29.12.2014 Views

Electronics-Illustrated-1963-07

Electronics-Illustrated-1963-07

Electronics-Illustrated-1963-07

SHOW MORE
SHOW LESS

Transform your PDFs into Flipbooks and boost your revenue!

Leverage SEO-optimized Flipbooks, powerful backlinks, and multimedia content to professionally showcase your products and significantly increase your reach.

www.americanradiohistory.com<br />

CHECKOUT AND ADJUSTMENT 7<br />

Remove all tubes from sockets and set all controls to maximum resistance. Timing adjustments<br />

should be made with a stopwatch (1/10 second accuracy) or a centisecond electric timer.<br />

Do not connect cable to dummy for steps 1 to 13.<br />

Procedure Correct Indication Possible Trouble<br />

1. Remove the AC plug and Pl.<br />

Close SI. Connect ohmmeter<br />

across Pt's socket.<br />

Approximately 60 ohms.<br />

AC short. T1 's primary open.<br />

2. Replace P1. Connect ohmmeter 10,000 ohms. B+ short. Cl leaky or pofrom<br />

pin 5 of VI to chassis.<br />

larity incorrect.<br />

3. Plug in VI. Set SI to ON. V1 should glow. P1 should light. R1 open. SRI, VI or T1 defective.<br />

4. Plug in V2. Rotate R3 to minimum<br />

resistance.<br />

V2 should glow and go out regularly.<br />

Adjust R3 for 10- second intervals<br />

between flashes.<br />

5. Step on mat -switch 53. RY1 should energize. NIT should<br />

light. V1 should glow steadily.<br />

6. Plug in V3.<br />

7. Depress then release 52.<br />

8. Set R9 to full clockwise. Depress<br />

then release 52.<br />

9. Depress 52 and release after<br />

test.<br />

10. Adjust R6. Depress 52 and<br />

release after test.<br />

Filament should glow.<br />

Meter should indicate about half<br />

scale.<br />

M1 should deflect full scale (to the<br />

right).<br />

When RYI closes; meter should drop<br />

fast to 0.<br />

R6 sets meter drop -off time to<br />

exactly 2 seconds.<br />

R2, R3, R4, R5, C3, C4 or<br />

V2 defective.<br />

Mat- switch defective,<br />

coil defective.<br />

V3 defective.<br />

RY1's<br />

V3, R8, R9 defective. .11 con -<br />

tacts open.<br />

Value of R8 incorrect. Read -<br />

just R9.<br />

R6 open. C5 defective.<br />

C5 or R6 incorrect value.<br />

11. Plug in V4. Filament should glow. V4 defective.<br />

12. Depress 52 and wait.<br />

(Release after test.)<br />

When RY1 closes, NL1 should light<br />

and MI should drop. About 4<br />

seconds later, RY2 should close and<br />

NL2 should light.<br />

13. Adjust R11 (robot timer). Adjust R11 so that NL2 lights 1.3<br />

seconds after NL1 for average competition;<br />

less time for fast guns.<br />

V4, R13, P3, R11, R10, C6,<br />

C7, RY2's coil SR3 or RY1 con -<br />

tacts defective.<br />

R11 defective .<br />

Connect robot to the control console. Step on the mat -switch. The following should happen: After a short<br />

wait (up to 10 seconds) th= dummy's eyes should light, followed 1.3 seconds later by gun's raising. Meter<br />

should drop to zero in 2 seconds. NL1 and NL2 should react at same time as the eyes and gun respectively.<br />

Continue tests;<br />

14. Plug in V5 and be sure chest<br />

plate is not touching back contacts.<br />

15. Push chest plate against contarts.<br />

V5 should not glow. RY3 should<br />

not pull in.<br />

RY3 should close. PL2 should light.<br />

(No effect on meter.)<br />

16. Depress 52. RY3 should de- energize. P2 should<br />

go out.<br />

Finally, check each of these sequences:<br />

V5 defective. C9 open .<br />

VS, R14, SR4, C8, RY3's coil,<br />

P4, R15, C9 defective.<br />

52 defective.<br />

17. Step on mat -switch. Allow eyes to light, meter to drop, arm to come up. Push chest plate. The eyes<br />

should go out, arm should remain raised. The meter should indicate more than 1.3 seconds and P2<br />

should light.<br />

18. Step off mat -switch and depress 52. Step on mat -switch and repeat step 17, except push chest plate after<br />

eyes light but before lrm comes up. The eyes should go out but the arm stays down. The meter should<br />

indicate less than 1.3 seconds and P2 should light.<br />

19. Step off the mat- switch and depress 52. Step on mat -switch and let circuits go through cycle without<br />

touching chest plate. The eyes mould light and stay lit, arm should come up, meter drops all the way,<br />

P2 does not light.<br />

If the tests up to No. 16 are successful but incorrect thereafter, the trouble is either incorrect relay contact<br />

wiring or defective relay contacts. As a final test, check il 's wiring by plugging another O -1 ma meter in<br />

.11. The panel meter should be inoperative while the second meter takes over.<br />

<strong>Electronics</strong> illustrated

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!