7. PROJECT PROCEDURES<br />

7.1 PLANNING & SCHEDULING<br />

The Establishment is using the primavera system for Scheduling planning<br />

and monitoring for all our projects and the procedure will be as follows:-<br />

7.1.1 An over all detail schedule will be done showing the zones<br />

(location) description of activity, date of early start finish: actual<br />

start actual finish manpower required for every activities material<br />

approval duration, duration of material supplying, the approval<br />

of drawing for that activity and the amount of retention for every<br />

activity. In a way than an estimated curve can be plotted with a<br />

cash flow.<br />

7.1.2 The monitoring will be on a monthly progress report. Showing<br />

the percentage of every activities had been done in plus or minus<br />

and the total percentage of activities finish at the end of each<br />

month and a plot of bar will be shown as follows:-<br />

* BAR as Schedule<br />

* BAR as Progress<br />

* BAR as Critical activities<br />

and (S) curve will be plotted, the current curve(Progress curved ) with the<br />

estimated curve and it will show the situation of the project.<br />

7.2 SAFETY PLAN<br />

The Establishment considers safety is the first and most important in the<br />

scope of construction that is why procedure of safety is a part of training<br />

program for our main power and senior staff on a monthly basis and to<br />

control the safety, at site the following procedures has to be followed.<br />

7.2.1 A Safety engineer will be provided at site with assistants to check<br />

all the field of construction and to issue thee safety requirements for<br />

all type of work as required.<br />

7.2.2 Safety shoes and helmets will be provided for all workers and will<br />

be charged on the worker who will not implement the requirement<br />

of safety.<br />

7.2.3 Safety warning sign will be provided all over the site with all flags<br />

warning tape warning lights and warning traffic cones etc.<br />