) Gwl, 1 No.<br />

In ensuring the required connectivity, it is essential to incorporate provisions for house connections,<br />

inclusive <strong>of</strong> sewer and sullage discharge, for which appropriate contracts are revised.<br />

5.2.1 Bhopal Wastewater<br />

The overall cost estimate <strong>of</strong> the 5 wastewater contract packages for Bhopal amounts to Rs.<br />

6,001.31 lakh, inclusive <strong>of</strong> the sanitation programme, which is above the PAM allocated amount by<br />

47%. All proposals for inclusion <strong>of</strong> sanitation schemes have been deferred to the JN-NURM<br />

programme. On site sanitation will be taken up under the AIF component <strong>of</strong> the programme, as part<br />

<strong>of</strong> an integrated development approach inclusive <strong>of</strong> water supply initiatives.<br />

To date, all concept reports, design reports and bid documents have been completed; and invitation<br />

to bids issued.<br />

Award <strong>of</strong> contract has been issued for the central procurement package, PMU/WW/01, for an<br />

investment <strong>of</strong> Rs.98.56 lakhs, and the civil works package BPL/WW/04 for the construction <strong>of</strong> the<br />

treated effluent pipeline from Maholi to Dhamkheda for an investment <strong>of</strong> Rs.245.40 lakhs, which<br />

totals 6% <strong>of</strong> the overall wastewater and sanitation programme investment.<br />

The procurement package, PMU/WW/01/BPL, has been completed with the delivery <strong>of</strong> equipment <strong>of</strong><br />

2 nos. vacuum and jetting cleaning equipment <strong>of</strong> various capacities, to the Municipal Corporation for<br />

an investment <strong>of</strong> Rs.98.56 lakhs, which totals 1% <strong>of</strong> the overall wastewater and sanitation<br />

programme investment.<br />

Land issues remain pending for 3 clearances, which have yet to be finalized for contract package<br />

BPL/WW/05 for the sewage pumping stations, and continue to be unresolved, refer to Appendix–B.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

24


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

The PIU claim that these outstanding clearances will be finalized shortly, although to date no<br />

noticeable progress is being made.<br />

Construction work has started for Package no. BPL/WW/04 (additional works for 25 MLD capacity<br />

STP at Maholi, Damkheda), according to the following status:<br />

Name <strong>of</strong> Contractor: M/s Rajani Construction Company, Bhopal.<br />

Cost <strong>of</strong> Contract:<br />

Rs. 245.0 lakh<br />

Date <strong>of</strong> Award:<br />

Providing , laying, Jointing, Testing etc. <strong>of</strong> ISI marked RCC<br />

non pressure pipes class NP 2 (with spigot / socket ends)<br />

Time <strong>of</strong> completion: 12 months<br />

Works includes:<br />

(i) 900mm diameter for 2500 m<br />

(ii) 800 mm diameter for 200 m<br />

2500m long WBM road <strong>of</strong> 2.75 m width with 0.50m shoulder<br />

on each side. Total width <strong>of</strong> road 3.75m.<br />

5.2.2 Gwalior Wastewater<br />

Work has commenced on road laying <strong>of</strong> subgrade<br />

completed part 1600 mtr. and laying <strong>of</strong> GSB layer completed<br />

for 1040 mtr. Order for supply <strong>of</strong> pipes already placed & first<br />

lot received after third party inspection. The Contractor has<br />

established their site <strong>of</strong>fice & laboratory.<br />

Due to budget constraints, in February 2007, Gwalior MIC approved the removal <strong>of</strong> the wastewater<br />

and sanitation civil works components from the ADB programme, which are now to be implemented<br />

under UIDSSMT. On site sanitation will be taken up under the AIF component <strong>of</strong> the programme, as<br />

part <strong>of</strong> an integrated development approach inclusive <strong>of</strong> water supply initiatives.<br />

The PMU central procurement contract has since been completed, for the delivery <strong>of</strong> 3 nos. <strong>of</strong><br />

vacuum and jetting cleaning equipment <strong>of</strong> various capacities, under package PMU/WW/01/GWL for<br />

an investment <strong>of</strong> Rs. 43.56 lakhs.<br />

5.2.3 Jabalpur Wastewater<br />

As Jabalpur presently does not have any form <strong>of</strong> conventional sewerage system in the city, the<br />

Municipal Corporation has deferred the procurement <strong>of</strong> the suction cum jetting equipment to be<br />

implemented under JN-NURM programme. This will better coincide with the scheduled time the<br />

proposed sewerage systems under the programme are due to be completed in 2009. All proposals<br />

for inclusion <strong>of</strong> sanitation schemes have been deferred to the JN-NURM programme. On site<br />

sanitation will be taken up under the AIF component <strong>of</strong> the programme, as part <strong>of</strong> an integrated<br />

development approach inclusive <strong>of</strong> water supply initiatives.<br />

The overall cost estimate <strong>of</strong> the 3 wastewater contract packages for Jabalpur amounts to Rs.<br />

6,898.75 lakh, which is above the PAM allocated amount by 22%. To date, invitation for bids have<br />

been issued for all packages.<br />

Land issues remain pending for 3 clearances, which have yet to be finalized for contract packages<br />

<strong>of</strong> JPL/WW/02 for the trunk and outfall sewer, and JPL/WW/04 for the STP at Kathonda, and<br />

continue to be unresolved, refer to Appendix–B. The PIU claimed that these outstanding<br />

clearances would be finalized by the end <strong>of</strong> this reported period but they remain unresolved.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

25


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

5.2.4 Indore Wastewater<br />

The overall cost estimate <strong>of</strong> the 2 wastewater contract packages for Indore amounts to Rs. 665.22<br />

lakh, which is below the allocated amount by 88%. All proposals for inclusion <strong>of</strong> sanitation schemes<br />

have been deferred to the JN-NURM programme. On site sanitation will be taken up under the AIF<br />

component <strong>of</strong> the programme, as part <strong>of</strong> an integrated development approach inclusive <strong>of</strong> water<br />

supply initiatives.<br />

To date, all concept reports, design reports and bids documents have been prepared.<br />

Award <strong>of</strong> contract, and subsequent delivery <strong>of</strong> 3 number 8,500 litre vacuum jetting equipment, has<br />

been completed under the central procurement contract package PMU/WW/01 for an investment <strong>of</strong><br />

Rs. 60.58 lakhs.<br />

No clearance procedures are required for the civil works contract.<br />

5.3 Solid Waste Management<br />

Gwalior has arranged implementation <strong>of</strong> their solid waste management programme under other<br />

funding and so has withdrawn from this component but has diverted the allocated budget to their<br />

water supply infrastructural development programmes.<br />

Refer to Table 5.3 for the city-wise progress <strong>of</strong> the solid waste management component <strong>of</strong> the<br />

project. The total investment for this component amounts to Rs. 3,272.49 lakhs and comprises 30<br />

contract packages, inclusive <strong>of</strong> 26 PMU centrally procured contract packages, which amounts to 4%<br />

less than the allocated amount.<br />

To date, all concept reports have been approved, out <strong>of</strong> which design reports and the invitation for<br />

bids have been issued for 29 contracts for an amount <strong>of</strong> Rs. 3,062.49 lakhs, equating to 94% <strong>of</strong> the<br />

overall solid waste management total.<br />

Contract have been completed for 25 procurement contract packages under central procurement<br />

through the PMU for purchase <strong>of</strong> equipment, under International Shopping for dumper trucks,<br />

dozers, excavators, loaders, and secondary collection and transportation equipment for an<br />

investment <strong>of</strong> Rs.1,130.76 lakhs, which is 35% <strong>of</strong> the overall programme.<br />

5.3.1 Bhopal Solid Waste Management<br />

The overall cost estimate <strong>of</strong> the 12 contract packages for Bhopal amounts to Rs.843.61 lakh, which<br />

is 15% below that <strong>of</strong> the PAM allocated amount. To date, all concept reports have been approved,<br />

out <strong>of</strong> which detailed design reports, bid documents and invitation for bids have been completed.<br />

Contracts have been completed for 10 procurement contracts with the delivery <strong>of</strong> dumper trucks,<br />

dozers, excavators, loaders, and secondary collection and transportation equipment to the BMC, for<br />

a total investment <strong>of</strong> Rs.534.93 lakh, equating to 63% <strong>of</strong> the overall programme.<br />

5.3.2 Jabalpur Solid Waste Management<br />

The overall cost estimate <strong>of</strong> the 7 contract packages, inclusive <strong>of</strong> 6 packages under PMU control<br />

procurement, amounts to Rs. 870.31 lakh, which is 24% above the PAM allocated amount. To date,<br />

all concept reports, detailed design report, bid documents and invitation for bids have been<br />

completed.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

26


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

Contracts have been completed for the 6 procurement contract packages for a total investment <strong>of</strong><br />

Rs.120.36 lakh, equating to 14% <strong>of</strong> the overall programme.<br />

All clearances regarding contract package JBP/SWM/04 for the Kathonda sanitary landfill site have<br />

been completed with the NOC from the Airport Authority issued on 10 th March 2007.<br />

5.3.3 Indore Solid Waste Management<br />

The total number <strong>of</strong> contract packages for Indore Municipal Corporation, comprise 2 civil works<br />

packages and 9 contracts for PMU centrally procurement <strong>of</strong> equipment, for a total estimated<br />

investment <strong>of</strong> Rs. 1,558.56 lakhs, which is 43% above that <strong>of</strong> the PAM allocated amount.<br />

To date, all concept reports, detailed design report, bid documents and invitation for bids have been<br />

completed.<br />

Contracts have been completed for the 9 procurement contract packages for a total investment <strong>of</strong><br />

Rs.475.46 lakh, equating to 31% <strong>of</strong> the overall programme.<br />

5.4 Stormwater Drainage<br />

Indore has not included any stormwater drainage component in their infrastructural improvement<br />

programme. Due to budget constraints; Gwalior MIC, during February 2007, approved the removal<br />

