30.12.2014 Views

Growing from strength to strength - Skanska

Growing from strength to strength - Skanska

Growing from strength to strength - Skanska

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Delivering Contract Performance<br />

EFQM Excellence Model<br />

Accreditation<br />

An independent, internal EFQM (European Foundation for Quality<br />

Management) assessment was undertaken in November 2008, <strong>to</strong> assess<br />

our business against the EFQM Business Excellence Model and help <strong>to</strong><br />

establish a more process driven mindset within the business.<br />

Sustainability Scorecard<br />

RACI Model<br />

In addition <strong>to</strong> job descriptions for<br />

all employees, we have adopted<br />

the RACI (Responsible,<br />

Accountable, Consult & Inform)<br />

matrix <strong>to</strong> properly define<br />

everyone’s role and<br />

responsibilities, ensuring that<br />

everyone knows exactly what is<br />

expected of them.<br />

Our Management Systems have<br />

been certified <strong>to</strong> ISO 9001:2000,<br />

ISO 14001:2004 and OHSAS<br />

18001. This supports our<br />

commitment <strong>to</strong> quality,<br />

environment and health and<br />

safety standards.<br />

Integrated Management<br />

System (IMS)<br />

The IMS has evolved as our<br />

management systems have<br />

developed. All aspects of<br />

company management have<br />

been brought <strong>to</strong>gether using the<br />

IMS Portal. The portal is the<br />

entry point <strong>to</strong> a vast reposi<strong>to</strong>ry<br />

of regularly updated<br />

information including our<br />

Project Controls.<br />

<strong>Skanska</strong> implement a performance management system called the<br />

Sustainability Scorecard which measures monthly performance of key<br />

performance indica<strong>to</strong>rs.<br />

Guidelines<br />

Guidelines and publications<br />

have been developed and produced<br />

through a collaborative<br />

forum. The Contract<br />

Performance Group consists<br />

of representatives <strong>from</strong> all the<br />

<strong>Skanska</strong> UK business units<br />

and is headed up by our Chief<br />

Executive Officer. These<br />

guidelines underpin our project<br />

controls and performance.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!