06.01.2015 Views

Talk by Dr. R. Chidambaram - Raja Ramanna Centre for Advanced ...

Talk by Dr. R. Chidambaram - Raja Ramanna Centre for Advanced ...

Talk by Dr. R. Chidambaram - Raja Ramanna Centre for Advanced ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Beam current (mA)<br />

Beam energy (MeV)<br />

Indus-2 Operation with Support of Solid State RF Amplifiers<br />

• In-house developed high power solid state RF amplifiers (150 kW CW<br />

output power) have been deployed to replace two non-functional<br />

klystrons.<br />

• Indus-2 current has been enhanced to 158 mA at 2.5 GeV energy.<br />

180<br />

Beam current (mA)<br />

Beam energy (MeV)<br />

3000<br />

150<br />

120<br />

2.5 GeV energy, 158 mA operation<br />

Jan 24-25, 2013<br />

158mA @ 2.5GeV<br />

January 24-25, 2012<br />

2500<br />

2000<br />

90<br />

1500<br />

60<br />

1000<br />

30<br />

500<br />

Indus-2 RF station with solid state<br />

amplifiers (75 kW)<br />

Courtesy: <strong>Dr</strong>. P.D. Gupta<br />

0<br />

0<br />

19:20 23:00 02:40 06:20 10:00 13:40 17:20 21:00<br />

Time

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!