PBC Control Rev: 1_09/07/09 PD<br />

Project Rev E_07/02/10<br />

3. Blocked Inlet Safety Switch: Manual-reset pressure switch field mounted on<br />

boiler combustion-air inlet.<br />

4. Audible Alarm: Factory mounted on control panel with silence switch; shall<br />

sound alarm for above conditions.<br />

5. Provide auxiliary contacts for monitoring from building management system.<br />

C. <strong>Building</strong> Management System Interface: Factory install hardware and s<strong>of</strong>tware to enable<br />

building management system to monitor, control, and display boiler status and alarms.<br />

1. Hardwired Points: as a minimum, <strong>the</strong> controller shall be capable <strong>of</strong> monitor and<br />

control <strong>of</strong> <strong>the</strong> following points (See division 15 sequence <strong>of</strong> operation for<br />

complete control requirements):<br />

a. Monitoring: On/<strong>of</strong>f status, common trouble alarm, low water level<br />

alarm.<br />

b. Control: On/<strong>of</strong>f operation, control power to open combustion air damper<br />

(if damper is utilized), hot water supply temperature set-point<br />

adjustment.<br />

2. A communication interface with building management system shall enable<br />

building management system operator to remotely control and monitor <strong>the</strong> boiler<br />

from an operator workstation. Control features available, and monitoring points<br />

displayed, locally at boiler control panel shall be available through building<br />

management system.<br />

2.6 ELECTRICAL POWER<br />

A. Controllers, Electrical Devices, and Wiring: Electrical devices and connections are<br />

specified in Division 16 Sections.<br />

2.7 VENTING KITS<br />

A. Kit: Complete system, ASTM A 959, Type AL 29-4C stainless steel or positive-pressure<br />

stainless steel 316L double-wall stack listed under UL certification number 1738, pipe,<br />

vent terminal, thimble, indoor plate, vent adapter, condensate trap and dilution tank, and<br />

sealant.<br />

B. Combustion-Air Intake: Complete system, PVC, pipe, vent terminal with screen, inlet air<br />

coupling, and sealant.<br />

2.8 SOURCE QUALITY CONTROL<br />

A. Burner and Hydrostatic Test: Factory adjust burner to eliminate excess oxygen, carbon<br />

dioxide, oxides <strong>of</strong> nitrogen emissions, and carbon monoxide in flue gas and to achieve<br />

combustion efficiency; perform hydrostatic test.<br />

B. Test and inspect factory-assembled boilers, before shipping, according to ASME Boiler<br />

and Pressure Vessel Code.<br />

CHICAGO POLICE DEPARTMENT<br />

12 TH DISTRICT POLICE STATION 15557 -6 CONDENSING BOILERS<br />

PBC-PROJECT# 09070