<strong>of</strong> the drainage component from ADB Programme and recommended for implementation under<br />

UIDSSMT.<br />

Jabalpur MIC, during May 2007, approved the removal <strong>of</strong> their drainage component from ADB<br />

Programme and recommended for implementation under the JN-NURM programme.<br />

Refer to Table 5.4 for the city-wise progress <strong>of</strong> the stormwater drainage component <strong>of</strong> the project.<br />

The total investment for this component amounts to Rs.1,066.50 lakhs and comprises the single<br />

contract package BPL/DR/01 for the rehabilitation <strong>of</strong> Patra Nallah.<br />

This drainage scheme is an additional scheme, identified as a priority order need that was not<br />

initially included in the proposed development plan <strong>of</strong> the ADB <strong>Project</strong>. However, BMC are presently<br />

considering deferring this scheme to the JN-NURM programme. To date, the concept report, design<br />

report and bid documents have been prepared for BPL/DR/01.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

27


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

6. URBAN GOVERNANCE AND INSTITUTIONAL DEVELOPMENT<br />

6.1 Social and Community Development<br />

Part B <strong>of</strong> the UWSEIP incorporates the Urban Governance and Institutional Development, inclusive<br />

<strong>of</strong> public participation elements, which is designed to increase the awareness and participation <strong>of</strong><br />

the <strong>Project</strong> beneficiaries. The implementation <strong>of</strong> the social and community development component<br />

<strong>of</strong> the programme has involved the Municipal Action Plan for Poverty Reduction (MAPPR) approach,<br />

which includes the following funding components:<br />

• Area Improvement Fund (AIF): aimed at poorly served settlements, with inadequate<br />

infrastructure, which will attain integrated slum improvements through participatory planning.<br />

Funds to be available to the Municipal Corporation on an annual review basis;<br />

• Community Initiatives Fund (CIF): for the social sector inclusive <strong>of</strong> community facilities,<br />

education, income generation; and<br />

• The Water for Asia Cities Programme in India covering urban water conservation and demand<br />

management, to be financed through parallel co-financing by United Nations Human<br />

Settlements Programme (UN-Habitat).<br />

6.1.1 Slum Improvement Component under AIF & CIF<br />

The AIF/CIF component, for slum improvement and development initiatives, was deferred for DFID<br />

implementation, under the MPUSP programme, effectively from March 2006. However, the<br />

component was reinstated during April 2007, under an executive decision at GoMP level, with the<br />

proposal for including community managed water supply and sanitation schemes. These schemes<br />

will be identified for location within suitably selected slum areas, which fall outside <strong>of</strong> the overall<br />

water supply coverage boundaries under presently proposed urban infrastructural development<br />

programmes.<br />

Procedures and methodology for the implementation <strong>of</strong> the AIF/CIF programmes was prepared<br />

during the reported period. AIF/CIF schemes are to be identified for location within suitably selected<br />

slum areas, which fall outside <strong>of</strong> the overall water supply coverage boundaries under presently<br />

proposed urban infrastructural development programmes.<br />

It is proposed that the initial annual programme <strong>of</strong> infrastructural improvements, under the AIF<br />

component, will be conducted within the previously selected slums, for which 32 priority order slums<br />

have been selected since April 2006. These slums will again need verification and cross checking <strong>of</strong><br />

intervening interventions being conducted by other agencies and projects. It is envisaged that 10<br />

slums for each <strong>of</strong> the <strong>Project</strong> Cities will be included under the AIF/CIF component, in accordance<br />

with the extent <strong>of</strong> scope <strong>of</strong> work and the PAM budget allocations. Viable schemes will include<br />

community managed water supply and sanitation schemes to provide comprehensive basic needs<br />

upgrading <strong>of</strong> slum and poor settlements.<br />

Subsequent annual allocations under AIF will be performance-based. This will be according to the<br />

monitoring and evaluation <strong>of</strong> the initial implementation stage and may be modified to provide an<br />

incentive based on an assessment <strong>of</strong> performance.<br />

6.1.2 Public Awareness Campaign Initiatives<br />

The need to closely coordinate with the associated engineering components continues to be<br />

pursued, through the preparation <strong>of</strong> public awareness data sheets, in compiling salient information<br />

regarding specific contract packages and related benefits to the community.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

28


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

The expected post project impact, through reference to BME data, has also been recorded.<br />

Simultaneously, all details <strong>of</strong> community members/ representative groups are being incorporated<br />

within the data sheets, along with requisite public awareness action plans according to identified<br />

timeframes and milestone deliverables, inclusive <strong>of</strong> required PRC interventions.<br />

6.1.3 Gender Action Plan and Field Manual<br />

The draft Gender Field Manual was further developed by the DSC(E) community development<br />

experts during the course <strong>of</strong> the reported period, <strong>of</strong> which an amalgamated document is presently<br />

being completed in readiness for distribution to the PIU’s.<br />

Based on the essential details <strong>of</strong> the Gender Field Manual, a generic Gender Action Plan has been<br />

prepared, which will be circulated to the respective Municipal Corporations in readiness for<br />

arranging necessary coordination workshops on the subject matter and final preparation <strong>of</strong> the GAP<br />

by the respective PIU’s for approval by the city corporation.<br />

6.1.4 Land and Resettlement Issues<br />

The PIU’s have been <strong>of</strong>ficially requested to review all packages for land issues and resettlement<br />

requirements, along with verification in accordance with ADB Resettlement Guidelines, which also<br />

involves inclusion <strong>of</strong> an appropriate entitlement policy.<br />

It has also been pointed out to the respective PIU’s that involuntary resettlement includes all<br />

unavoidable resettlement losses that have resulted in disruption to the lives <strong>of</strong> affected people <strong>of</strong> the<br />

area where land is to be acquired, or government land is to be utilized, involving ADB infrastructural<br />

development.<br />

For the pro-poor element <strong>of</strong> the <strong>Project</strong>, particular emphasis has been stressed on enhancing the<br />

status and incomes <strong>of</strong> the poor and vulnerable related AP’s, in accordance with the rule is that AP’s<br />

should be at least as well <strong>of</strong>f as they would have been in the absence <strong>of</strong> the infrastructural<br />

development interventions under the <strong>Project</strong><br />

In line with the requirements <strong>of</strong> a Short Resettlement Plan and Entitlement Matrix, the PIU have<br />

been instructed to fully address the following:<br />

• Identify and clearly understand the gaps between existing land acquisition and resettlement<br />

policies <strong>of</strong> the state to that <strong>of</strong> ADB’s policy;<br />

• Review the eligibility criteria for Affected Persons, in line with the finalized designs and<br />

contracts. This will involve verification at site and review <strong>of</strong> all pipeline routings;<br />

• In addition to all concerned titleholders, identification and consultation with all related and<br />

concerned stakeholders, including appointed community representatives. This includes all<br />

categories <strong>of</strong> affected people; employees losing job and income opportunities; encroachers,<br />

informal settlers and all types and sizes <strong>of</strong> business enterprises, authorized or unauthorized;<br />

• Conduct coordination public meetings on a monthly basis;<br />

• Verify and revise the detailed asset inventories and valuation <strong>of</strong> the compensation packages;<br />

• Finalize the overall budget for land acquisition and resettlement costs;<br />

• Establish a Grievance Redress Mechanism for communications and reactions from all AP’s on<br />

specifics <strong>of</strong> the provided entitlements and compensation timeframe, inclusive <strong>of</strong> amicable<br />

resolution <strong>of</strong> any disputes and payment <strong>of</strong> compensation;<br />

• Include, as Appendices to the Resettlement Plan, all details <strong>of</strong> disclosures and compensation<br />

payments to AP’s;<br />

• Establish monitoring and evaluation provisions for tracking the number <strong>of</strong> persons compensated<br />

and resettled, restoration <strong>of</strong> incomes and any additional assistance provided; and<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

29


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

• Prepare a detailed timeframe cum work plan for the implementation <strong>of</strong> the Resettlement Plan.<br />

6.2 Financial Management<br />

The PMU continued to assist the city corporations in the formulation <strong>of</strong> their respective Financial<br />

Improvement Action Plans (FIAP’s); in accordance with the provisions <strong>of</strong> ADB guidelines, including<br />

accounting and budgeting reforms.<br />

The timeframe and scheduled dates <strong>of</strong> the FIAP have been revised allowing for the late signing <strong>of</strong><br />

the Loan Agreement. The city corporations are to endorse and amend as appropriate with the<br />

consent <strong>of</strong> ADB, the State and GOI.<br />

Efforts have been made to coordinate the work <strong>of</strong> MPUSP, DFID, within identified areas <strong>of</strong> mutual<br />

reference, which is expected to be strengthened in months ahead for common gain and benefits.<br />

6.2.1 Common <strong>Project</strong> Incremental Costs<br />

The sharing <strong>of</strong> common incremental costs, both at City Corporation level and also at the PMU level,<br />

at the time <strong>of</strong> closure <strong>of</strong> the sub-projects was finalized by the PMU during May 2007.<br />

The allocation <strong>of</strong> common cost <strong>of</strong> PIU’s, expressed as % on direct cost and based on suitable<br />

estimates <strong>of</strong> the four city corporations, has since been circulated for uniform adoption and would<br />

ultimately require ratification by the Empowered Committee.<br />

6.2.2 Financial Improvement Action Plan<br />

The progress on Financial Improvement Action Plan (FIAP) for the project cities remains slow with<br />

the overall status being as follows:<br />

• Bhopal Municipal Corporation: the proposal for FIAP is approved by the MIC and the<br />

proposal for revision <strong>of</strong> rates is approved by the Parisad.<br />

• Gwalior Municipal Corporation: the proposal for FIAP has been approved by the MIC <strong>of</strong> GMC<br />

in principle with some modifications, and has since been approved by the Parisad.<br />

