Project Rev E_07/02/10<br />

2.5 LOCATING TAPE<br />

A. Locating tape must be foil backed, two inches wide or greater, with a continuous message<br />

printed every 36 inches or less reading: "CAUTION GEOTHERMAL PIPELINE<br />

BURIED BELOW". The tape shall be highly resistant to alkalis, acids, and o<strong>the</strong>r destructive<br />

agents found in <strong>the</strong> ground.<br />

2.6 FIELD LOCATION<br />

A. The four outside grid bores should be surveyed after drilling is complete, but before horizontal<br />

trenching is done.<br />

PART 3 - EXECUTION<br />

3.1 DRILLING<br />

A. All drilling techniques and methods will meet local and State codes for closed-loop geo<strong>the</strong>rmal<br />

drilling.<br />

B. The vertical boreholes shall be drilled to a depth that allows complete insertion <strong>of</strong> <strong>the</strong><br />

VHE to its specified depth. The maximum borehole diameter shall be six and one-half<br />

inches nominally. If a larger diameter is required, it must be approved by <strong>the</strong> design engineer.<br />

C. The GHEX installer must be capable <strong>of</strong> operating multiple drilling rigs at once in order to<br />

satisfy aggressive schedule requirements.<br />

D. The drilling equipment shall be able to drill through consolidated bedrock formations.<br />

E. All drill casing shall be steel permanently installed and sealed into bedrock.<br />

3.2 DRILLING SPOILS AND PROCESS FLUIDS<br />

A. There shall be adequate drilling spoils management equipment on site while drilling to<br />

handle predictable spoils and drilling fluid volumes. All drilling spoils and fluids shall be<br />

contained within piping systems and construction dumpsters or settling tanks in order to<br />

maintain a clean and safe work site.<br />

B. Drilling spoils and excavated material not recycled on site shall be hauled away by a licensed<br />

waste hauler according to local regulations.<br />

3.3 Water used or brought to <strong>the</strong> surface during drilling operations shall not run-<strong>of</strong>f <strong>the</strong> site or be discharged<br />

to sewers or storm drains until filtered using filtration equipment capable <strong>of</strong> a minimum<br />

separation <strong>of</strong> 15 microns d 50 cut.<br />

3.4 U-BEND PIPE ASSEMBLY<br />

A. U-bend assembly shall have integrated concrete and HDPE weight for overcoming<br />

buoyancy and for protection <strong>of</strong> u-bend fitting during installation. If necessary, an iron<br />

(sinker) bar can be attached at <strong>the</strong> base <strong>of</strong> each u-bend to overcome buoyancy. This iron<br />

CHICAGO POLICE DEPARTMENT<br />

12 TH DISTRICT POLICE STATION 15747 -6 GROUND HEAT EXCHANGER<br />

PBC-PROJECT# 09070<br />

(GHEX) HORIZONTAL PIPING DESIGN