2.3.1.6 Monitoring and evaluation system<br />

At the program level the following evaluation activities take<br />

place:<br />

• A process evaluation of the program is implemented to<br />

provide the program management with recommendations<br />

for improvements in the strategic development of the program<br />

on an on-going basis.<br />

• A main evaluation will be carried out after five years of<br />

activities (planned for in 2011) to analyze the results and effects<br />

that have been achieved.<br />

• On an annual basis a program report is published which<br />

is informed by the annual reports of the NCE clusters.<br />

The following main indicators <strong>are</strong> used to measure the performance<br />

of the program:<br />

INDICATORS<br />

Output<br />

Results<br />

Impact<br />

• Number of partners and participants (companies, R&D, others)<br />

• Number of international partners<br />

• Number of networks/foras/meeting places<br />

• Number of participants in the before mentioned activities<br />

• Number of innovation projects: a) with R&D partners and b) with international partners<br />

• Funding from R&D programs<br />

• EU funding<br />

• Number of internationalization projects<br />

• Number of competence/knowledge projects<br />

• Increased collaboration<br />

• Improved infrastructure for collaboration<br />

• Improved innovation capabilities<br />

• Increased international orientation<br />

• Better access to knowledge resources<br />

• Improved attractiveness for investors<br />

• Increased value creation<br />

• Increased competitiveness<br />

Beside regular meetings with the cluster initiatives their performance<br />

is monitored and evaluated as follows:<br />

• At the end of each year projects shall submit an annual<br />

report with the following contents: project activities (based<br />

on standardized activity indictors), project results (based on<br />

standardized result indicators), specific project activities and<br />

results (based on the project plan), a self-assessment of the<br />

quality and progress of the development process (based on<br />

standardized self-evaluation procedures) and a discussion of<br />

interesting results, adapted for external presentations.<br />

• Evaluation of the results achieved as a basis for contract<br />

renewal. The program’s renewal of contracts with individual<br />

NCE projects will take place on the basis of two reports: a) At<br />

the end of a contract period, individual NCE projects submit<br />

their own assessment of results achieved and a description<br />

of the positive effects to which the project has contributed.<br />

Those aims, strategies and activity plans which have formed<br />

the basis of the original contract will form the basis of these<br />

assessments; b) The NCE program will also implement an<br />

external evaluation of the individual project’s activities and<br />

results. The project’s own documentation will form the basis<br />

for such evaluations, but they may also gather their own data<br />

to provide a basis for their assessments.<br />