• Jabalpur Municipal Corporation: the proposal for FIAP has been approved by the MIC <strong>of</strong><br />

JMC and ratified by Parisad members. The collection <strong>of</strong> water rates at revised rates<br />

continues.<br />

• Indore Municipal Corporation: the proposal for FIAP has been approved by the MIC <strong>of</strong> IMC<br />

and ratified by the Parisad members. The collection <strong>of</strong> water rates at revised rates continues.<br />

Bhopal Municipal Corporation: Progress has been recorded in the areas <strong>of</strong> ‘budgeting reform’,<br />

adopting ‘chart <strong>of</strong> accounts’ under NMAM. The progress in the area <strong>of</strong> compiling the ‘Opening<br />

Balance Sheet’ and other associated tasks are yet to gather momentum. PMC have been informed<br />

that BMC is looking for ‘outsourced agency’ to complete the tasks.<br />

The progress in the areas <strong>of</strong> Revenue Reform appears to be satisfactory and the Revenue<br />

Department has registered marginal growth in collection without recourse to ‘Tariff Revision”, which<br />

has been approved by MIC, but awaiting clearance from the Parisad Members. The growth in the<br />

revenue, as we understand, has resulted partially due to full computerization <strong>of</strong> billing process;<br />

which has resulted in improving the tax spread over greater numbers <strong>of</strong> tax payers, identified during<br />

the process <strong>of</strong> cleansing <strong>of</strong> records at ward levels.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

30


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

Gwalior Municipal Corporation: Marginal progress have been reported in the areas <strong>of</strong> adoption <strong>of</strong><br />

prescribed approved code structure for budgeting functions for the financial year 2007-2008. As<br />

informed, GMC is planning to adopt the code structure from the platform <strong>of</strong> budget coding system;<br />

which appears to be a rather rational approach, considering the present state <strong>of</strong> affairs <strong>of</strong> finance.<br />

GMC management has already decided to outsource a number <strong>of</strong> related activities under DFID<br />

assistance programme, including compilation <strong>of</strong> opening balance sheet; updating and valuation <strong>of</strong><br />

fixed and current assets for incorporating in the opening balance sheet; and ascertainment <strong>of</strong><br />

employee related activities. These have been cross checked with the concerned <strong>of</strong>ficials <strong>of</strong> DFID.<br />

However the progress on the tasks involved is yet to be assessed. In the Revenue area, there has<br />

been negative progress during the collection drive completed for the last financial year i.e. 2006-<br />

2007.<br />

The details <strong>of</strong> the progress, including analysis <strong>of</strong> poor performance, needs to be assessed in the<br />

next scheduled visit, planned for June 2007. Initially it has been informed that that the delays in the<br />

collection drive was due mainly to the ramifications <strong>of</strong> the recent election and other non-revenue<br />

activities, during the peak period <strong>of</strong> the collection drive.<br />

Jabalpur Municipal Corporation: During the month the review on the progress on financial and<br />

revenue improvement program was conducted in the Jabalpur City corporations (JMC) covering<br />

various identified areas where ‘reform programs’ were under way e.g. Computerization <strong>of</strong> Billing<br />

Process, Accounts and Budgeting Functions adopting Accrual Basis Accounting system as per<br />

National Municipal Accounting Manual, Financial Management reforms, Improvement in Revenue<br />

collection, <strong>Project</strong> Accounting functions and other allied areas for the corporations.<br />

Significant progress have been made during the last two months by adopting reformed budgeting<br />

process, and reformed ‘chart <strong>of</strong> accounts’ as per NMAM, framing new strategy for revenue<br />

generation. The progress in the areas <strong>of</strong> compiling opening balance sheet, which inter alia to<br />

include valuation <strong>of</strong> unrecorded assets etc has yet to gather momentum for the months ahead.<br />

Indore Municipal Corporation: It appears that some marginal progress has been noticed in the<br />

reform activities; but in the perspective <strong>of</strong> the entire reform programme, the progress made so far is<br />

not uniform and not as per the agreed timeframe.<br />

The areas where progress have been noticed are (a) Budgeting and adopting NMAM’s budget<br />

coding system (b) Computerized billing on an updated and improved data base and (c) System<br />

S<strong>of</strong>tware development for conversions <strong>of</strong> accounts from the existing improvised system to the<br />

system approved in NMAM.<br />

It is understood that the city management is looking for DFID’s assistance to cover the areas e.g.<br />

creation <strong>of</strong> asset records, opening balance sheet and streamlining transaction processing system.<br />

The progress in the areas <strong>of</strong> Revenue Reform is now under observation.<br />

6.2.3 Water Supply Management Improvement Plan<br />

The project cities have still yet to fully endorse their commitment to the formation <strong>of</strong> an autonomous<br />

and accountable water and sanitation department within the Municipal Corporation for long term<br />

improvement <strong>of</strong> the water supply management.<br />

This is an essential requirement <strong>of</strong> the loan agreement. A concept note and framework document<br />

has been issued to Municipal Corporation’s for formation <strong>of</strong> Water & Sanitation Department (WSD).<br />

Immediate follow-up actions required in formation <strong>of</strong> autonomous WSD:<br />

• acceptance <strong>of</strong> concept by MC’s;<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

31


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

• agreed revision to RRP timeframe;<br />

• identify required institutional strengthening;<br />

• setup organization, staffing & training for quality services;<br />

• fix service level standards & monitor;<br />

• WSD responsibility for billing & collection; and<br />

• formation <strong>of</strong> accounting dept & annual audit.<br />

6.3 Institutional Development<br />

Background literature available on the subject <strong>of</strong> State Municipal Services Regulatory Commission<br />

(SMSRC) has been reviewed and a draft paper on the subject prepared.<br />

Significant initiatives have been taken after studying the prevailing legal institutional framework <strong>of</strong><br />

the state administrative hierarchy, which includes proposed reforms Urban Development Policy;<br />

Urban Reform Agenda; Urban Land Policy; and Unified Municipal Law for <strong>Madhya</strong> <strong>Pradesh</strong>.<br />

6.3.1 Programme Reforms<br />

The UDD and the Municipal Corporations <strong>of</strong> Bhopal, Indore, Gwalior & Jabalpur are currently<br />

engaged in implementation <strong>of</strong> reforms from the three streams <strong>of</strong> MP URBAN (ADB) <strong>Project</strong>,<br />

including Urban Development Policy; Jawahar National Urban Renewal Mission; and Policy<br />

Interventions from UADD.<br />

Efforts have been made to identify various items included in the three streams, which have been<br />

divided into common groups so that a uniform and comprehensive approach may be adopted for<br />

implementation.<br />

Capacity Building, being an all inclusive group, is to be considered separately. The tool kits on the<br />

reform agenda under the mission, prepared and circulated by the Ministry <strong>of</strong> Urban Development,<br />

have been further studied.<br />

6.3.2 Urban Development Policy<br />

The draft Urban Development Policy document was further edited and revised, along with updates<br />

on the Hindi translation. Representative text in the form <strong>of</strong> an executive summary <strong>of</strong> the entire<br />

document has been prepared, which is due for translation into Hindi.<br />

This comprehensive document, as it stands, indicates the steps to be taken in institutional,<br />

legislative, financial, empowerment <strong>of</strong> ULB’S, urban planning, city planning, water supply, slum<br />

development, which is to be taken up for implementation.<br />

A review meeting was held in the presence <strong>of</strong> the Principal Secretary on the 30 th June 2007 to<br />

discuss the salient details <strong>of</strong> the draft Urban Development Policy document, in terms <strong>of</strong> the tabled<br />

Executive Summary, and to identify required strategies for approval <strong>of</strong> the document. It was agreed<br />

that the way forward would be to address the document according to distinctive sections, which<br />

would be prepared as three separate Policy Papers, as follows:<br />

• Issues within the UADD;<br />

• Reallocation <strong>of</strong> business between departments under the Minister UAD & Housing; and<br />

• Issues relating to other departments <strong>of</strong> the government like Revenue, PHED etc.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

32


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

6.3.3 State Level Body for Resource Mobilization<br />

Two different proposals on the subject setting up <strong>of</strong> an Infrastructure Development Corporation or<br />

Urban development Fund have been under discussion.<br />

It appears that tentatively the view is in favor <strong>of</strong> setting up <strong>of</strong> the Urban Improvement Fund for which<br />

further steps are likely to be taken by the UADD.<br />

6.3.4 Metropolitan Planning & Regional Development Authority<br />

This proposal to constitute four Metropolitan Regional Development Authorities under an initial<br />

phase, for the area in and around the towns having population greater than or nearing 10 lakhs, was<br />

further developed and is being pursued with the Director, Town & Country Planning.<br />

A paper is under preparation, which complies to institutional arrangements in consonance with the<br />

74 th Constitutional Amendment Act 1992.<br />

6.3.5 Urban Sanitation Mission<br />

Proposals are under preparation for the setting up an Urban Sanitation Mission in the state and the<br />

Institutional expert has given inputs on the components <strong>of</strong> the policy, its structure and legal<br />

framework for implementing various measures.<br />

A review meeting <strong>of</strong> the status <strong>of</strong> the Urban Sanitation Mission was conducted on the 23 rd April<br />

2007, which included detailed discussions regarding the following related issues:<br />

• future strategies to be followed in further pursuing the proposed policies;<br />

• Legal provisions;<br />

• Intentions for urban sanitation;<br />

• Budgetary expectations;<br />

• Staffing requirements; and<br />

• Enforcement measures.<br />

6.3.6 Water Supply & Sewerage Board for MP<br />

In accordance with recommendations made for the formation <strong>of</strong> an autonomous Water Supply and<br />

Sanitation Body, a workshop was organized and held on the 10 th May 2007 regarding the “Delivery<br />

<strong>of</strong> Services in Urban Areas and the Role <strong>of</strong> Municipal Services Regulatory Commission”. The<br />

