08.01.2015 Views

Slope Stabilization Work Plan For Poplar River Management Board

Slope Stabilization Work Plan For Poplar River Management Board

Slope Stabilization Work Plan For Poplar River Management Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE OF CONTENTS<br />

EXECUTIVE SUMMARY .........................................................................................................................................1<br />

SECTION 1 -<br />

INTRODUCTION...........................................................................................................................3<br />

1.1 INTRODUCTION............................................................................................................................................3<br />

1.2 POPLAR RIVER WATER QUALITY ................................................................................................................3<br />

1.3 POPLAR RIVER MANAGEMENT BOARD........................................................................................................3<br />

1.4 PURPOSE......................................................................................................................................................3<br />

SECTION 2 - EXISTING CONDITIONS ............................................................................................................5<br />

2.1 SITE DESCRIPTION.......................................................................................................................................5<br />

2.2 POPLAR RIVER USE IMPAIRMENT................................................................................................................7<br />

2.3 SUMMARY OF MPCA 2003 NORTH SHORE WATER QUALITY AND FLOW MONITORING FINDINGS .............8<br />

2.4 SOIL CONDITIONS OF PROPOSED SITE .......................................................................................................10<br />

2.4.1 Soil Survey of Cook County .................................................................................................................10<br />

2.5 GEOLOGICAL CONDITIONS ........................................................................................................................12<br />

2.5.1 Summary of Geologic Conditions ........................................................................................................12<br />

2.5.2 Summary of Hydrogeologic Conditions...............................................................................................12<br />

SECTION 3 - POPLAR RIVER WATERSHED STUDY .................................................................................15<br />

3.1 PRELIMINARY WATERSHED INVESTIGATION .............................................................................................15<br />

3.2 WEPP MODELING OF SOURCES OF SEDIMENT ..........................................................................................15<br />

3.3 FIELD ASSESSMENT OF SLUMPS IN THE LOWER POPLAR RIVER ................................................................17<br />

3.3.1 Survey Findings ...................................................................................................................................18<br />

3.3.2 Discussion............................................................................................................................................21<br />

SECTION 4 - EXISTING SITE CONDITIONS ................................................................................................23<br />

4.1 MEGASLUMP WATERSHED INVESTIGATION...............................................................................................23<br />

4.2 POTENTIAL CAUSES...................................................................................................................................25<br />

4.3 DYNAMICS OF ROTATIONAL SLUMPS AND RIVER BANK EROSION ............................................................26<br />

4.3.1 Stream Erosion ....................................................................................................................................27<br />

4.3.2 Surface Runoff .....................................................................................................................................28<br />

4.3.3 Subsurface Saturation..........................................................................................................................29<br />

4.3.4 Wastewater Outfall ..............................................................................................................................30<br />

4.3.5 Natural Slumping.................................................................................................................................30<br />

4.4 NRRI MONITORING STATION DATA ANALYSIS ........................................................................................31<br />

SECTION 5 -<br />

MEGASLUMP CORRECTION OPTIONS...............................................................................35<br />

5.1 STREAM DIVERSION ..................................................................................................................................35<br />

5.2 J-HOOKS....................................................................................................................................................36<br />

5.3 PEAK FLOW REDUCTION ...........................................................................................................................37<br />

5.4 PEAK FLOW DIVERSION ............................................................................................................................37<br />

5.5 ARMORING ................................................................................................................................................39<br />

5.6 GRADE STABILIZATION .............................................................................................................................39<br />

5.7 CUT BACK TOP OF SLOPE ...........................................................................................................................45<br />

5.8 SUB-WATERSHED FLOW DIVERSION.........................................................................................................46<br />

SECTION 6 -<br />

RECOMMENDATIONS..............................................................................................................49<br />

6.1 STABILIZE THE BASE OF THE SLOPE WITH A VEGETATED GABION RETAINING WALL AND RIP RAP .........49<br />

6.2 WATERSHED DIVERSION AT THE TOP OF THE MEGASLUMP.......................................................................50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!