Slope Stabilization Work Plan For Poplar River Management Board
Slope Stabilization Work Plan For Poplar River Management Board
Slope Stabilization Work Plan For Poplar River Management Board
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Slope</strong> <strong>Stabilization</strong> <strong>Work</strong> <strong>Plan</strong><br />
North American Wetland Engineering, LLC.<br />
January 18, 2007 4444 Centerville Rd, Suite 140<br />
<strong>Poplar</strong> <strong>River</strong> <strong>Management</strong> <strong>Board</strong> White Bear Lake, MN 55127<br />
Phone: 651-255-5050<br />
Fax: 651-255-5060<br />
Figure 4.5: Rill erosion on the face of the slump<br />
4.3.3 Subsurface Saturation<br />
Figure 4.6: Gully erosion on the face of the slump<br />
It is possible that both surface runoff and subsurface flow may be impacting the megaslump.<br />
Subsurface saturation may be loosening and lubricating soils on the megaslump from below.<br />
This saturation may be occurring in the form of natural groundwater or seepage from the Caribou<br />
Highlands lagoons. The MPCA accepts up to 500 gal/acre/day to seep from lagoon systems.<br />
29