Workshop was well attended with a number <strong>of</strong> prominent speakers presenting papers on the subject<br />

matter.<br />

6.4 <strong>Project</strong> Performance Management Report<br />

A <strong>Project</strong> Performance Management Report (PPMR), in the form <strong>of</strong> a report according to ADB<br />

format, which incorporates the following sections, was submitted to the PMU for comments and<br />

approval during May 2007:<br />

• Basic <strong>Project</strong> data;<br />

• Impact and outcome summarized data;<br />

• Implementation progress data and analysis;<br />

• Rating criteria for assessment <strong>of</strong> implementation;<br />

• Overall weighted implementation progress status; and<br />

• Compliance with ADB Key Loan Covenants.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

33


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

6.5 Management Information System<br />

6.5.1 Financial Information<br />

Activities for the Finance module have included the creation <strong>of</strong> Bill/Invoice, which was further<br />

updated and fully tested with trial data and submitted to PMU Finance for checking and commenting<br />

on the MIS provisions. In addition to this, a Fund Requisition Management module, for PIU to PMU<br />

data transfer, was completed, which requires trial checking by the PMU.<br />

“Reimbursement Claim” module automates the process <strong>of</strong> sending the Reimbursement claim to<br />

ADB in a user friendly manner.<br />

“Tax Deduction at Source” module deals with the TDS details <strong>of</strong> the bills submitted by the contractor<br />

along with Gross Amount, Rate <strong>of</strong> Tax Deduction, Tax Amount, Cheque No., Date <strong>of</strong> Tax, Challan<br />

no. and Challan date. This tax information will be reflected in the main report. This module has now<br />

been completed but needs to be trial tested.<br />

“TDS Update” module provides user options to update the existing data <strong>of</strong> the TDS for the<br />

Contractor. This module has now been completed but needs to be trial tested.<br />

“ADB Reimbursement Claim Report” has been developed for which a print can be send directly to<br />

ADB for reimbursement <strong>of</strong> funds. This module has now been partially completed and is scheduled<br />

for completion by mid June 2007.<br />

6.5.2 Physical and Financial Tracking<br />

Work was further progressed on the Physical and Financial tracking <strong>of</strong> data for the contract<br />

packages, which involves defining the contract activities in terms <strong>of</strong> generic categories according to<br />

the type <strong>of</strong> infrastructural development and the corresponding input data <strong>of</strong> specific items <strong>of</strong> the Bill<br />

<strong>of</strong> Quantities (BoQ). This will later be developed for inclusion <strong>of</strong> a tracking compliance to the<br />

contractor’s work plan and insertion <strong>of</strong> graphical presentation <strong>of</strong> data.<br />

The Financial input will be linked to specific BoQ data for each package and include the associated<br />

rates and quantity data. A system <strong>of</strong> weighted ranking has been prepared according to the<br />

significance <strong>of</strong> particular elements <strong>of</strong> the works, which is to be used for tracking physical progress.<br />

“Bill/Invoice Report” provides interface to select Contractor/Package and time frame. Then it lists all<br />

the information related with the bills along with ADB Share, GoMP Share and ULB Share and on<br />

top, it lists Total Package Cost, Package Duration and total <strong>of</strong> all the numeric columns. This module<br />

has now been completed but needs to be trial tested. Further work has been progressed on the<br />

development <strong>of</strong> the following:<br />

• BOQ Activities: Creates a list <strong>of</strong> predefined activities;<br />

• Package Category: Creates a list <strong>of</strong> predefined Categories and assigned Packages to the<br />

Category;<br />

• BOQ Packages: Assigned predefined static information as per the BOQs <strong>of</strong> the package<br />

such as Unit, Qty., Amount, Weightage, Link ID <strong>of</strong> the BOQ’s document; and<br />

• Update <strong>of</strong> BOQ Packages: Provides user interface and functionality for the updating <strong>of</strong> the<br />

data.<br />

The “BOQ Main” is the main program and has the interface where a user first selects the Contract<br />

Type and then related package under the Contract Type. The user will see all the bills already<br />

added to it and list <strong>of</strong> available bills which can be added. The user can also select and add the<br />

available bills by checking the checkboxes. Based on this information, reports will be prepared,<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

34


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

which will reflect the status <strong>of</strong> the packages as per the assigned weightage and calculation <strong>of</strong> the<br />

physical and financial progress in terms <strong>of</strong> percentages.<br />

6.6 Implementation <strong>of</strong> e-tendering Process<br />

During the reported period work was continued by the appointed service provider, M/s abcprocure,<br />

in the preparation <strong>of</strong> uploaded documents for conducting the online bidding processes, inclusive <strong>of</strong><br />

post bid notification <strong>of</strong> evaluations on the web.<br />

To date, a total <strong>of</strong> 57 contract documents, inclusive <strong>of</strong> the preparation <strong>of</strong> pre-qualification forms and<br />

financial bid forms, have been completed, which comprise <strong>of</strong> the following, refer to Appendix-D for<br />

full details:<br />

• 18 contracts for Bhopal, inclusive <strong>of</strong> 4 contracts for re-bidding (BPL/WS/05, BPL/WS/07,<br />

BPL/WS/08 and BPL/WS/12);<br />

• 8 contracts for Gwalior and no re-bidding;<br />

• 21 contracts for Jabalpur, inclusive <strong>of</strong> inclusive <strong>of</strong> 2 contracts for re-bidding (JPL/WS/12 and<br />

JBP/WS/02); and<br />

• 11 contracts for Indore, inclusive <strong>of</strong> inclusive <strong>of</strong> one contract for re-bidding (IND/SWM/05).<br />

6.7 Monitoring <strong>of</strong> Outstanding Clearances<br />

Tracking <strong>of</strong> the progress made by the respective PIU’s in finalization <strong>of</strong> the pending clearances<br />

continued during the reported period. However, progress continues to be very slow with poor<br />

response by the associated agencies and ongoing slippage and delays taking place.<br />

Only 14 clearances, out <strong>of</strong> a total <strong>of</strong> 38, have been completed to date, refer to Appendix-B for full<br />

details <strong>of</strong> the associated agencies and present status <strong>of</strong> the respective contract packages.<br />

BMC has 7 outstanding clearances, with the last scheduled clearance to be finalized in October<br />

2007 for the implementation <strong>of</strong> Patra Nallah, for which clearance requirements have yet to be fully<br />

identified.<br />

GMC has completed all their clearances.<br />

No progress has been made during the month by JMC, which has only managed to clear 3 <strong>of</strong> their<br />

15 clearances. Indore has cleared 7 <strong>of</strong> their 11 clearances.<br />

IMC has 7 outstanding clearances, with the last scheduled clearance to be finalized in October 2007<br />

for the implementation <strong>of</strong> Patra Nallah, for which clearance requirements have yet to be fully<br />

identified.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

35


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

7. COMPLIANCE WITH ADB MAJOR LOAN COVENANTS<br />

The status <strong>of</strong> compliance with the ADB Covenants as stipulated within the Loan Agreement (LA),<br />

referred in Schedule 6 <strong>of</strong> the PAM document and appropriate RRP Appendices, is detailed in<br />

accordance with progress made up to the 30 th June 2007.<br />

Note: Important milestones scheduled within PAM and the RRP have been revised as appropriate<br />

due to the delayed start to the UWSEIP programme.<br />

ADB Major Loan Covenant<br />

L.A.<br />

Sch-6<br />

Ref.:<br />

Status <strong>of</strong> Compliance<br />

7.1 Sector Loan Covenants<br />

7.1.1 Urban Water Supply Management<br />

Improvement Plan (UWSMIP)<br />

The State shall ensure that the <strong>Project</strong> City<br />

Corporations undertake the actions to meet<br />

the long-term objective <strong>of</strong> improving water<br />

supply management in accordance with the<br />

timetable agreed among the State, the<br />

<strong>Project</strong> City Corporations and ADB and<br />

attached as Appendix 9 to the RRP for the<br />

<strong>Project</strong>, unless otherwise agreed among the<br />

State, ADB and the <strong>Project</strong> City Corporation.<br />

7.1.2 Municipal Action Plan for Poverty<br />

Reduction<br />

The State shall ensure that each <strong>Project</strong> City<br />

Corporation prepares an initial MAPPR within<br />

one year <strong>of</strong> the Effective date and annually<br />

thereafter for submission to the PMU in<br />

accordance with the MAPPR framework<br />

agreed among the Borrower, the State and<br />

the <strong>Project</strong> Cities and attached to the RRP<br />

for the <strong>Project</strong> as Supplementary Appendix<br />

E.<br />

7.1.3 Adequate AIF & CIF Allocations<br />

The State shall ensure that adequate<br />

allocations are made:<br />

(i) from the AIF to the <strong>Project</strong> City<br />

Corporations; and<br />

Para<br />

8.<br />

Para<br />

10.<br />

Para<br />

11.<br />

Framework document, for formation <strong>of</strong><br />

autonomous Water & Sanitation<br />

Department (WSD) in MP, under review,<br />

inclusive <strong>of</strong>:<br />

• acceptance <strong>of</strong> concept by MC’s;<br />

• agreed revision to RRP timeframe;<br />

• identify required institutional<br />

strengthening;<br />

• setup organization, staffing & training for<br />

quality services;<br />

• fix service level standards & monitor;<br />

• WSD responsibility for billing &<br />

collection;<br />

• form accounting dept & annual audit.<br />

Data collection and analysis has been<br />

collected, according to the MAPPR<br />

approach, for all slums in each city by UN-<br />

Habitat.<br />

Under UWSEIP, MAPPR approach<br />

adopted in initial identification <strong>of</strong> 32 priority<br />

order pre-selection slums under AIF<br />

completed Oct-Dec 2005. Was deferred to<br />

MPUSP (but reinstated April 2007).<br />

AIF allocations made in compliance with<br />

the budget provisions <strong>of</strong> the PAM.<br />

Verification, according to slum selection<br />

and community needs. Was deferred to<br />

MPUSP (but reinstated April 2007).<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

36


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

ADB Major Loan Covenant<br />

(ii) from the CIF to the PIUs for community<br />

based activities.<br />

In each case only for approved schemes<br />

under the MAPPR and in a manner<br />

satisfactory to ADB.<br />

The State shall ensure that the Quarterly<br />

Reports (refer Section 5.6) prepared by the<br />

PMU include progress made and statements<br />

on use <strong>of</strong> funds under AIF and CIF.<br />

7.1.4 MAPPR Appraisal<br />

The State shall ensure that the PMU<br />

undertakes an appraisal <strong>of</strong> each MAPPR,<br />

including an appraisal <strong>of</strong> the schemes funded<br />

from the AIF and CIF, on an annual basis in<br />

the third quarter <strong>of</strong> each MAPPR cycle.<br />

7.2 Environmental Loan Covenants<br />

L.A.<br />

Sch-6<br />

Ref.:<br />

Para<br />

12.<br />

Status <strong>of</strong> Compliance<br />

CIF allocations made in compliance with<br />

the budget provisions <strong>of</strong> the PAM,<br />

verification, according to community<br />

development programme. Was deferred to<br />

MPUSP (but reinstated April 2007).<br />

Quarterly AIF & CIF data, as progressed<br />

to date, is to be furnished according to<br />

community development programme.<br />

Was deferred to MPUSP (but reinstated<br />

April 2007).<br />

To comply as appropriate. Interrupted<br />

MAPPR cycle. Was deferred to MPUSP<br />

(but reinstated April 2007).<br />

7.2.1<br />

Environmental Management Plan<br />

The State and the project City Corporations<br />

shall ensure that the <strong>Project</strong> is carried out in<br />

accordance with the existing environmental<br />

laws and regulations <strong>of</strong> India and ADB’s<br />

environmental guidelines, in particular the<br />

Environment Policy <strong>of</strong> the Asian<br />

Development Bank (2002);<br />

(a) all monitoring and mitigation measures<br />

indicated in the Initial Environmental<br />

Examination and provided for under the<br />

Environmental Management Plan are<br />

undertaken for the <strong>Project</strong><br />

(b) <strong>Project</strong> implementation shall include<br />

consultation with local communities on<br />

environmental issues;<br />

(c) <strong>Project</strong> City Corporations shall take a<br />

proactive role in environmental planning,<br />

management and monitoring;<br />

(d) State Pollution Control Board clearance<br />

shall be obtained for all applicable<br />

<strong>Project</strong> components prior to<br />

commencement <strong>of</strong> work on those<br />

components; and<br />

Para<br />

14.<br />

Under compliance in accordance with<br />

ADB Environmental Policy and<br />

Environmental Assessment Guidelines<br />

2003.<br />

Under compliance: IEE screening <strong>of</strong><br />

potential environmental impact and<br />

mitigation measures applied according to<br />

project location, specific sector<br />

development and associated design<br />

requirements.<br />

Under compliance: as the design stage is<br />

progressed. This is also forming part <strong>of</strong><br />

the undergoing public awareness<br />

campaigns.<br />

Under compliance: Initiated as the concept<br />

and detailed design stages and being<br />

progressed.<br />

Under compliance: All necessary<br />

clearances presently under pursuance.<br />

Specific clearance details are now<br />

compiled for appropriate contract<br />

packages. Clearance Plan prepared to a<br />

scheduled timeframe, which is monitored<br />

for submissions to the various agencies in<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

37


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

ADB Major Loan Covenant<br />

(e) existing waste disposal sites that have<br />

reached full capacity shall be properly<br />

sealed within three months <strong>of</strong><br />

commencement <strong>of</strong> operation <strong>of</strong> the new<br />

sanitary landfills.<br />

7.2.2 Indore Namada WS Pipeline RoW<br />

Enforcement<br />

The State shall ensure that the route <strong>of</strong> the<br />

proposed water supply transmission pipeline<br />

from Narmada River to Indore shall be within<br />

the existing right-<strong>of</strong>-way with no new<br />

acquisition <strong>of</strong> forest or other land, unless<br />

identified as necessary during detail <strong>Project</strong><br />

design.<br />

7.2.3 Wastewater Discharge Protocol<br />

The State shall ensure that Indore City<br />

Corporation is allowed to discharge and treat<br />

sewage in the sewage treatment plants<br />

constructed under the centrally sponsored<br />

schemes prior to award <strong>of</strong> sewerage network<br />

contracts under the <strong>Project</strong>.<br />

7.2.4 Operation & Maintenance<br />

The State shall ensure that each <strong>Project</strong> City<br />

Corporation undertakes operation and<br />

maintenance <strong>of</strong> <strong>Project</strong> facilities in<br />

accordance with good practice for water<br />

supply, sewerage and solid waste<br />

management, and in accordance with the<br />

regulations <strong>of</strong> India and <strong>of</strong> the State.<br />

7.3 Social Loan Covenants<br />

7.3.1 Public Participation & Awareness<br />

Program: WAC Program<br />

The State shall ensure that Bhopal shall<br />

implement the WAC Program in accordance<br />

with the detailed implementation strategy and<br />

plan to be agreed by the Borrower, the State,<br />

Indore, ADB and UN-HABITAT.<br />

The Borrower and the State shall have<br />

entered into an agreement with UN-HABITAT<br />

to implement the WAC Program in Indore<br />

within six months <strong>of</strong> the Effective Date.<br />

L.A.<br />

Sch-6<br />

Ref.:<br />

Para<br />

16.<br />

Para<br />

17.<br />

Para<br />

20.<br />

Para<br />

9.<br />

Status <strong>of</strong> Compliance<br />

obtaining the necessary clearances.<br />

Relevant clauses are placed in the<br />

Contract Document in accordance with<br />

SWM Supreme Court Guidelines.<br />

Complied with by the Indore Municipal<br />

Corporation: No pending RoW’s issues,<br />

with land ownership title and right <strong>of</strong> way<br />

requirements finalized with the Highway<br />

Department (via Collector Indore) and<br />

Forestry Dept. (via Collector Khargone):<br />

Complied with by the Indore Municipal<br />

Corporation.<br />

Shall be ensured as required.<br />

Will form part <strong>of</strong> the training requirement in<br />

effective O&M practices.<br />

Complied: Water Demand Management<br />

study in Indore conducted by UN-<br />

HABITAT, in accordance with the<br />

recommended implementing strategies.<br />

WDM Report issued February 2006.<br />

Complied<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

38


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

ADB Major Loan Covenant<br />

L.A.<br />

Sch-6<br />

Ref.:<br />

Status <strong>of</strong> Compliance<br />

7.3.2 Gender Action Plan<br />

The State shall ensure that the Gender<br />

Action Plan as agreed among the Borrower,<br />

the State and ADB and set out in<br />

supplementary Appendix J to the RRP for<br />

the <strong>Project</strong> is implemented.<br />

The PMU to prepare field manuals and<br />

conduct training on the Gender Action Plan<br />

for the PMU and PIU staff.<br />

7.3.3 Land Acquisition and Resettlement<br />

a) The State shall cause the Short<br />

Resettlement Plan (attached to the RRP for<br />

the <strong>Project</strong> as Supplementary Appendix G)<br />

relating to the sewage treatment plant in<br />

Jabalpur, including the provision <strong>of</strong> all<br />

required counterpart funds for agreed<br />

compensation to affected persons to be<br />

implemented in a manner satisfactory to ADB<br />

prior to award <strong>of</strong> the civil works contracts.<br />

Para<br />

13.<br />

Para<br />

15a)<br />

Draft generic Gender Action Plan,<br />

incorporating <strong>Project</strong> Implementation and<br />

Urban Governance areas <strong>of</strong> focus, under<br />

revision for reinstatement <strong>of</strong> AIF/CIF<br />

component for circulation to city<br />

corporations.<br />

Draft Gender Field Manual being edited<br />

for incorporating comments received from<br />

the city corporations. City level training on<br />

use <strong>of</strong> the manual and specific GAP<br />

preparation by MC’s to be imparted:<br />

modules and schedule to be determined.<br />

Contract Packages:<br />

JBP/WW/04 for 50 MLD STP &<br />

JBP/SWM/03 for sanitary landfill sites at<br />

Khathonda: details <strong>of</strong> the Short<br />

Resettlement Plan being followed, for the<br />

identified households affected by loss <strong>of</strong><br />

agricultural land (10 nos.) and households<br />

affected by loss <strong>of</strong> residential structure (4<br />

Nos.).<br />

Total affected persons 121 Nos.<br />

Due to revised layout plan <strong>of</strong> STP and<br />

SLF site, number <strong>of</strong> Khasra/owners 17.<br />

7.3.4<br />

Resettlement Plan<br />

b) The State shall ensure that:<br />

(i) <strong>Project</strong> components are designed so as<br />

to minimize resettlement; and<br />

(ii) If, during detailed design <strong>of</strong> <strong>Project</strong><br />

components, involuntary resettlement<br />

arises from land acquisition or temporary<br />

disruption <strong>of</strong> income generation, a<br />

resettlement plan (the Resettlement Plan)<br />

shall be prepared and implemented in<br />

accordance with:<br />

• <strong>Government</strong> laws and<br />

procedures;<br />

• ADB’s Policy on Involuntary<br />

Resettlement; and<br />

• the <strong>Project</strong>’s agreed Land<br />

Acquisition and Resettlement<br />

Framework (attached to the RRP<br />

for the <strong>Project</strong> as Supplementary<br />

Appendix F).<br />

Para<br />

15b)<br />

Complied: general policy adopted for all<br />

designs.<br />

To date involuntary resettlement has not<br />

been required, but shall comply if<br />

requirement occurs.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

39


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

ADB Major Loan Covenant<br />

L.A.<br />

Sch-6<br />

Ref.:<br />

Status <strong>of</strong> Compliance<br />

7.3.5<br />

Involuntary Resettlement<br />

c) If any Involuntary Resettlement is required<br />

as described in paragraph 3.4(ii) above,<br />

based on the final engineering designs for<br />

the <strong>Project</strong>, the State shall prepare the<br />

Resettlement Plan, submit this for ADB’s<br />

approval and ensure the provision <strong>of</strong> all<br />

required counterpart funds for agreed<br />

compensation to affected persons prior to<br />

award <strong>of</strong> civil works contracts in the affected<br />

area.<br />

ADB’s approval <strong>of</strong> the Resettlement Plan and<br />

disbursement <strong>of</strong> agreed compensation shall<br />

be a condition for award <strong>of</strong> civil works<br />

contracts in the affected area.<br />

7.3.6 Land Acquisition<br />

d) All land required for a <strong>Project</strong> component,<br />

including any that may entail involuntary<br />

resettlement, shall be acquired no later than<br />

twelve months after loan effectiveness,<br />

failing which the component shall be<br />

eliminated from the <strong>Project</strong> unless ADB<br />

agree otherwise.<br />

7.4 Financial Loan Covenants<br />

7.4.1 Financial Improvement Action Plan (FIAP)<br />

The State shall cause each <strong>Project</strong> City<br />

Corporation to prepare and submit a<br />

resolution to its Municipal Council to execute<br />

the Financial Improvement Action Plan in<br />

accordance with the timetable agreed with<br />

ADB within one month from the Effective<br />

Date.<br />

Para<br />

15c)<br />

Para<br />

15d)<br />

Para<br />

6.<br />

Shall comply, as applicable.<br />

Shall comply, as required and as<br />

applicable. Policy for disbursements, prior<br />

to award <strong>of</strong> contracts to be adhered to.<br />

The timeframe planning for completion <strong>of</strong><br />

all land issues is being managed, for<br />

which LA issues are being addressed<br />

according to project location and<br />

implicated agency.<br />

Advance action being taken to ensure full<br />

compliance.<br />

Bhopal Municipal Corporation: the proposal<br />

for FIAP is approved by the MIC. The<br />

proposal for revision <strong>of</strong> rates is approved<br />

by the Parisad.<br />

Gwalior Municipal Corporation: the<br />

proposal for FIAP has been approved by<br />

the MIC <strong>of</strong> GMC in principle with some<br />

modifications, and has since been<br />

approved by the Parishad.<br />

Jabalpur Municipal Corporation: the<br />

proposal for FIAP has been approved by<br />

the MIC <strong>of</strong> JMC and ratified by Parisad<br />

members. The collection <strong>of</strong> water rates at<br />

revised rates continues.<br />

Indore Municipal Corporation: the proposal<br />

for FIAP has been approved by the MIC <strong>of</strong><br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

40


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

ADB Major Loan Covenant<br />

L.A.<br />

Sch-6<br />

Ref.:<br />

Status <strong>of</strong> Compliance<br />

IMC and ratified by the Parisad members.<br />

The collection <strong>of</strong> water rates at revised<br />

rates continues.<br />

7.4.2<br />

Agreed Timetable for FIAP<br />

The State shall ensure that the <strong>Project</strong> City<br />

Corporations execute the Financial<br />

Management Improvement Action Plan, in<br />

accordance with the timetable agreed among<br />

the Borrower, the State, the <strong>Project</strong> City<br />

Corporations and ADB and attached as<br />

Appendix 12 to the RRP for the <strong>Project</strong>,<br />

including:<br />

(a) revision in water charges and<br />

introduction <strong>of</strong> progressive block rate<br />

water tariff;<br />

(b) reassessment <strong>of</strong> properties and revision<br />

in taxes;<br />

Para<br />

7.<br />

Para<br />

7a).<br />

Para<br />

7b).<br />

The timeframe and scheduled dates <strong>of</strong> the<br />

FIAP has been revised allowing for the<br />

late signing <strong>of</strong> the Loan Agreement.<br />

The FIAP’s have been translated to Hindi<br />

and circulated to all MC’s in ensuring<br />

effective monitoring.<br />

The water tariff revision status is as<br />

follows:<br />

• Bhopal: water tariff revision proposal<br />

from current Rs.60/ mth to Rs.150/mth<br />

and annual increments <strong>of</strong> Rs.10/mth:<br />

approved by MIC, approved in<br />

principal by Parisad.<br />

• Gwalior: proposed increase in tariff<br />

from current Rs.60/ mth approved by<br />

MIC and ratified by the Parisad.<br />

• Jabalpur: tariff revision dated<br />

06.07.06, retroactive from 01.04.06:<br />

Domestic metered: rate increase from<br />

Rs.3 to 3.5/kl;<br />

Bulk & non-domestic metered: rate<br />

increase from Rs.9 to 13.5/kl;<br />

Domestic non-metered: from 60 to 70<br />

Rs./mth (½” dia); from 120 to 180<br />

Rs./mth (¾” dia).<br />

Commercial: increased by 50% for all<br />

bulk consumption categories<br />

• Indore: tariff revision dated 11.09.06,<br />

active from 01.10.06:<br />

Domestic metered: rate increase from<br />

Rs.10 to 11/kl, & annual increments <strong>of</strong><br />

Rs.1/kl thereafter;<br />

Domestic non-metered (½” dia): from<br />

60 to 150 Rs./mth & annual<br />

increments thereafter.<br />

Commercial and Industrial: increased<br />

for all size <strong>of</strong> connections, and further<br />

increased annually up to 2015.<br />

Being examined with the City<br />

Corporations.<br />

• Reassessment/ revaluation <strong>of</strong><br />

properties<br />

• revision in taxes<br />

(c) introduction <strong>of</strong> sewerage surcharge; and Para Included as part FIAP commitment.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

41


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

ADB Major Loan Covenant<br />

(d) improved collection efficiency.<br />

There shall be no amendments to the<br />

timetable without the prior consent <strong>of</strong> the<br />

ADB.<br />

7.4.3 Allocation <strong>of</strong> Resources<br />

The State shall allocate, and shall ensure<br />

that the <strong>Project</strong> City Corporations allocate,<br />

adequate amounts in their annual budgets to<br />

meet their respective investment<br />

requirements in accordance with the<br />

disbursement schedule in each <strong>Project</strong> City.<br />

7.4.4 PMU & PIU’s Accounts, Records & Audit<br />

The State shall ensure that the PMU and<br />

PIUs establish and maintain separate<br />

accounts and records adequate to identify<br />

the incomes and expenditures related to the<br />

<strong>Project</strong>.<br />

Detailed consolidated annual <strong>Project</strong><br />

accounts, as maintained by the PMU, shall<br />

be audited by independent auditors<br />

acceptable to ADB and shall be submitted to<br />

ADB within nine months <strong>of</strong> the close <strong>of</strong> the<br />

fiscal year.<br />

The annual audit shall include the audit <strong>of</strong><br />

the SGIA and SOE procedure, and a<br />

separate audit opinion on the use <strong>of</strong> the<br />

SGIA and SOE procedure shall be included<br />

in the annual audit report.<br />

7.4.5 Audit <strong>of</strong> Accounts <strong>of</strong> <strong>Project</strong> Cities<br />

The State shall ensure that a system <strong>of</strong> audit<br />

<strong>of</strong> accounts by externally appointed auditors<br />

is introduced for the <strong>Project</strong> Cities.<br />

The External auditors shall complete the<br />

audit <strong>of</strong> accounts <strong>of</strong> the <strong>Project</strong> City<br />

Corporations within nine months <strong>of</strong> each<br />

year-end.<br />

7.4.6 Financial Assistance to Low-Income<br />

Groups<br />

The State shall ensure that <strong>Project</strong> City<br />

Corporations maintain a facility for providing<br />

financial assistance to the low-income group<br />

L.A.<br />

Sch-6<br />

Ref.:<br />

7c)<br />

Para<br />

7d)<br />

Para<br />

21.<br />

Para<br />

22.<br />

Para<br />

23.<br />

Para<br />

18.<br />

Status <strong>of</strong> Compliance<br />

Included as part FIAP commitment, with a<br />

marginal improvement in collection<br />

efficiency.<br />

The timeframe and scheduled dates <strong>of</strong> the<br />

FIAP has been revised allowing for the<br />

late signing <strong>of</strong> the Loan Agreement.<br />

The Financing Plan for each <strong>of</strong> the <strong>Project</strong><br />

Cities has been finalized.<br />

The Cities have been informed <strong>of</strong> the total<br />

<strong>Project</strong> cost and their required financial<br />

commitment under annual phasing.<br />

PMU and PIU’s are maintaining separate<br />

accounts and records adequate to identify<br />

the incomes and expenditures related to<br />

the project.<br />

Independent Auditor, Mishra Tiwari &<br />

Associates, Bhopal, appointed. Audit<br />

Report for FY 2006-07 sent to ADB.<br />

The audit <strong>of</strong> accounts conducted in<br />

accordance with the loan covenants in the<br />

scheduled period.<br />

The audit shall be conducted as per<br />

schedule<br />

Shall comply.<br />

Is an intrinsic part <strong>of</strong> the CIF and shall be<br />

taken up with Municipal Corporations, as<br />

required.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

42


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

ADB Major Loan Covenant<br />

households (Income limit shall be fixed in<br />

consultation with ADB) to ensure connection<br />

to the water and sewer systems.<br />

7.4.7 Regular Payment <strong>of</strong> Electricity Bills<br />

The State shall endeavor that the <strong>Project</strong><br />

City Corporations are regular in payment <strong>of</strong><br />

their electricity bills to the <strong>Madhya</strong> <strong>Pradesh</strong><br />

State Electricity Board and shall not<br />

accumulate any new arrears starting in the<br />

Borrower’s fiscal year beginning April 2005.<br />

7.5 Other Related Loan Covenants<br />

7.5.1 Established, Staffed and Operating<br />

PMU/PIU<br />

As the <strong>Project</strong> Executing Agency, UADD<br />

shall be responsible for the execution <strong>of</strong> the<br />

<strong>Project</strong>.<br />

L.A.<br />

Sch-6<br />

Ref.:<br />

Para<br />

19.<br />

Para<br />

1.<br />

Status <strong>of</strong> Compliance<br />

Efforts are being made to strengthen<br />

financial resources <strong>of</strong> Municipal<br />

Corporations so that they are in position to<br />

pay regularly electricity bills and not to<br />

accumulate new arrears. Strategies being<br />

formulated at <strong>Government</strong> level for<br />

<strong>of</strong>fsetting arrears balance against MC<br />

dues. MC arrear data being reconciled<br />

with MP State Electricity Board.<br />

Complied.<br />

7.5.2 Fielding <strong>of</strong> Consultants:<br />

UADD shall maintain the <strong>Project</strong><br />

Management Unit (PMU), which shall be<br />

responsible for coordination and<br />

management <strong>of</strong> the <strong>Project</strong> and which shall<br />

report to the Principal Secretary/Secretary,<br />

UADD.<br />

The PMU shall be led by a fulltime <strong>Project</strong><br />

Director who shall be charged exclusively<br />

with the execution <strong>of</strong> the <strong>Project</strong> and who<br />

shall have no other duties within UADD.<br />

There shall be at least one deputy project<br />

director (DPD) to be responsible for<br />

management and implementation <strong>of</strong> the<br />

urban infrastructure and services, overseeing<br />

and guiding the urban governance and<br />

institutional development by qualified and<br />

compliance with Loan covenants.<br />

UADD shall ensure that the PMU is staffed<br />

by qualified and experienced staff who shall<br />

be appointed as required throughout the<br />

period <strong>of</strong> <strong>Project</strong> implementation.<br />

Para<br />

2.<br />

Complied<br />

PMU is led by <strong>Project</strong> Director<br />

Complied<br />

Complied<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

43


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

ADB Major Loan Covenant<br />

7.5.3 <strong>Project</strong> Implementation Units (PIU’s)<br />

The State shall ensure that a PIU is<br />

maintained in each <strong>Project</strong> City and the<br />

respective PIUs are headed by the Municipal<br />

Commissioner concerned and supported by<br />

full-time senior technical personal<br />

experienced in public health and<br />

environmental engineering.<br />

Each PIU shall comprise 3 sections:<br />

(i) urban infrastructure and<br />

services;<br />

(ii) community awareness and<br />

participation; and<br />

(iii) finance and administration.<br />

Each PIU shall be staffed by qualified and<br />

experienced staff who shall be appointed as<br />

required throughout the period <strong>of</strong> <strong>Project</strong><br />

implementation.<br />

7.5.4 Empowered Committee<br />

The State shall cause an Empowered<br />

Committee to be established and shall<br />

delegate, or cause to be delegated, to the<br />

Empowered Committee appropriate authority<br />

to take decisions on matters related to the<br />

<strong>Project</strong>.<br />

The Empowered Committee shall consist <strong>of</strong><br />

the <strong>Project</strong> Director as Member Secretary,<br />

the Chief Secretary (chair person), UADD,<br />

Public Health Engineering Department<br />

(PHED) and Finance Department <strong>of</strong> the<br />

State, and Commissioner <strong>of</strong> UADD. Other<br />

relevant <strong>of</strong>ficials may be invited as<br />

necessary.<br />

The State shall ensure that the Empowered<br />

Committee shall hold its first meeting within<br />

three months <strong>of</strong> the Effective Date and at<br />

least once every three months thereafter to<br />

review <strong>Project</strong> performance and take<br />

decisions on major issues including<br />

counterpart funding, implementation<br />

bottlenecks, land disputes, procurement and<br />

policy reforms.<br />

L.A.<br />

Sch-6<br />

Ref.:<br />

Para<br />

3.<br />

Para<br />

4.<br />

Status <strong>of</strong> Compliance<br />

UADD has established PIU’s in each city<br />

to implement the project. PIU’s are<br />

working under the concerned Municipal<br />

Commissioner.<br />

PIU’s are headed by senior Engineers<br />

experienced in Public Health and<br />

Environmental Engineering. PIU’s staff<br />

consists <strong>of</strong> Water Supply, Waste Water<br />

and Civil Engs, Procurement Officer,<br />

Community Development Officer,<br />

Accounts Officer, Administrative Officer,<br />

supporting staff.<br />

The Total strength sanctioned is 70<br />

<strong>of</strong>ficials in four PIU’s. Presently the PIU’s<br />

are understaffed and some are not<br />

exclusively dedicated. Efforts are being<br />

made to strengthen the PIU’s.<br />

Empowered Committee has been<br />

constituted vide State <strong>Government</strong> order<br />

dated 11.08.04. Empowered committee<br />

has been delegated powers <strong>of</strong> UADD,<br />

Finance Department and Public Health<br />

Engineering for the implementation <strong>of</strong><br />

project.<br />

The issues requiring approval <strong>of</strong> State<br />

Cabinet will be referred there and for all<br />

other matters, the Empowered Committee<br />

has been delegated authority.<br />

Complied: EC convenes on a regular<br />

basis. The EC is chaired by the Chief<br />

Secretary and consists <strong>of</strong> Principal<br />

Secretary UADD, Principal Secretary<br />

Finance, Principal Secretary Public Health<br />

Engineering, Commissioner Urban<br />

Administration and Development<br />

Department. <strong>Project</strong> director, UWSEIMP is<br />

the Member Secretary <strong>of</strong> Empowered<br />

Committee.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

44


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

ADB Major Loan Covenant<br />

7.5.5 City Steering Committees<br />

The State shall ensure that each <strong>Project</strong> City<br />

Corporation establishes a City Steering<br />

Committees to monitor and guide the<br />

performance <strong>of</strong> the PIU.<br />

For each City Steering Committee, the Mayor<br />

<strong>of</strong> the <strong>Project</strong> City shall be the chair. The<br />

committee, under the chairmanship <strong>of</strong> the<br />

Mayor, shall comprise the Collector <strong>of</strong> the<br />

relevant District or his/her nominee,<br />

representatives from PHED, the State<br />

Pollution Control Board, the State Electricity<br />

Board and four elected municipal counselors<br />

(including one women and one from a<br />

Scheduled Caste <strong>of</strong> Scheduled Tribe) <strong>of</strong> the<br />

respective ULBs.<br />

The State shall ensure that each City<br />

Steering Committee shall hold its first<br />

meeting within three months <strong>of</strong> the Effective<br />

Date, and at least once every three months<br />

thereafter.<br />

7.5.6 Quarterly Progress Reports<br />

a) The State shall provide ADB with<br />

Quarterly Progress Reports on <strong>Project</strong><br />

implementation. The PMU shall be<br />

responsible for obtaining and consolidating<br />

relevant information from the respective PIUs<br />

for the progress reports which shall provide:<br />

(i) a description <strong>of</strong> physical progress;<br />

(ii) details <strong>of</strong> any modification required to the<br />

<strong>Project</strong> implementation schedule;<br />

(iii) problems encountered;<br />

(iv) use <strong>of</strong> AIF and CIF;<br />

(v) an outline <strong>of</strong> the work in the ensuring<br />

quarter; and<br />

(vi) summary financial accounts <strong>of</strong> the<br />

<strong>Project</strong>, consisting <strong>of</strong> expenditure during<br />

the quarter, year-to-date expenditure<br />

during the quarter, year-to-date<br />

expenditure and expenditure to date.<br />

7.5.7 <strong>Project</strong> Completion Report<br />

b) The State shall ensure that the PMU shall<br />

submit to ADB within three months <strong>of</strong> the<br />

physical completion <strong>of</strong> the <strong>Project</strong>, a <strong>Project</strong><br />

Completion Report that shall cover the<br />

details <strong>of</strong> <strong>Project</strong> implementation, costs,<br />

monitoring and evaluation activities and other<br />

information requested by ADB.<br />

L.A.<br />

Sch-6<br />

Ref.:<br />

Para<br />

5.<br />

Para<br />

24a)<br />

Para<br />

24b)<br />

Status <strong>of</strong> Compliance<br />

UADD vide order dated 8.06.04 has<br />

constituted Steering Committee in each<br />

town under Chairmanship <strong>of</strong> Divisional<br />

Commissioner.<br />

The Committee consists <strong>of</strong> Mayor,<br />

Collector, Commissioner Municipal<br />

Corporation, Leader <strong>of</strong> opposition in<br />

Municipal Corporation, <strong>Project</strong> Director<br />

UWSEIMP, Member Secretary Pollution<br />

Control Board, Member Secretary<br />

Chamber <strong>of</strong> Commerce MP, Active Social<br />

Woman worker nominated by chairman.<br />

The Steering Committees hold regular<br />

meetings.<br />

Complied: The Quarterly Progress Report<br />

is issued to ADB on a regular basis.<br />

Shall comply at the appropriate time.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

45


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

7.5.8<br />

ADB Major Loan Covenant<br />

<strong>Project</strong> Performance Three-Tier Reviews<br />

L.A.<br />

Sch-6<br />

Ref.:<br />

Status <strong>of</strong> Compliance<br />

The State shall ensure that <strong>Project</strong><br />

Performance shall be reviewed in a three-tier<br />

system comprising the reviews set out below.<br />

(a) The PMU shall review the progress on<br />

each component and the performance<br />

<strong>of</strong> each PIU in the first ten days <strong>of</strong> the<br />

month for the previous month’s<br />

performance. Based on this review and<br />

in consultation with the relevant DSC,<br />

the PMU shall suggest changes in the<br />

<strong>Project</strong> design and implementation or<br />

refer the issues to the Empowered<br />

Committee. The review report shall be<br />

sent to ADB, the Empowered<br />

Committee and the city-level Steering<br />

Committees for necessary action.<br />

(b) The Empowered Committee shall<br />

conduct the second tier review during<br />

each quarterly meeting. The<br />

proceedings <strong>of</strong> the review shall be<br />

circulated to ADB, UADD and <strong>Project</strong><br />

City Corporations;<br />

(c) The State shall ensure that each<br />

<strong>Project</strong> City Corporation shall participate<br />

in the third tier review by ADB<br />

approximately every six months during<br />

<strong>Project</strong> implementation.<br />

Para<br />

25.<br />

Para<br />

25a)<br />

Para<br />

25b)<br />

Para<br />

25c)<br />

<strong>Project</strong> review shall be according to the 3<br />

tier system as suggested.<br />

Monthly review being conducted.<br />

Scheduled quarterly meetings underway.<br />

<strong>Project</strong> progress reviews being conducted<br />

by ADB.<br />

7.5.9 Mid-Term Review<br />

In addition to reviews undertaken during<br />

<strong>Project</strong> Implementation, the Borrower and<br />

the State shall carry out a comprehensive<br />

Mid-Term Review approximately 24 months<br />

after the Effective Date to critically evaluate<br />

actual <strong>Project</strong> progress, implementation<br />

procedures, procurement methodology,<br />

public relations and community awareness,<br />

BME activities and the performance <strong>of</strong> the<br />

design and supervision consultants.<br />

The Borrower and the State shall ensure that<br />

ADB shall have the right to participate in the<br />

Mid-Term Review.<br />

Following the review, the Borrower and the<br />

State shall ensure that appropriate corrective<br />

action is taken.<br />

Para<br />

26.<br />

Shall comply as required<br />

Shall comply as required.<br />

Shall comply as required<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

46


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

7.5.10<br />

ADB Major Loan Covenant<br />

<strong>Project</strong> Performance Monitoring System<br />

(PPMS)<br />

The State shall ensure that the PMU shall<br />

establish a PPMS acceptable to ADB that<br />

monitors indicators including:<br />

(i) physical progress for infrastructure works;<br />

(ii) institutional development and capacity<br />

building; and<br />

(iii) impact assessment indicators.<br />

The State shall ensure that the PMU shall<br />

conduct initial baseline physical and socioeconomic<br />

surveys and submit a detailed<br />

implementation plan for monitoring<br />

performance and for preparing benchmark<br />

information for ADB’s review and<br />

concurrence within six months <strong>of</strong> the<br />

effective date.<br />

L.A.<br />

Sch-6<br />

Ref.:<br />

Para<br />

27.<br />

Status <strong>of</strong> Compliance<br />

<strong>Project</strong> Performance Monitoring System<br />

acceptable to ADB is under preparation.<br />

Indicators being logged against<br />

programme sector deliverables and impact<br />

parameters.<br />

Initial baseline physical and socioeconomic<br />

surveys conducted by BME<br />

Consultant, according to the BME Plan, for<br />

which BME Reports submitted.<br />

Thereafter, the PMU shall submit annual<br />

monitoring and evaluation reports to ADB<br />

throughout the <strong>Project</strong> implementation.<br />

Shall comply in accordance with the<br />

provisions <strong>of</strong> the BMEC contract, as<br />

required.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

47


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

8. RELATED ACTIVITIES AND ISSUES<br />

8.1.1 Integrity <strong>of</strong> Contracts and Realisation <strong>of</strong> Benefits<br />

As the phased award <strong>of</strong> contract continues, it is inevitable that there is going to be a period <strong>of</strong> time<br />

when contracts for elements <strong>of</strong> the water supply systems, inclusive <strong>of</strong> intake, WTP, pumping,<br />

transmission and feeder mains, are going to be completed well in advance <strong>of</strong> the distribution<br />

contracts. This will have an adverse impact on the overall realization <strong>of</strong> benefits to sections <strong>of</strong> the<br />

city scheduled for water supply house connections under the programme but who will not avail the<br />

improved consumer service until comparatively quite late during implementation.<br />

8.1.2 Finalization <strong>of</strong> Approvals & Resettlement Issues<br />

All requisite approvals and land acquisition related issues still require to be fully addressed. This is<br />

particularly the case for Bhopal, where NOC’s for the proposed land for the transfer station under<br />

the solid waste management component has yet to be given. This is also the case for the treatment<br />

plant sites, where Initial Environmental Examination (IEE) and possible further in depth<br />

Environmental Impact Assessments (EIA) may have to be conducted.<br />

Award <strong>of</strong> contracts should not be progressed unless all clearances pertaining to land, resettlement<br />

and environment have been satisfactorily resolved in full compliance <strong>of</strong> ADB guidelines and<br />

procedures. The PMU continue to instruct the Municipal Corporations to expedite the approvals<br />

process, in obtaining all related and necessary environmental clearances, for which the issue is<br />

being closely monitored.<br />

8.1.3 Disparity between WS and WW Programmes<br />

Currently all the project cities do not have adequate wastewater treatment provisions, contrary to<br />

basic environmental and health requirements. Although the UWSEIP <strong>Project</strong> includes a wastewater<br />

and sanitation component, under present ADB allocated funding, most wastewater funding has<br />

been transferred to the water supply sector.<br />

Furthermore, all cities are presently developing their water supply infrastructural development<br />

programmes well in advance <strong>of</strong> implementation <strong>of</strong> wastewater initiatives.<br />

8.1.4 JN-NURM Programme<br />

A number <strong>of</strong> projects, according to sector development <strong>of</strong> the <strong>Project</strong> Cities, are to be taken up<br />

under JN-NURM, which will effectively be complementary to the UWSEIP programme. Full<br />

coordination <strong>of</strong> the two development initiatives is imperative in order to ensure economic viability<br />

and the required levels <strong>of</strong> technical compatibility.<br />

8.1.5 Poor deployment <strong>of</strong> Staff to Municipal Corporations<br />

Community Development Expert: It is <strong>of</strong> concern that, as <strong>of</strong> yet, not one community development<br />

<strong>of</strong>ficer has been mobilized into the PIU’s and furthermore the community development expert <strong>of</strong> the<br />

DSC(W) at Indore has long since been demobilized. It is <strong>of</strong> utmost importance that this situation is<br />

quickly rectified, as the need for extensive public awareness programmes has never been so acute<br />

and gathers momentum in line with the advent <strong>of</strong> the construction phase.<br />

Furthermore, the well established DSC(E) community development experts <strong>of</strong> Gwalior and Bhopal<br />

have now been recruited across to the MPUSP DFID programme, effective from the 1 st June 2007.<br />

This “poaching” <strong>of</strong> staff has taken place without allowing any form <strong>of</strong> handover by the DSC(E) or<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

48


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

coordination to the counterpart ADB project departments by MPUSP DFID. This will inevitably leave<br />

a damaging void in the overall ADB community development programme, which will take months to<br />

recover.<br />

Construction Supervision Staff: Field supervisory staff <strong>of</strong> the PIU is considered inadequate with very<br />

little possibility <strong>of</strong> ensuring the desired degree <strong>of</strong> knowledge transfer from the DSC’s and hence<br />

substandard continuity <strong>of</strong> the supervisory stage. This shortage <strong>of</strong> staff will become more acute when<br />

all civil works contracts get well under way.<br />

File: Qt 07 Jun 2007 Text Rev (00).doc<br />

49


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

APPENDIX-B:<br />

Status <strong>of</strong> Clearances<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

APPENDIX-A:<br />

Infrastructural Improvement Progress Status<br />

Bhopal .....................................................................Sheet 1 <strong>of</strong> 8<br />

Gwalior .....................................................................Sheet 3 <strong>of</strong> 8<br />

Jabalpur ...................................................................Sheet 5 <strong>of</strong> 8<br />

Indore ......................................................................Sheet 7 <strong>of</strong> 8<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

APPENDIX-C:<br />

<strong>Project</strong> Management Staffing Status<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

APPENDIX-E:<br />

Financial Status (30 th June 2007)<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

APPENDIX-D:<br />

e-Tendering Status Report<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

CHAPTER 1<br />

Introduction<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

CHAPTER 2<br />

Fund Utilization<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

CHAPTER 3<br />

Status <strong>of</strong> Implementation Arrangements<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

CHAPTER 4<br />

<strong>Project</strong> Implementation Progress<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

CHAPTER 5<br />

Urban Water Supply and<br />

Environmental Improvement<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

CHAPTER 6<br />

Urban Governance and<br />

Institutional Development<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

CHAPTER 7<br />

Compliance with ADB<br />

Major Loan Covenants<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

CHAPTER 8<br />

Related Activities and Issues<br />

File: Qt 07 Jun 2007 Text Rev (00).doc


PROJECT UDAY<br />

(Urban Water Supply and Environmental Improvement in <strong>Madhya</strong> <strong>Pradesh</strong>)<br />

Quarterly Progress Report (QR-07)<br />

June 2007<br />

Urban Administration & Development Department (UADD)<br />

List <strong>of</strong> Appendices:<br />

Appendix A:<br />

Appendix B:<br />

Appendix C:<br />

Appendix D:<br />

Implementation Schedule Progress Status:<br />

Bhopal .....................................................................Sheet 1 <strong>of</strong> 8<br />

Gwalior .....................................................................Sheet 3 <strong>of</strong> 8<br />

Jabalpur ...................................................................Sheet 5 <strong>of</strong> 8<br />

Indore ......................................................................Sheet 7 <strong>of</strong> 8<br />

Status <strong>of</strong> Clearances<br />

<strong>Project</strong> Management Staffing Status<br />

e-Tendering Status Report<br />

Appendix E: Financial Status (30 th June 2007)<br />